Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 1 of 25
~iUNITEDsT/ITEs~O.%'TAL IndL.lite Quantity SERVICE. Contract/Cons, .,ction
ContractNumber 162640-96-B-0096 WorkDescdp~on LOCKBOX RENOVATION Manager LOIS A GUNLOGSON Renewal Option Base Year Work Order Number 5.00 Date I0/10/1997
FacllI~ Loca~on WELLINGTON, IL - MAIN OFFICE Contract Price
See.
Item
WorkDescription DRYWALL & TILE
Units
Qty.
Totals
o81i
00 i08
18 gage, drywall, up to 4 7/8" deep, 7'0" high, 3'0" wide, single
EA
$93.50
1
$93.50
092
5O 005
Accessories such as corner bead, casing bead, and J.L.U bead
LF
$0.79
i0
$7.90
092 I
5O 014
Drywall, corner or casing bead, galvanized, including applying compound
LF
$0.93
I0
$9.30
o92l
5O 022
Finishing metal stud partition, including 25 gauge by 3 5/8" metal studs and run/ler channels, 1/2" £p~psum hoard, finished both sides, for walls up to i0' high
LF
$17.11
300
$5,133.00
Premium Price IQCCITEM, October 1995 875
ItemsTotal
$19,333.65
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 2 of 25
~
UNITED STATES POSTAL SERVICE~
Ind
nite QuantityContract/Con~Jction
Gontract Number 162640-96-B-0096 WorkDescription LOCKBOX RENOVATION
Manager LOIS A GLRqLOGSON
I
FIXED
RenewalOption Base Year
I Work Order Number 15,00
Data
lO/O6/199~
Facillt~ ho~at]on WELLINGTON, IL - MAIN OFFICE
ListofNegotia~dltams: NEGOCIATED ITEM - INSTALL USPS FURNISHED BLR/DLE DROP. PRICE $68.35 QTY-1 NEGOCIATED ITEM - 3/4 QUARTER PINE. PRICE $1.60 QTY-10 ROUND CUSTOM
$58.00
$~3.~9 $3~.8o
$90.00
NEG. ITEM - MORTISE LOCK, LEVER, FRONT, ONE MOTION SCHT-J~GE L9080 NEG. ITEM - INSTALL COUNTER NEG. ITEM - INSTALL FUR/qISHED
ON
HANDICAP
PHONE OUTLET
$60.70
NEG. ITEM REPAIR CEILING TILE IN WORKROOM & BOX LINE AFTER DEMOLITION Total of Negotiated Items: Travel Expenses: Per DiemAmount Lodging Amount
$130.01
$665.20
$o00
$.oo $.oo $.oo
Other Expense Mileage Amount Travel Amount Subtotal: WorkOrder Total:
$19,998.85
876
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 3 of 25
CONTRACT
WOR.
K
OFiDE|
Group, |nc.LP. C~nsuRing 10401 75thAve. S. Palos Hills,, |L 60465-2015
DESCRIPTION UNIT UNIT hlEAS PRICE EXTE|
150.~° /
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 4 of 25
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 5 of 25
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 6 of 25
oo
1 oo
.I
880
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 7 of 25
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 8 of 25
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 9 of 25
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 10 of 25
(:0111 ItiEll " ~.
01' ~ WOIIKOiIOEll " I'
,. -" " ,,, o',,..'I ¯
TOI'AL. ..
.. ." -. .-
)
¯ o.
¯
¯
884
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Date
Page 11 of 25
~
UNITED ST/3TES SERVICE.
,:acility andFixedMechanization Project ContractPayment Authorization
4211B
I Contro~ Number
~staIIafionName WELLINGTON - MAIN OFFICE (168310-001) WELLINGTON, IL 60973-9998 Des~ptionofWo~ LOCKBOX RENOVATION Project AuthorizationNumber 7-4J-168310-C-639 Contract Number ChangeCode I B/A Finance Number I FMS Project Number
L
116=640-96-~-008~
I A=ouot I Index (5~c 861251 sac I
PaymentAmount
(From Summary 15} L~
Oo
I ~61~o
Progress Payment
I
Summary
&A Bldg Constr
1. Initial Contract Amount 2. Approved Change Amount Total ContractAmount to Date (Lines 1 + 2) 4. Valueof Work Complete{ to Date
Amount Retainage o£ PayeeiNameand ~ress: LP CbNSULTING GRF INC ¯ 10401 S 75TH-AVE PALOS HILLS ,LL~L 604'65-2015 6. SubTotal (Line 7. Previous Payment Amount 8. Amount this payment of ilnvoice Description: (Lines6 - 7) PDCUse Only: VDRCode:
PaY'°ent I '#,d~'7
ContractorCertification
[] ~in~, ~a~ment
Architect-Engineer Representative By I Date Signed
A-ERepresentative Title, Company, Address
I/i,t ~! ~"7
Date Signed
Design/Construction Management Representative ' Fo~t PaY~fz~t -Prepared By I BET~ L CH~S (708) 563-7224 Conta~ Felon LOIS A G~OGSON C~ IL DISTRICT 6801 W 73~ STREET BEDFO~ IL 60~49-9991 I DateSigned
Form 42"{1B. October1995- 20260-642~. 8,00 ~ev
885
Case 1:98-cv-00868-FMA
~ UNITEDST/3TES
Document 98-9
Filed 04/06/2005
Page 12 of 25
~ poST/fL SERVICE.
act Number 162640-96-B- 0094 WorkDescription ProjectAuthori~tionNumber 6-4J-166954-C-009 LP CONSULTING GRP INC L0401 S 75TH AV~ PALOS HILLS IL 60465-2015
Indefinite Quantity Contract/Co6struction
RenewalOption Base Year WorkOrderNumber 2.01
BRUCE J ROTHEP@4EL
Facili~ Location ~ST DAVID, !L - M-bIN OFFICE Pr~ectNumber J37301 Date Ii/20/1997 U.S. PostalSe~ice CENTRAL ILLINOIS 6801 W 73P33 ST BEDFORD PARK IL 60499-9991 I Performance Time 130 days
Contracting Authoriz~/~re/~__ ~! Attachment¢: "-.-9
O~cer /,~
Date
........ I
Date
ROBERT
A
Ri~B~gV~
Summary this WorkOrder: of 0.8500 DefaultMultiplier: Total Miscellaneous: Total Items Cost: Total Travel Cost: Work Order Total for 2. O1 Work Order History: 2.00: $31,932.72, $ O. 00 $39,932.63 $39,932.63
~~
886
Case 1:98-cv-00868-FMA
POST,'IL SERVICE~LINITEDST/3TE5 Indefinite C ",-act Number 3 ~40-96-B-0094 WorkDescription MODULAP. SITE
Document 98-9
Filed 04/06/2005
Page 13 of 25
Quantity Contract/Construction
Manager BRUCE J ROTHEP~MEL
I
RenewalOption Base Year Facllit~ Location ST DAVID, !L -
Work Order Number 2.01 MAIN OFFICE Contract Price
Div,
Sec, Item
WorkDescription DEMOLiTON
Units
Totals
022
O0 002
Excavate for sidewalk, utility trenches, or other trenching, new paving and haul away. 0 - 50 cu. ydso
YDS 3
$7.96
165
$1,313.40
022
O0 OO6
Trench excavation for new footing placement, utilities and other trench excavation, store excavation material on site. 0 - 50 cu. yds.
YDS 3
$5.30
1240
$6,572.00
022
O0 014
Backfill with off site pit or bank run granular material, costs include hand tamping. 0 -50 cu. yds.
YDS 3
$ii.49
90
$i,034.10
022
O0 019
Base material below paving, compaction, 0 - 50 cu. yds.
including
YDS 3
$15.03
390
$5,861.70
OOi 029
Surface
grading
SF
$0.04
8400
$336.00
022
O0 O38
Plow or scarify subgrade to a uniform depth of 6", then, recompact as specified in sectiom 02.2 00 000.
SY
$1.39
933
$1,296.87
025
13i 010
Bituminous paving, including patching, base course, 4" thick
SY
$6.33
600
$3,798.00
025
13 013
Tack coat
SY
$0.53
263
$13~.3~
$839.80
025
13 026
Minimum charge duty equipment
for paving, when heavy is required.
JOB
$839.80
025
13 037
Bituminous paving, including patching, surface course,3"
SY thick
$5.23
600
$3,138.00
025
15
OO9
Curb and gutter removal, includes bulkhead curb. 0 - I00 LF
LF
$3.98
-130
$-517.40
O25
15
013
Premolded expansion joint material (See detail 21/1.)1/2" X 12"
LF
$1.19
I00
$i19.00
O25
15
018
Add for combination sidewalk and curb, per LF of curb. See Detail 6/1.
LF
$3.98
35
$139.30
PremiumPrice
887
items Total
$39,932.63
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 14 of 25
UNITEDST'~ITE5 Indefinite POST,,'IL SERVICE.
C 3 "tact Number ;40-96-B-0094
Quantity Contract/Construction
Renewal Option Base Year Work Order Number 2.01
Manager BBUCE J ROTHERMEL
WorkDescription SITE
Facility LocaUon ST DAVID, IL - MAIN OFFICE Csntract Price
Div. iSec. I item
WorkDescripUon DEMOLETON
Units
Totals
0251
15 019
Concrete paving, 6" thick, including forms, concrete finishing, curing, and removing forms (Sawcutting costs to be used for contraction jointing.) See detail 12/I, 16/l, and 21/1. 0 150 SF
SF
$3.76
855
$3,214.8(
0251
15 028
Bulkhead curb, including forms, concrete, finishing, curing, and removing forms (See detail 4/i.)
LF
$7.74
238
$1,839.74
0331
00 014
Rod reinforcing
LB
$0.53
1200
$636.00
0331
00 017
Foundation walls, or piers, up to 8' high, and up to 12" thick, including forms on two sides, concrete form removal, curing, throseal finishing, but not including reinforcing
SF
$10.61
510
$5,4!1.10
0331
00 018
Elevated slab, such as ramp with piers, small project,including forms, concrete herdner, finishing, curing, and removing foznns, 0 - 50 SF
SF
$22.10
210
$4,641.00
0341
17 003
Precast concrete 13" X 8'0"
car barriers,
8" X
EA
$35.36
$28.96
8
28
$176.80
0341
17 013
Miscellaneous hourly labor, use only when work is not covered by line items of the particular trade for this and other related sections. Wages will be based upon prevailing wage rates for the county where the work is being performed. MASONS IN COOK COUNTY ARE COMPENSATED AT THE RATE OF $31.00Hr WITH A 20% MARK UP AN D AMULTIPLiER OF .91 T
$810.88
0551
00 021
Expansion anchors, KWIK Bolt, or similar, into con- crete or masonry,
EA
$2.21
-117
$-258.57
i/4. 2 x
0711 60 001
Cleaning and preparing damproofing
wall
for
SF
$0.22
-512
$-i12.64
i t ~
60 002
I
Bituminous asphalt coating for foundation, brushed on below ~rade,
SF
$0.97
-512
$-496.64 $39,932.63
* = Premtu~rlce~W coat, does not include excavation
888
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 15 of 25
POST/JL-~ERVlCE. ~UNITEDST/3TES Indefinite Quantit3, Contract/Construction
-act Number ;40-96-B-0094 WorkDescription MODULAR SITE Manager BRUCE J ROTBERMEL Renewal Op~on Work Order Number 2.01 11/20/1997
Facill~ Locatien ST DAVID, !L - RAIN OFFICE
List of Negotiated Items: $.00 Total of Negotiated tt~ms: Travel Expenses: Per Diem Amount Lodging Amount Other Expense Mileage Amount Travel Amount Subtotal: WorkOrder Total: $.00
$0.00
$.oo
$.00
$.oo
$39,932.63
889
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 16 of 25
TERM
'
OONSTRUCTION
CONTRACT
WOR.
K ORDE'~
PR~ECT ~UTttORZZATZOfl
~0.
~ANGE
CODE
FI~tAI,'{'.E t~O.
ACCOUNT .togo
I
'
':OlIT~CTOR
:, LP.Consultin~Group, ~040~S. ?St~Ave. PalosH~lls, iL 60465-20~5
I DATE
~~
SIGIIATURE
I
ITEIA HUMBER DESCRIPTION
O~ 15 oi5
t
~
00NTIITUED
:
~
TOTAl, NORK u*<~ ~n~u. s
890
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 17 of 25
CON-I:RACT
WOR.
K
ORDE[
SUBTOTA&
.
4~,;515,5S, i5o
891
~ ~TAL WORK ORDER A,,OUNT ~OTAL
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 18 of 25
I
I
SUBTOTAL II~ PAGE '11 6UBTOTALF~IOM PREVIOUSPAGE
~1C,1ES IIO;I.t'lC)ltKl|lG
IIOUI1 PRICE5
Case 1:98-cv-00868-FMA
~ UNITED ST/.~TES PO.~',~L SERVICE.
Document 98-9
Filed 04/06/2005
Page 19 of 25
Facility andFixed Mechanization Project Contract Payment Authorization
Date
42,'ilB
~ Contro~ Number
07/02/1997~ZZ76099 n~at(stioaName ST DAVID - MAIN OFFICE (166954-003) ST DAVID, IL 61563-9998 DescdptionofWo~ SITE ADAPT/PREP MODULAR Contract Number 162640-96-B-0094
(From Summary Lira 8)
Project Authorization Number ;-4J-166954-C-009 item Description ~Idg Cons tr
ChangeC~de
oo
PaymentAmount
B/A Finance Number 161550 Progress Payment
FMS Project Number J37301 Summary
(SBC
1. Initial Contract Amount 2, Approved Change Amount Total Contract Amount to Date(Lines 1 + 2) to Date
Amount Retainage of PayeeNameandAdd~ss: L P CONSULTING GROUP 10401 S 75TH A3FE PALOS Sub7oral INC Previous Payment Amount
HILLS IL 60465-2015
InvoioeDescription: PPA Applies to This Payment Contractor Cartificatl¢ [] Final Payment Architect-Engineer Representative
By
A-ERepresentative Title, Company, Address
I
I DateSigned
By ~-"-~~ title f ..... .~. ~
I DaW'~Si~(ned
Design/Construction
Management Representative ... .. Ibate Signed
Recor0mended For Payment
ROBERT A RIGSBY Approving ~dal ~tle, Addr~, an~e hu~ ~ 08) 56~ -7202 / CE~ ILLINOIS ~ / 6801 W 73~ ST / / BEDFO~ P~K IL 60499-9991 i / :~ /
(708)563-7243 Contact Person DE~IS E ~S~CHI CE~ ILLINOIS DISTRICT 6801 W 73~ ST D PK IL 60499-9991
PS Fo~ 42~B,OCtober ~995 - 20260~25, Rev
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 20 of 25
~
UNITED.$TZ~TE5 PO57",dL SERVICE.
Facility andFixedMechanization J Project Contract Payment Authorization |Date
4211B
~ Control Number
nstal~onName ST DAVID - MAIN OFFICE (166954-003) ST DAVID, IL 61563-9998 Descriptionof Work SITE ADAPT/PREP MODULAR
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 21 of 25
~ UN[TED ST/~TES POST/~L SERVICE.
Facility and Fixed Mechanization Project Contract PaymentAuthorization
4211B
Date ~ Control Number
InstallstionName ST DAVID - MAIN OFFICE (166954-003) ST DAVID, IL 61563-9998 Desc~plionofWork ~ITE ~EDAPT/PREP MODE~LR PtojectAutho~ationNumher 6-4J-166954-C-009 Item Description !&A Bldg Constr
16=640-96-B-0094
Index Number Code
i Ac=un, I I (~EC 1 ~c 1861=5 I,~.~ ~z oSo.
Payment Amoun[ IFrom Sumrnsq, 8) Lino
I 0'
116155°
1. Initial Contract Amount Approved Change Amount
I J3~301
ProgressPayment Summary
3. Total ContractAmount to Date(Lines1 + 2) 4. Value of WorkCompletod to Date
5. Amount Retainage of PayeeName anq~dress:~;< ~: L F CO~S~LTZ~G GRO~£ I~C 10401 S 75TH AVE pALOS HILLS ~voic~ Description: IL 60465-2015 Amount this payment of (Lines6 - 7) VDRCode: 6. SubTotal (Line4-5) 7. Previous Payment Amount
" ,h,s I'~/~/'~'~ Date App,,aa I InvoiceRf~ceived/Acceptance II []~,na, PDCUse Only: ~ P~A to Pay=nt P.yman, i -ContractorCedlficatlor~
/
Architact-Engineer Representative
By
I DateSigned ! A-ERepresentative Title, Company, Address
8~ "tile
I Dat
~ig
~''7'~I
;~/~ -I
I nesignlConstruclJ°nManagementRepreaegt~tIve ~ / /
~
I Re~ende Fgr Payment
IDa~em~nod ~ PreparedBy
I Date'Si~ed
C°ntraaing~rNam~i~t~i~
~pproving ~cial T~le, Addr~, an~PhoneNum~r~?08) 563-?~02 6801 W 73~ ST ~
Conta~ Pe~on CE~ ILLINOIS DISTRICT
895
~o~ ~ =~ ~o~-~z
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 22 of 25
UNITED ST,~TES POST,~L SERVICE°
Facility and Fixed Mechanization Project Contract PaymentAuthorization
Date ~ IControl Number
InstallationName ST DAVID - MAIN OFFICE (166954-003) ST DAVID, IL 61563-9998 DescdptionofWo~ SITE~t~APT/PREP MODULAR
Pr~ectAuthorizationNumber 6-4J-166954-C-009 Item Description ~&A Bldg Constr
I
Contract Number 162640-96-B- 0094 Account I index I
PaymentAmount
I 4/
ChangeCode
I
B/A Finance Number I FMS Project Number 161550 I J37301
I Number I Code I
tF,o"~S"mr"~'t~',
ProgressPz 'ment Summary
1. InitialContract 2. ApprovedChange Amount$ ~/1~ .. "~.~,._
86~=51 5,D
Amoun,
q5 2 "
3. Total ContractAmount to Date (Lines 1 * 2) 4. Valueof WorkCompleted to Date
Amount Retainage of PayeeNameandAddress: L P CONSULTING GROUP 10401 S 75TH AVE PALOS SubTotal (Line 4-5) 7. Previous Payment Amount 8. Amount this payment of nvoice Description: (Lines6 - 7)
INC
HILLS IL 60465-2015
$ ~ O00" oo
PDCUse Only: VDRCode: I invoice Re~-eived/Acc~J;~anceI Date ~] PPA I [~Final Payment App'ies t° This Payment ~'-- ,.__y -- (~ I ContractorCertification Architect-Engineer Representative
By
I DateSigned I A-ERepresentative Title, Company, Address
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 23 of 25
PAGE 85
~ UNITEDSTATES Indefinite POST~LS~RWCE.
Quantity ContracUConstruction
Base Year 1.00
. 08/26/1999
Work Description Project Authorization'Number I Project Number
L# COI, TSULTII~G GR~ INC SOUTh{ SUBU~Jq DZSTRZCT 6801 W 73PJ3 ST BEDFOP~ pA/%I( IL 60~99-9991
P~LOS
HILLS
IL 60465-2015
,,~one:. [,TOg) -2~3-288_3 .......... Fax~
$0,00 $Z7,5~2,27 ~I~,562.~7
897
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 24 of 25
DOWNERS GROVE LOBBY RENOVATION
898
Case 1:98-cv-00868-FMA
Document 98-9
Filed 04/06/2005
Page 25 of 25
~ UNITED ST/~TES
September 1996
Postmaster, DownersGrove, IL 60515-9998 Rich Battaglin, L P Consulting GroupInc.
SUBJECT:
Lobby Renovation Guidelines Contract # 162640-96-B-0098 Main Post Office, Downers Grove, IL 60515-9998
TheCentral Illinois District is taking steps to ensurethat weproject a professional and morebusinesslike corporate image. All lobby renovations will meetthe corporate imagefor retail lobby designs. All contractual orders are given by the Contracting Officer, Contracting Officers' Representative or project manager.Any changesor modifications madeduring construction need to be reviewed and accepted by the project managerto insure payment. Anychangesrequested by the postmasteror the contractor without authorization will not be acceptedas a Modification and will be charged as an unauthorized expenditure. Thecontractor will provide to the project manager fencedbar chart prior to construction. a This will eliminate any misunderstandings to the scope of work to be doneand as approximatecompletion date, Construction meetingswill be held every two (2) weeksfor construction updatesat the construction site. Four (4) weeks prior to completionof the project construction, meetingswill be held every week. Day of the weekand time to be set at the pre-construction meeting. Thankyou in advancefor your cooperation.
"
cc: Lois Gunlo~son
DELIVERING EXCELLENCE...EVERY OFTHEWA~! STEP
899