Free Notice (Other) - District Court of Federal Claims - federal


File Size: 520.6 kB
Pages: 12
Date: April 21, 2005
File Format: PDF
State: federal
Category: District
Author: unknown
Word Count: 1,437 Words, 9,390 Characters
Page Size: 622 x 792 pts
URL

https://www.findforms.com/pdf_files/cofc/17610/62-17.pdf

Download Notice (Other) - District Court of Federal Claims ( 520.6 kB)


Preview Notice (Other) - District Court of Federal Claims
Case 1:04-cv-00473-MBH

Document 62-17

Filed 04/22/2005

Page 1 of 12

Case 1:04-cv-00473-MBH

Document 62-17

Filed 04/22/2005
~ NO.

Page 2 of 12
PAGE 1

REQ,.. 5T FORPURCHASE WARRENAFB ONS
JGH

FQDEUD12500200 DAT~7_SEP_0i
CLASS

Zl19

30 CPTS/FMFL 90TH CIVIL ENGINEER SQUADRON/CECE

CONTRACT PURCHASE ORDER OR eELWERY ORDER NO.

IT IS REQUESTED THAT THE SUPPLIESAND SERVICESENUMERATED HELOW AND~N THE ATTACHED LfST HE ..... ~URCHASED FOR FOR DELWERY TO

MANNELLA/4768
QUANTr~ UNE

07-OCT-01

CLASSCODE: Z11904 THIS REQUIREMENT BEENPROVIDED HAS FOR IN THE HQ AFSPC FINANCIALPLA~. S FORFY 02. NOOBLIGATIONS BE MAY INCURRED WITHOUT CERTIFICATION AVAILABILFrY oF OF FUNDS.
0200

$

CONTRACTURAL SERVICESTO REPLACE ROOFON BUILDING 1284. PROJECT NUMBER 03-1007A I have reviewed requirement, the incl~Jdingavailabletechnical documentation, believe that it doesnotrequirethe contractorto and use ClassI Ozone DepletingSubstances (ODS) identified in A~r Force Policy, nor is it writtens_othat it canonlybeme.tby useof a. Class 10DS.

1 JB

348,900.40

~48,900.40

TOTAL $

¯ 348,900.40

PURPOSE - IDIQ ROOFING BLDG APA 12~4

TELEPHONENO. 2124

3400 301 83Mi ~.3~8284

234421

0~0000

52100 35878F

662400

F62400

AF FORM MAR77 (EF) 9,

*Generated

by

ABS~

.,~

Case 1:04-cv-00473-MBH

Document 62-17

Filed 04/22/2005

Page 3 of 12

Case 1:04-cv-00473-MBH

Document 62-17

Filed 04/22/2005

Page 4 of 12

06 September 2001 FYO1Roof Requirements Contract Statement of Work

roofs sections. Worksha~ be performedon the areas indicated: A_feas 1- 8 need a complete roof replacement. The Contractor shall c~mpleteIy r~moveand dispose of existing BURS insulation underlaymant to the and deck/rig and ~ a new fully adhered EPDM roof system including insulation~ This workshall also include the replacementof the mechanicallyfastened wall mounted reglet, any necessary remgval rebending, and refastening of the parapet " , coping, workingaround, restoring and testing lighming protection system and ~ incidental worknecessary to provide a fully functional roof. RequiredSubmittals: As per specifications Section 01000, Parts 1.12 and 1.13, the written guarantees, warranties, and any other items listed on the attached AFForm66 are hereby specified as required submittals for this delivery order. The l~ngth and terms of each wag_~anty shall meet the minimum requirements as Set forth for that type of roofing system in the dontract specifications. : 3. A/1 roofing and related workshall be performedin accerdance with the specifications of the requSrements contact, any attached drawings, and the line item list. - 4. PerformancePeriod: All work shall be completed 70 calendar days after receipt of the Notice to Proceed.

Case 1:04-cv-00473-MBH

Document 62-17

Filed 04/22/2005

Page 5 of 12

Case 1:04-cv-00473-MBH
~. ~,~'n ON NARRENAFB
"FR~CT[NG OFFICER

Document 62-17

Filed 04/22/2005
NO.

Page 6 of 12

PAGE 1

. REQL ...J

FORPURCHASE

FQDEUD12530300 DATE 29-SEP-01
CLASSz119

ONS JGH U0 CPTS/FMFL

OEUW~Y NO. OP~ER

~90TH CIVIL ENGINEER SQUADRON/CE ..,,., Fr IS REQUESTED SUPPLIES SERVICES MEP~,TBD AND THE THaT THE AND EN U BELOW IN ATTACHED BE LIST, MENNELLA/4768 ] QUANTITY CLASS CODE: Z11904 PROJECTNUMBER:(~2-1011D THIS REQUIREMENT BEENPROVIDED HAS FORIN THE HQ AFSPC.FINANCIAL PLANSFORFY 02. NO OBLIGATIONS MAYBE INCURRED WITHOUT CERTIFICATION AVAILABILITY OF OF FUNDS: 0300 CONTRACTURAL SERVICESTO REPLACEROOFING MULTI ON BUILDINGS. I havereviewed requirement, the including availabletechnical documentation, believethat it doesnot requirethe conb'actor and to use Class I Ozone Depiel~ng Substances (ODS) tdenlEied in Air Force Policy, nor is it w~ittenso that it canonly be metby pseof a Class 10DS. 1 IJB ¯ 226,187.68 226,187.68 $ 10-OCT-01

TOTAL

22.6,187.E

~u~osE APA- IDIQ ROOFING MULTI ~DATE

29-SEP-01

//sz~*//

qN31NGCtASSIFICA~ON ~400 301 83MI 234421 010000 52100 35878F 662400 F6i400 Ll8288 AA PSR:052120 DSR:011723

AMOUNT 226,187.68

~o s~/~= 4Bz-szo~ AF FORM MAR (EP-) 9, 77 *Generated ABSS by

..

IIU _

Case 1:04-cv-00473-MBH

Document 62-17

Filed 04/22/2005

Page 7 of 12

Case 1:04-cv-00473-MBH

Document 62-17

Filed 04/22/2005

Page 8 of 12

D.O. SO0~
¯ FYOIRoof RequirementsContract Statement of Work

10 September 2001

Buikl~u~720 requires partial ro0freplacement. This buildiugconsist of several roofs .." sections. Workshall be performedon the areas indicated: Areas 10 &l 1 need a complete roof replacement. The Contractor shall completely removeand dispose of existing Ballasted EPDM insulation, underlayment to and the decking and install a newfully adhered EPDM system including roof insulation. This workshall also include the replacementof the mechanically fastened wall mountedreglet; any removal, rebending & replacing alumluum copingand all incidental worknecessary to provide a fully functional roof. Conduitis Imow exist on the under side of the decking. Con~actorshall protect to conduit from damageduring the performanceof this delivery order. 2. :Buildin~ 1200 requires complete roofrepIacemen~. The Contractor shall completely removeand dispose of existing BURS, foamand insulation underlayment to the decking and install-a new fully adhered EPDM system including insulation. This. roof workshall also include the replacement of the mechanically fastened wall mounted reglet, drip edge flashing, gutter lining and aB incidental worknecessaryto provide a fully functional roof. 3. Buildin~ 65 requires partial roof replacement. The ContractOr,shall complet.ely removeand dispose of existing BURS insulation underlayment to the decking and and install a newfully adhered EPDM system including insulation. TNswork ioof .shall also include thereplacement of the mechanicallyfastened wall mountedreglet, drip edge flashing; any removal, rebending & replacing aluminum coping and all incidental worknecessary to provide a fully functional.roof. Submittals: As per specifications Section 01000, Parts 1.11 and.l.37, the 4. Requ~ed written guarantees, warranties, and any other items listed on the attached AFForm66 are herebyspecified as required submittals for this delivery order. Thelength and terms of each warranty sha[1 meet the minimum requirementsas set for~ for that type of roofing systemin the contract specifications. 5. All roofing and Selated workshall be performedin accordancewith the specifications of the requirementscontract, any attached drawings,and the line item list. 6. PerformancePeriod: A~ workshall be completed 45 calendar days after receipt of the Notice to Proceed:.;

Case 1:04-cv-00473-MBH

Document 62-17

Filed 04/22/2005

Page 9 of 12

Case 1:04-cv-00473-MBH

Document 62-17

Filed 04/22/2005

Page 10 of 12

REC.. JTFORPURCHAS
~.AT1ON

FQDEUD12500300
DATE

~/ARRENAFB
RACTING OFFICER

19-OCT-01 Z119

,ONS 90 CPTS/FMFL 90TH~CIVIL ENGINEER SQUADRON/CECE

IT IS REQUESTED THAT THE SUPPLIES AND SERVIC~ E N UM ~RATE~3~E~LOW AND IN THE ATTACHED ~ST. BE PURCHASED FOR FORDELIVERY TO NOTLATERTHAN

MENNELLA/4768

07-OOT-01
~'TIMATED UNE ES~ M, ATED TO~AL

$ 0300 CONTRACTURAL SERVICESTO REPAIR ROOFONBUILDING 1250. PROJECT NUMBER 02-1011B. I have ~eviewed requirement, the including availablet .=chnical documentation, believethat it doesnot require th contractorto and use Class I Ozone Depleting Substances (ODS)iden ~edin Air Force Policy, nor Is it written so that it canonlybeme useof a :by Class 10DS. 1 JB 339,300.00 339,300.00

TOTAL

339,300.0[

~uRPoss iD}Q - ROOFING BUILDING 1250

I'n~EPHONENO. ~OOD,JULA~,DS09 M. ANALYST css/c~ 4BI~5291 //SZ~*//

AMOUNT 23400 302 83MI 234421 010000 52100 I1978F J:AI8285 ~_~_,,~%CP~q: FSR: 002270 AA PSR: 102345 DSR: 004924 66 ~.400 F62400

~o ~/~

.?

Case 1:04-cv-00473-MBH

Document 62-17

Filed 04/22/2005

Page 11 of 12

o g °

Case 1:04-cv-00473-MBH

Document 62-17

Filed 04/22/2005

Page 12 of 12

D.O. 500/¢ Fir01 Roof Requirements Contract Statement of Work

06 September 2001

1. Building 1250 requires completeroof )~placement. This building consists of several roofs sections. Workshall be performedon the areas indicated: Areas 1- 5_ need a complete roof replacement. The Contractor shalt completely removeand dispose of existing BURS insulation underlayment to the aud decking and install a newfully adhered EPDM system including insulation. roof This workshall also include the replacementof the mechanicaBy fastened wall mounted reglet, any necessary removal, rebending, and refastening of the aluminum coping, installing drip edge, lining gutters and all incidental work necessary to provide a ft~y functional roof. Coordinate function madoperation of the micro-wavedish during periods of construction. Workalso includes demolition of the existing lightening system without replacement. 2. R~quiredSubmittals: As per specifications Section 01000,Parts. 1..12 and 1.13, the written guarantees,.warranties, and any other items listed.on the attached AFForm66 are hereby specified as required submittals for this delive~y order. Thelength and terms of each warranty shall meet the minimum requirements as set forth for that " ~e of roofing system inthe contract specifications. 3. A~roofing and related workshall be performedin accordancewith the specifications of the requirements contract, any attached- drawings,and the line item list. 4. PerformancePeriod: All workshall be completed75 calendar days after receiptof the Notice to Proceed.