Case 1:04-cv-00473-MBH

Document 62-16

Filed 04/22/2005

Page 1 of 14

Case 1:04-cv-00473-MBH

Document 62-16

Filed 04/22/2005

Page 2 of 14

Case 1:04-cv-00473-MBH

Document 62-16

Filed 04/22/2005
~" ,~ '...--.-.

Page 3 of 14
PAGE 1 FQDEUD11780200 DATE 27-JUN-O1 CLASS Zl19

F

~="~"~~b E WARREN AFB CONS CPTS/FMFL

~TFORPORO,ASE

90TH CIVIL ENGINEER SQUADRON/CECE :: ~ IT IS REQUESTEDTHE THAT SUPPLIES SERVICES AND ENUMERATEBIJ~L~v E ATFACHED BE AND TH IN ,LIST, J MENNELLA/4768QUANTITY

27--JUL-01
ESTI)~,TFJD UNFF PRICE

CLASSCODEZ11904 PROJECT GHLN # 01-1004 I havereviewed requirement, the including available technical documentation, believe that it doesnot requirethe contractorto and useClassI Ozone DepletingSubstances (ODE) identified in Air Force Policy,nor is it written so that it canonly bemetby useof a Class 1 COS. t CERTIFY THATFUNDS ~NILL BE AVAILABLE EFFECTIVE JUL 1 01 UNLESS YOUARE ADVISEDTO THE CONTRARY BEFOR ~ i E THATDATE. & (NON-HOUSING) 0200 REPLACE REP/{IR MULTIpI~EBASEROOFS 1 JB

$

3.70,000.00"

370,000.0

TOTAL PURPOSe

REPLACE REPAIRMULTIPLEBASE ROOFS(NON-HOUSING) &

370'000"0 t

DATE

..

1400 301 B3MI 234421 010000 52100 3587BF 662~00 F62400 ~8232

AFFORM MAR (EF) "; 91 77

*Generated byABSS

Case 1:04-cv-00473-MBH

Document 62-16

Filed 04/22/2005

Page 4 of 14

Case 1:04-cv-00473-MBH

Document 62-16

Filed 04/22/2005

Page 5 of 14

n.o. soo¢
FYO1Roof Requiremenfs Contract Statement of Work

28 June 2001

Building 222.needs a total roof replacement. The Contractor shall completely remove and disposeof the existing shingles and felt and install i laye~ of new.felt and I layer of 1-00 mphWindWarrantedThree Tab Shingles as well as all necessary flashings and ridge caps¯ Building 224 needs.a total roof replacement. The Contractor shall completely remove and dispose ofthe existing shingles and felt and install 1 layer of newfelt and 1 layer of 100 mphWindWarrantedThree Tab Shingles as well as all necessary Ilashings and ridge caps. Buildin~ 226 needs atotalroofreplacement. The Contractor shall comptetoly remove and dispose of the exigdngshingles and felt and install 1 layer of newfelt and 1 layer of 100 mphWindWarrantedThree Tab Shingles as well as all necessary flashings and ridge caps. ,: . Buildina-~l~2 needfa total roof replacement including dormers. The Contractor shall completelyremove dispose of the existing shingles and.felt and install 1 layer of and newfett and 1 layer of 100 mphWindWarrante Three Tab Shingles as well as all d necessary flashings madridge caps¯ Noworkwill be performedon the elevator roof except for flashing at shaft- mainroof intersections. Building 341_ needs a partial roof replacement.. The Co~_actorshall compietely remove dispose of the existing Shingles and felt on the roof of the mainbuilding mad and the loft roof and install 1 layer of newfelt and 1 layer of 100 mphWind WarrantedTh~reeTab Shingles as.well as all necessary flashings and ridge caps. No workwill be performedon the roof over the western building expansion or eastern drop off canopy. ¯ Buildin~ 315 needs a total..r~0freplacemant. The Contractor shall completely remove and dispose of~e existing~hingles and felt and install 1 layer of newfelt and 1 layer of 100 mphWindWarrantedThree Tab Shingles as well as all necessary flashings and ridge caps. In addition, the Contractor shall completely remo-~eand dispose of the existing BURS over the west extension and replace it with a rally adhered roof EPDM roofing system. This work shall include the replacement of the mechanically fastened wall mountedreglet and any necessary removal, rebending, and refastening of the parapet coping. Also, the gutter on the east side of the building (15 LF) shaB. be removedand replaced, and a newdownspoutinstalled. Buildin~ 1284needs a:p-af6al roof replacement¯ This building consists of several different roof areas. Work shall be performedon the areas indicated. Each area requires complete roof replacement. The Contractor shall completely removeand

Case 1:04-cv-00473-MBH

Document 62-16

Filed 04/22/2005

Page 6 of 14

dispose of existing BURS insulation underlaymentto the decking and install a and newfully adhered EPDM system including insulation~ This workshall also " roof include the replacementof the mechanicallyfastened wail mounted reglet, any necessary removal, rebending, and refastening of the parapet coping, sealing building exR~!..onjoint, and all inci~Iental worknecessaryto provide a fully functional roof. Building 250 requires installation of standing seammetal roof over newly c0~truc~edporch including all. necessary flashings and accessories. The standing seam:metal.panelsshall be shop painted to matchthe historic red color o~the exisdug metal roofs. Penetrations through underside of tongue and groove planking is not acceptable. 9. Bld~ 212 requires minor roofrepaks includiug: securing loose shingles and step flashing around.chimneys,properly securing all ridge cap, installing EPDM gutter liner to rear porch gutter, patching east valley EPDM all incidental work and necessary to provid~.a fi~y functibnal roof. t0. Rei~ui~edSubmittals: As per specifications Section 01000,:Pgrts !.12 and 1.13, the writteh guarantees, warranties, and any other items listed on,the, .attached AFl~orm66 are here.by specified.as required submittals for this delivery order,. Theleng~ an d tern!s of~each warranty Shall meet the minimum requirements asset forth for that type gf rootigg systemin the ~0ntract specifications. 11. All roofing and related workshall be performedin accordancewith the specifications of the requi/ementscontract, any attached drawings,and ~the line item ~ist 12. Per~d~ncePeriod: All workshall be completed 120 calendar days after r~ceipt of the NoticetO Proce~d~ "

Case 1:04-cv-00473-MBH

Document 62-16

Filed 04/22/2005

Page 7 of 14

Case 1:04-cv-00473-MBH
REQ,...iT ~VARREN AFB
TRACT]NG OFFICER

Document 62-16

Filed 04/22/2005
:~

Page 8 of 14
PAGE I

FOR PURCHASE

NF°(~DEUD12720100 29-SEP-01 "CL~SSz161 ,',EUV~Y ORDE~

:ONS ~u CPTS/FMFL 90TH CIV L ENGINEER SQUADRON(CECE

J MENNELLA/4768

/ QUANTITYUNIT $

29-OCT-01

DESCR[P33ON OF MATERIAL OR SERVICES TO BE FuRcHAsE~

CLASSCODE: Z16104 PROJECT# 02-1011F I havereviewed requirement,¯including the available technical documentation, believe that it does require the contractorto and not use ClassI Ozone DepletingSubstances (ODS) identified in hJr Force Policy, nor is it written so that ~t can0nlYbemetby useofa Clas~ 1 ODS. OlOO REPLACE BASE HOUSING ROOFS (MCP) 1 JB

$

65,600.00

65,600.00

_F

TOTA~

65,600.0C

~UR~OSE REPLACE BASE HOUSING ROOFS DATE

DATE 2B-SEP-01

l/sz~*//

.7045 831 83Mi P72262 234421 52200 35878F 662400 F62400 ~1.8305 ¯ .~: ~ FSR: 001368 PSR: 039390 ~: 008018

AF FORM MAR77 (EF.) 9,

*Generated ABSS by

Case 1:04-cv-00473-MBH

Document 62-16

Filed 04/22/2005

Page 9 of 14

Case 1:04-cv-00473-MBH

Document 62-16

Filed 04/22/2005

Page 10 of 14

29 Sept. 01 FY 01 Roof Requirements Contract Statement of Work BuiIdin~ 1900,. !926 & 1933, single story duplexes loca/ed~ in ~CPHousing, need a tgtal robfreplacemeat, Oneach unit; the contractor sha]l completely.remove and dispose of the existing builtup roofing sys4emdownto ~e wooddecking and i~stall: a.ngw fully, adhered EPD s~ngle ply roo~g system, includinginsulat~n: and all M . necessary.drip edge and eav~flashing; The.contractor sha~ ins/atI.~ood:nailers as ' necessary tocorrectly h~tall'the.newpIy system single EPDM .: All,the existing ." gutters and.downspouts to be sa%dand attached into the newir~sta[lafi0n. Where are .~~ .! ¯ raixt digerts currently exists over the~front door of each unit; simila~ rain cli~,erts. .,. .... .. (gravel st0PW!.th2" lip sad 5"-6" face) shall be installed in th6newroof. All roofing and related work-shall be performedin accordance.with thespecificafio~s of the requirementscontrac~anyattached drawings, and l~e items~list.. ¯ .. . i:;.: . ~: " : .... .:.3 .

PerformanCe Period:.All.wotk shall be completed20 calendar da~s~,a~.~erreoeipt~qf.Ne ~ ,.., Noti~ to.procegd. .

Case 1:04-cv-00473-MBH

Document 62-16

Filed 04/22/2005

Page 11 of 14

Case 1:04-cv-00473-MBH

Document 62-16

Filed 04/22/2005
NO.

Page 12 of 14 1 PAGE

REQ,_ 3T FOR PURCHASE WARRENAFB tONS 90 CPTS/FMFL -~ROM: RC,,C (P~ert 90TH CIV~t.ENGINEER SQUADRON/CECE "

FQDEUD12500100
DATE

07-SEP-01
CLASS

Zl19

~T IS REQUESTED.THAT SUPPLIES THE pJ4a SERVICES ENUMEPJkTED BELOW IN THEATTACHED AND LIST, BE
PURCP~SED FOR

MANNELLA/4784
fTEM

FaR~L~r'~J:wT 9

¯ NOT[A~ THAN

07-OCT-01

CLASSQODE!Zl1904 THIS REQUIREMENT BEENPROVIDED HAS FORIN THE HQ AFSPC EJNANCiA[. PLANS FORFY 02. NOOSLiGATiONS MAYBE INCURRED WITHOUT CERTIFICATION AVAILABILITY OF OF FUNDS. 010o CONTRACTURAL SERVICES TO REPLACEBASE ROOFS ON BUILDING 1284. PROJECT NUMBER 03-1007B I havereviewed requirement, the includingavailable technical docgmantation, believe that it doesnet require the contractorto~ and use Class i.Ozone Depleting Substances (ODS) fdentified in Air .... Force Policy, nor is it written _sothat it canonly bemetby useof a Class 1 aDS. I JB .... ,. 117,5'28.84 117,528.84

TOTAL

117,528.84

PUR~OS~ - IDiQ - ROOFING BLDG APA 1284 I /szm,,'~*/ /

/ / szGz~'~* //

"13400 A18283 AA ..~/~

301 FSR:

83HI

234421 PSi:

0i0000 052120

52100 ]~SR:

35878F 008378

662400

F62400 AM~OUNT 117,528.84

001361

~-s~-~

9.0

~/~

~-s~o2

FORM9, M~ 77 (EF) *Gene~ted by A~SS

Case 1:04-cv-00473-MBH

Document 62-16

Filed 04/22/2005

Page 13 of 14
o

Z

Case 1:04-cv-00473-MBH

Document 62-16

Filed 04/22/2005

Page 14 of 14

D'Fy~50R~ RequirementsContract o~f Statement of Work

06 September 2001

Building 1284requires partial roof r~l~l~ement. This building consist of several roofs sections. Work shall be performedon the areas indicated: . ¯ Areas 9- 15 need a complete roofreplacement. The Contractor sh~.~ ~0mpletely removeand dispose of existing BURS insulation underlaymentto the mad decking and install a newfully adhered EPDM system including insulation. roof This workshall a~o include the replacement of the mechanicallyfastened wall mounted reglet, any necessary removal, rebending, and refastening of the parapet coping, workingaround, restoring and testing lightning protection system and all incidental worknecessary to provide a fully functional roof. 2. RequiredSubmittals: As per specifications Section 0t000, Parts 1.12 and 1.13, the written guarantees, warranties, and auy other items listed on the attached AFForm66 are hereby specified as required submitt~s for this delivgry order. Thelength and terms of each warr_antyshall meet the minimum requ2rementsas set forth for that type.of roofing sygtem the contract specifications. in 3. All roofing and related workShall be performedin accordancewith the specifications of the requirementscontract, any attached drawings,and the line item list. 4. PerformancePeriod: All work shall be completed/calendar days after receipt of ¯ the Notice to Proceed. [ if-

2