Free 52539.pdf - Indiana


File Size: 40.7 kB
Pages: 2
File Format: PDF
State: Indiana
Category: Government
Author: IDEM
Word Count: 463 Words, 3,201 Characters
Page Size: Letter (8 1/2" x 11")
URL

http://www.state.in.us/icpr/webfile/formsdiv/52539.pdf

Download 52539.pdf ( 40.7 kB)


Preview 52539.pdf
OAQ PROCESS INFORMATION APPLICATION PI-02E: Combustion ­ Kilns
State Form 52539 (R / 1-07)

INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

IDEM ­ Office of Air Quality ­ Permits Branch 100 N. Senate Ave., MC 61-53 Indianapolis, IN 46204-2251 Telephone: (317) 233-0178, or Toll Free: 1-800-451-6027 x30178 (within Indiana) Facsimile Number: (317) 232-6749 www.idem.IN.gov/permits/air/index.html

NOTES:

· · · ·

The purpose of this form is to specify details that pertain only to kilns. Complete one PI-02E form for each emissions unit. If there are multiple emission units that are identical in nature, capacity, and use, you may use one PI-02E form to summarize the units. Detailed instructions for this form are available online at

www.idem.IN.gov/permits/air/apps/instructions/pi02Einstructions.doc .
All information submitted to IDEM will be made available to the public unless it is submitted under a claim of confidentiality. Claims of confidentiality must be made at the time the information is submitted to IDEM, and must follow the requirements set out in 326 IAC 17.1-4-1. Failure to follow these requirements exactly will result in your information becoming a public record, available for anyone to inspect and photocopy.

PART A: Process Unit Details Part A specifies operating information that is unique to kilns. Definitions and additional explanation of terminology are included in the instructions for this form. 1. Unit ID: 2. Processed Material: Portland Cement Lime Brick or Clay Products Other (specify): 3. Configuration: 4. Type of Kiln: Rotary Calcimatic Dry Process Fluidized Bed Preheater Preheater / Precalciner Process Regenerative Wet Process 5. Material Throughput (specify units): 6. Fuel Used: 7. Heating Method: 8. Length of Burn Time (specify units): 9. Does this source have a pre-dryer / pre-heater? If yes, attach completed PI-02B. Yes No Natural Gas Only Periodic Tunnel Other ­ Attach completed PI-02F. Vertical Attach this PI-02E to the completed PI-15. Attach this PI-02E to the completed PI-13. Attach this PI-02E to the completed PI-05.

This space was intentionally left blank.

Continued on Next Page

Page 1 of 2

Indiana Department Of Environmental Management Office Of Air Quality State Form 52539 (R / 1-07)

Process Information - Combustion FORM PI-02E Page 2 of 2

PART B: Emission Controls and Limitations Part B identifies control technology, control techniques or other process limitations that impact air emissions. 10. Add-On Control Technology: Identify all control technologies used for this process. Attach completed CE-01 (unless "none"). None Baghouse / Fabric Filter ­ Attach CE-02. Electrostatic Precipitator ­ Attach CE-04. Oxidizer / Incinerator ­ Attach CE-06. Condenser ­ Attach CE-08. Other (specify): Cyclone ­ Attach CE-03. Absorption / Wet Collector / Scrubber ­ Attach CE-05. Adsorber ­ Attach CE-07. NOX Reduction ­ Attach CE-09. ­ Attach CE-10.

11. Control Techniques: Identify all control techniques used for this process.

12. Process Limitations / Additional Information: Identify any acceptable process limitations. Attach additional information if necessary.

This space was intentionally left blank.