Facility and Fixed Mechanization Case 1:98-cv-00868-FMA Document 98-11 Filed 04/06/2005 Project Contract PaymentAuthorization
Inslallatiofl Name DO~rEP~ GROVE - ~2%IN OFFICE (162208-G01) DO~IF~S G~Ro~rE, IL 60515-9998 Descriptionof Work LOBBY RENOV,DOCK EiqCLOSED AND DOORS. Project Authocization Number 6-4J-162208-C-343 Item Description R&A Bldg Constr Ci>ntractNumber 162640-96-B-0098 Account Index ChangeCode ~ 7.-PaymentAmount

Page 1 of 24

42118
I Controt Number ;

I

B/A FinanceNumber 161550

FMS Project Number J30256

Progress PaymentSummary
Initial Co~tract Amount 2. Approved Change Amount 3. Total ContractAmount to Date (Uses + 2) 1 4. Valueof Work Completed to Date

(sBc 861255Bc/(~,~,.~-

,

"/~070-q~

,7"7~0"70.9l

,..~..,=,,.,o=,~ ,
5. Amount Ret~inage of Payee NameandAddress: !L P CONSULTING GRO~YP 10401 S 75TH AI/E iPALOS INC 6. Sub Total $

) 000 ' Do

(U~e*~)

* ~ 006
¯

7. Previous Payment

;
HILLS IL 60465-2015 , . ¯ 8. Amount this payment of (Lines - 7) 6 [] Finat Payment PDC Use Only:.. VDR Gedec~,-" _ Architect-Engineer Representative !invoice Description:

~e~ eceivedlA~.cept~Date nce ContractorCertification

By

DateSigned

A-ERepresentative "Frtle, Company, Address

Design/Construction Management Representative

ContractingOfficer Nar~;9ig}: atur

DateSigned

Prepared By ('7708) 563-?224

Approving Official T~[e, Address,andPhone Num~2P~ (708 563-'77202 C3~TRAL ILLINOIS ~/ 6801 W 73RD ST BEDFORD PARK IL 60499-9991

ContactPerson ~OBERT A RIGSBY CENTRAL ILLINOIS 6801 W 73RD ST BEJ~FORD PAIKK IL 60499-9991

PSFOlTn42118,October1995- 20260-6425, 8.00 Rev

950

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 2 of 24

DOWNERS GROVE SITE VISIT 12/26/97

VCT TILE WASLAYED THIS WEEKIN FULL SERVICEAREA. MEN WEREWORKINGON THE QUICKPOST AREA FRAMING.

951

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 3 of 24

Construction Setwices

FBE/WBE

7 Janua~ 1997 Ms. Lois Gunlogson Admin. Services 6801W. 73rd St. Bedford Park, It 60499-9991 Subject : DownersGroveP.O. Tile Warranty

DearLois : Weare submitting to you, regardingthe subject facility on the vinyl floor tile area, called the full servicearea. an additional one year warranty

This warrantyis limited to this floor area only, and doesnot include maintenance of anytype. This warrantyis governed its entirety by SectionC,Clause ; a,b,c, & d of in 7 the I.Q.C. Contract. Feel free to contact us at 708-599-9,~07 you haveany questions. if

cc: Bob Rigsby

// ::

952

Case 1:98-cv-00868-FMA Document 98-11 Filed 04/06/2005 Facility and Fixed Mechanization Project Contract PaymentAuthorization
D
Page 4 of 24

LOBBY RENOV,DOCK

ENCLOSED

6-4J-162208-C-343 Des~pio~

~162640-96-B-0098 ~ Num~r ~ ~ !

~

O5

|161550 Progress Pa~ent

~ J30256 Summa~

.,

'.;

~a~

~ a~

A~r~: A~ 60465-2015

i6. SubT~I
7. Pr~ Paint

10401 P~S

S 75~ BILLS IL

8.

C~tra~or CediSca~

~¢h~in~r

Repre~n~e

~ ~T

Off~ ~

Na~ ~GSB

S~n=u~

~

~

I Date S~ 708) 563-7224

6801 " ~3~ ST ~ P~ IL 60499-9991

~ I~OIS 6801 W 73~ ST ~ P~ IL 60499-9991

953

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 5 of 24

DOWNERS GROVE SITE VISIT 01/09/97

MET WITH ARCHITECT AND STRUCTURALENG REGARDINGTHE REMOVAL THE STEEL BEAM. THE ENG INDICATED THAT HE COULD OF HAVEIT REMOVED JAN. 22, 1997. BY THE CONTRACTOR MADE STATEMENTSREGARDINGTHAT IF HE WERE GIVEN OTHER WORKTO DO THAT HE WOULDNO LONGERPURSUE PAYMENTS AND INCREASES. HE ALSO INDICATED THAT ONE OF HIS WORKERS OUT OF WORKBECAUSETHE POST OFFICE HASN'T IS ISSUED ANY WORKORDERSFOR HIM. THE CONTRACTOR ALSO MADE STATEMENTSTO THE ARCHITECT THAT HE SHOULDHAVE KNOWNABOUT THE HIDDEN STRUCTURESAND THAT HE FAILED TO DO HIS JOB.

954

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 6 of 24

DOWNERS GROVE SITE VISIT 01/14/97 NO WDORKBEING PERFORMED ON SITE. CONTACTEDCONTRACTOR (BATAGLIN) REGARDING WORK STOPPAGE.HE INDICATED THAT HIS PEOPLE HAD NO WORKUNTIL THE STEEL STRUCTURE WAS MOVED. TAPING AND SANDING COULD HAVE BEEN PERFORMED ON WORKROOM FLOOR SIDE.

955

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 7 of 24

DOWNERS GROVE SITE VISIT 01/23/97 STEEL STRUCTURE RELOCATED.THIS HAS GIVEN THE CUSTOMER AN UNOBSTRUCTED OPENING TO ENTER THE SERVICE AREA. NO WORK WASPERFORMED BETWEEN JAN 13-17, 1997. THIS HAS REALLY DELAYEDOPENINGTHIS AREA TO THE CUSTOMERS. THE POST OFFICE HAS MDE ARRANGEMENTS CONTINUE TO SERVICE THROUGH TO THE OFFICE AREAlAND IN THE LOBBYUSING 3 WORK STATIONS. THE NEWAREA LOOKS NICE AND SHOULDELIMINATE CONGESTION AT THE WINDOWS THE OLD LOBBY DID. THE NEWEQUIPMENTSUCHAS AS IRT STATIONSAND NEWSCREEN LINE DWILL IMPOVETHEIR OPERATIONSGREATLY. WILL MEETWITH MIDWEST INTERIORS ON 1/24197 REGARDING THE CARPETINGFOR THE CUSTOMER LOBBY AREA.

956

Facility Document 98-11 Case 1:98-cv-00868-FMA and Fixed Mechanization 04/06/2005 Filed Project Contract Payment Authorization
In~¢~o~ Name D<~C~RS G~O~/E - MAIN OFFICE (162208-G01) DO%FI~EP~ G~0VE, IL 60515-9998

Page 8 of 24

42ttB

I-~- q 7

bOBBY

RENOV,DOCK

E~CLOSED

AND DOORS.

Number 6-4J-162208-C-343
Nem

I B/A F~nance Number 162640-96-B-0098

z6z550

I

FMS Proje~ Numbe~ J30256 Summary

I Acc°~ntIndexI I

Payment

Progress merit Pa

%&A Bldg

Constr

1o Date (Unes + 2) 1

~ayee NameandAddress: L P CONSULTING GROUP 10401 S 75TH A~E PA~OS HILLS INC 7. Prev~was Payment Amount Amou~ t~is payment of PDCUs~ On!y: VDR Code:

IL 60465-2015

FinalPayment

Architect-Engineer Repres~sntattve

By

I Date Signed

A-ERepres~ntatJve Company, TdJe, Address

957

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 9 of 24

DOWNERS GROVE SITE VISIT 01/29197 MET WITH A. FERNANDEZ ,ARCHITECT AND RICH BATTAGLIN CONTRACTOR GO OVER FINAL MODAND PUNCHLIST ITEMS. TO FIELD MEASURINGWAS CONDUCTED REGARDING STUDS AND CEILING. ALL AMOUNTS MEASURED WEREAGREEDUPON BY ALL PARTIES. THE STOREFRONT SCHEDULED BE PUT UP ON FEB 3, 1997 BY IS TO KANKAKEE GLASS AT 7AM. NOTIFIED POSTMASTER REGARDING THE GLASS SO SHE COULD NOTIFY FIRM CALLERS PICKING UP THEIR MAIL DURINGTHIS TIME. SHEWILL REROUTEHER CUSTOMERS THERE WILL BE NO INTERFERENCE. SO

958

/~,~

Case 1:98-cv-00868-FMA Document 98-11 Filed 04/06/2005 Page 10 of 24 4211B Facility and Fixed Mechanization UNITED STATE5 POSTAL SERVICE. Date Project Contract PaymentAuthorization I Control Number

Insta~lationName DOWNERS GRO'v-~ - IeLikIN DOWW~RSGRO'v~, Des~ptionofWo~ LOBBY RENOV, IL

OFFICE (162208-G01)

60515-9998 AND DOORS. ChangeCoda I B/A Finance Number I FMS Project Number

DOCK E~CLOSED

ProjectAuthorizationNumber -4J-162208-C-343 Item Description R~.A Bldg Conetr

I

Contra~ Number 162640-96-B-0098 PaymentAmount

o

1161550
Progress ~. InitiaIContrac~Amount 2. Approved Change Amount 3. Total Contract Amount to Date(Lines1 + 2) 4. Valueof WorkComplete¢ to Date

I ~~o2s6
$ "77/ 070 "'~::~ ~"

I Accoun~ I Index I Number I C°de (SBC 86125I 6BC I

Pa ment Summary

5. Amount Retainage of PayeeNameandAddress: LP CONSULTING GRP INC 10401 S 75TH A~E PALOS HILLS IL 60465-2015 6. SubTotal (Line4-5) 7. Previous Payment Amount 8. Amount this payment of InvoiceDescription: I lnvoi~ Received/Acceptance I"l.~-} Date pPAApplies to This PaymentI ~/~_O/~? I~ I Contractor DertJflc~tlon ~ Final Payment Architect-Engineer Representative (Lines - 7) 6 PDCUse Only: VDRCode:

By

I DateSigned I A-ERepresentative Title, Company, Address

F~le

~

/ O~r Na~ a~d~n~e, " ~ r /

De~%n~l~ctJon Management RepresentaUve Re~mmegded Payment ~r Date Signed

Contra~i~g

I

I DateS~gned / .

PreparedBy BET~ L Conta~ Pemon

~S

~proving

~cial

T~le, Add~, and ~hon~mber (70~) 563-7202

BEDFO~

P~

EL

60499-9991

6801

W 73~

ST~ET

959

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 11 of 24

ILLINOIS DISTRICT UNITED N'I"NTES .~ERVICE

October 7, 1998

]oyceBiakleyParalepl Specialist USPS-Civil PracticeSecfion-L~w Dept 475 L-Enfant Plaza SW WashingtonDC2.0260 RE: L.P. Consulting Grouplnc

DearI~. Blakley: This responds to the FOIA request £Tom Consulting Group, Inc. dated April 13, 1998. The charge LP. for this informationis $185.00,please collect in advance. NAME Be]wick Hoope~ton Downers Grove Brookfield Ramp AromaPark Beave.,"ville Bradley Ramp East Lynn Momence Ramp Papineau SL Anne UnionHill Sincerely, BIDS 43 2. 3 Nobids Nobids 4 I (unsolicitedbid) 3 No bids No bids No bids WRITTENNOTICE OF RECORD Yes Yes Yes Yes No award No award Yes No award Yes No award No award No award

960

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 12 of 24

Z

Z A.M. FERNANDEZ ASSOCIATES ,It ARCHITE(.TS - ENGINEERS B26 LINCOLN LANE LAGRANGE HIGHLANDS,tL 60525 708-579--519I

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 13 of 24

962

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 14 of 24

oo

963

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 15 of 24

Z

A.M. FERNANDEZ ASSOCIATES &: ARCHITECTS- ENGINEERS 826 LINCOLN LANE LAGRANGE HIGHLANDS, IL 60525 708-579-5191
PROJECT TITLE & NUMBER BEOOKFIELD U,S. SEAL

POST OFFICE

ARCHITECT-ENGINEER NAME

EST
........................................................

964

......

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 16 of 24

Y

BRO " i DRA~L~

ELD U,S, POST OFFICE No. i ~SION ~: '<

6801 WEST BEDFOI:~D PAEK

965

Feb-Zg-99

Case 1:98-cv-00868-FMA
05:49P JIM

~INO

Document 98-11

Filed 04/06/2005
414-~57-3389

Page 17 of 24
P. 02

UNITED"CT4TE$ ~/~POSTA

LSERVrE. Indefinite Quantity Con,tract/Construction
SAMUEL MQMENCE, Wo~Order Number 4.00 IL - MAIN OFFICE

Z~2640-gg-~-DO40 bobby Renova¢ion B-4J-365232-C-911 ~0~E~S CO INC ~802 19TH AVE

6801 ~ 73~ ST iBEDFOP, D PARK IL 60499~9991 ~ r~iwiz~ 31gn~t~m Dam

i~~.~,~o,.,l~J ." ) ,

;
Summary this Work of

<'ll

DW //¢~/n

~°~i'~=~'~:l\l~,U,-.~

Total ~eml Wo~T:~ for 4,00 Wo~E O~: H~o~: Sco~ of

966

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 18 of 24

~UNITEDST/ITE5 Indefinite POST/IL SERVICE.
Contract Number 162640-99-B-0040 WorkDescriplion Lobby Renovation

Quantity Contract/Construction
Renewal Option Base Year Work Order Number 4.00 Date

Manager SAMUEL W SOUTHERN

o2/o8/1999

i Facility Location MOMENCE, IL - MAIN OFFICE Contract Price Totals

Sac.

Item

WorkDescription MISC

Units

Qty.

000

03 AL8

Premium time at 20% of total dollar value for section of work requiring adjustment.

%

$0.1780

14983

$2,666.97

010

60 061

Scaffolding, exterior or interior above I0' height, for quantities up to 5000 SF

SF

$0.1335

5000

$667.50

010

60 062

Scaffolding, exterior or interior above I0' height, for quantities over 5000 SF

SF

$0.0890

7000

$623.00

010

60 081

Dust protection enclosure, studs and 4 mil plastic

using

SF

$0.7387

2706

$i,998.92

010

60 092

!Container

dumpster,

30 yard load

EA

$289.2500

3

$867.75

!WOOD & PLASTIC 061 00 077 Relocate letter drop. EA $27.7680 2

$55.5~
$2,026.49

061

00 080

iMiscellaneous hourly labor, use only iwhen work is not covered by line items of the particular trade for ithis and other related sections. iWages will be based upon prevailing iwage rates for the county where the work is being performed. Misc hourly labor for 3 men @ 60hrs and Misc hourly labor to trace and ilocate circuit

HR

$26.6644

76

062

00

002

'Demolitlon, including disposal, remove 4' X 8' panel- ing.

SF

$0.3649

340

$12~,07

062

00

076

Shelving bookcase, pine, clear 8" shelves, 12" O.C.

grade,

SF

$9.4340

36

$339.62

062

00

077

Lock box, laminate

mail drop unit

EA

$92.5600

1

$92.56

Premium Price IQCClTEM, October1995

967

ItemsTotal

$30,851.91

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 19 of 24

~UNITEDST/3TESIndefinite POST,O,L SERVICE.
Contract Number 162640-99-B-0040 Work Description Lobby Renovation SAMUEL

Quantity Contract/Construction
Renewal Option W SOUTHERN WorkOrder Number 4. O0 Date 02/08/1999

Facility Location MOMENCE, IL - MJ~_IN OFFICE Contract Price Totals

Sec.

WorkDescription WOOD & PLASTIC

Units

Qty.

062

O0 078

~ockbox, machines

laminate

panel

for vending

EA

$46.2800

~

$46.28

DOORS & WINDOWS 081 O0 001 Remove door, or, re-install door. EA $11.1072 11

081

O0 OO2

Remove frame,

or, re-install

frame. "

EA

$37.4868

1

$37.49

081

O0 122

16 gage, drywall, up to 3 7/8" deep, 7'0" high, 3'0" wide, single

EA

$97.9000

1

$97.90

081

O0 124

For welded frames,

add.

EA

$29.3700

11

$29.37

O82

11 O2O

Wicket type door, 3'0" X 7'0", 1-3/4", includes frame and hardware.

EA

$458.1720

I i

$458.17

084

I0 001

Anodized aluminum framing, cost per lineal foot of framing, plus all accessories, fasteners, and brackets

LF

$13.8840

3C

$416.52

O84

i0 OO2

1/4" tempered

glass clear

SF

$8.3304

36

$299.89

O84

i0 010

Remove aluminum and/or transom.

entry, sidelite,

SF

$4.6280

144

$666.43

O84

i0 012

Remove window framing.

glass,

storefront

SF

$0.9701

144i

$139.69

O87

O0 037

Hinges,

A8112 sizes, 4 1/2 X 4 1/2

PR

$37.0240

3

$111.07
$69.23

O87

O0 O98

Dead bolt lockset,

cylindrical

EA

$69.2331

1

O87

O0 ii0

Furnish and install heavy duty mortise entrance lockset with lever handle RUSSWIN # 74486-NEWPORT-26D

EA

$226.9500

1

$226.98

* = Premium Price IQCCITEM, October t995

ItemsTotal

$ 30,851.91

968

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 20 of 24

~UNITEDSTATE-~ Indefinite POST/IL SERVlCE.
Contract Number 162640-99-B-0040 WorkDescription Lobby Renovation

Quantity Contract/Construction
Renewal Option Ease Year WorkOrder Number 4.00 Date 02/08/1999

SAFEOEL W SOUTHERN

Facility Location MOMENCE, IL - MAIN OFFICE Contract Price Totals

Sec.

Item

WorkDescription FINISHES

Units

Qty,

091

11

011

Remove metal stud wall with drywall on two sides.

SF

$0.9256

37

$34.25

092

50

012

Add for 1/2" or 5/8" foil backed gypsum drFwall.

SF

$0.1068

804

$85.87

092

50

014

Drywall, corner or casing bead, galvanized, including applying compound

LF

$0.9701

551

$53~.53

092

50

023

Finishing metal stud partition, including 25 gauge by 3 5/8" metal studs and runner channels, 1/2" gypsum board, finished both sides, for walls up to 12' high

LF

$21.4757

71

$i,524.77

092

50

031

Wood framed partition, 2 X 6 studs, with gypsum board, both sides, taped, and spackled

SF

$3.0705

155

$475.93

O95

00 001

Remove acoustical system.

tile and suspension

SF

$0.2759

564

$155.61

O95

00

013

Ceiling system, mineral thick

tile, installed on suspension 12" X 12" or 12" X 24" fiber, plastic coated, 3/4"

SF

$1.6287

980

$1,596.13

O95

00 023

Suspension ceiling

systems,

concealed

spline

SF

$0.8722

380

$331.44

096

60

016

Vinyl compostion

tile

SF

$1.2015

968

$1,163.05

096

60

026

Vinyl base

LF

$1.5219

180

$273.94

096

60

027

Add for special

color, vinyl

base.

LF

$0.0890

180

$16.02

099

00

024

Painting

one coat on doors

and frames

SF

$0.5518 ItemsTotal

55

$30.35 $ 3 0,8 51.91

* = Premium Price

,QOC,TE~, October 1995

969

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 21 of 24

POST,~L Indefinite SE~WCE. ~UNITEDST~TES
Contract Number 162640-99-B-0040 WorkDescription Lobby Renovation I Manager I

Quantity

Contract/Construction
Renewal Option Base Year Work Order Number 4. O0 Date 02/08/1999

SAMUEL SOUTPYSP~N W

Facility Location MOMENCE, IL - MAIN OFFICE Contract Price

Item

WorkDescription FINISHES

Units

Qty.

Totals

099

00

O53

Painting drywall,

interior on plaster or brush work, prime + 2 coats

SF

$0.4450

528E

$2,353.16

099

00

058

Painting wood trim over 6" wide, clean + i coat enamel

SF

$0.8722

72

$62.80

POSTAL EQUIP 121 15 F01 Remove existing service counters & cabinets, store cabinets at post office, and remove other debris. LF $8.1435 3C $244.31

121

15 F03

Install service

postal furnished L shape counters, includes assembly

EA

$120.1500

21

$240.30

121

15 F06

Install postal furnished lobby tables, including assembly and ~tabilization Free standing MECF~A_NICAL table

EA

$40.0500

2

$80.i0

151

53

003

Miscellaneous hourly labor, use only when work is not covered by line items of the particular trade for this and other related sections. Wages will be based upon prevailing wage rates for the county where the work is being performed.

HR

$0.0000

8

$.00

157

58 530

Registers, air return, ceiling or wall, fixed 45" faceblades, 36" X 24"

EA

$99.7779

2

$199.56

157

61

814

Duct accessories, volume control, dampers 16" X 10"

EA

$30.5448

61

$183.27

158

9O

012

Remove high.

ductwork,

12" X 18", upto 18'

LF

$2.3140

20i

$46.28

159

i0

02N

Flexible includes

duct, and connections, labor

LF

$35.4042

20i

$708.08

* = Premium Price

Items Total

$ 30,851.91

,QCC,TEM, October 19~5

970

Case 1:98-cv-00868-FMA
POST,~L SERVICE. ~UNITEDST,~TE.-KIndefinite Contract Number 162640-99-B-0040 WorkDescdption Lobby Renovation

Document 98-11

Filed 04/06/2005

Page 22 of 24

Quantity Contract/Construction
Renewal Option Base Year Facility Location MOMENCE, IL - MAIN Work Order Number 4.00 OFFICE Contract Price Totals 02/0811999

Manager SAMUEL W SOUTHERN

Sec.

Item

WorkDescription

Units

Qty.

159

36 011

Ceiling damper,

diffusers, 15" neck

square,

includes

EA

$120.3280

2

$240.66

ELECTRIC~ 160 O0 004 Furnish and install 2-gang 4 I/2"x4 1/2" x 1 5/8" junction box, W/CVR, 3/4" KO and solid outlet box (concealed/exposed) F~ $20.3632 281 $570.17

160

O0 038

Furnish wire.

and install

three

#12 THW

LF

$0.5518

1642

$906.06

160

OC 041

Furnish

and install

3/4" EMT.

LF

$1.8512

642

$1,188.47

160

O~ 046

Remove plate,

wall switch, outlet, 15' wiring maximum.

device,

EA

$11.5700

4

$46.28

160

OC 047

Remove duplex receptacle, device, plate, 15' wiring

outlet, maximum.

EA

$11.5700

7

160

O0 O48

Remove 9" J-box, outlet, wiring maximum.

plate, 15'

EA

$11.5700

8

$92.56

160

O0 055

Remove recessed incandescent fixture. (fixture outlet, 15' wiring maximum)

EA

$23.1400

8

$185.12

160

O0 O57

Remove #I0, #12, and #14 wire.

LF

$0.0890

670

$8~.6~
$468.5S

160

O0 061

Remove 3/4" rigid conduit.

LF

$0.7209

650

160

O0 O86

Furnish and install 4-gang 4 1/2" x 4 1/2" x I 5/8" junction box, W/CV~, 3/4" KO and solid outlet box i(concealed/exposed)

EA

$38.7150

3

$I16.1E

160:

20

180

Conduit to 15' high, including all terminations, fittings, supports and

LF

$4.5835

282

$I,292.5E

¯ = Premi~nmeter l~i~q~ IQCCITEM, October 1995 971

ItemsTotal

$ 30,851.93

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 23 of 24

~UNITEDSTATE-~ Indefinite POST/3L SERVICE.
Contract Number 162640-99-B-0040 WorkDescription Lobby Renovation I Manager

Quantity Contract/Construction
Renewal Option Ease Year Work Order Number 4. O0 Date 02/08/1999

ISAMDEL W SOUTHERN

Facility Location MOMENCE, IL - MAIN OFFICE Contract Price Totals

Sec.

item

WorkDescription ELECTRICAL

Units

Qty.

160

20 5O2

Conduit to 15' high, including all terminations, fittings, supports and scaffolding, electric metallic tubing (EMT), 3/4" diameter

LF

$2.1093

i000

$2,109.30

160

8O 4OO

Telephone outlet, low tension, installed on existing U.F. duct

EA

$45.8172

3

$137.45

162

3O F01

Duplex receptacle in conduit system, outlet, plate, 15' wiring maximum (quantities I thru 9)

EA

$62.1042

7

$434.73

166

i0

030

Interior lighting, fluorescent, same as 16.6 I0 020, 2' X 2' lay in

EA

$85.1552

6

$510.93

* = Premium Price

ItemsTotal

$ 30,851.91

iQCCITEM, October 1995

972

Case 1:98-cv-00868-FMA

Document 98-11

Filed 04/06/2005

Page 24 of 24

~

UNITED 5T/3TES POST/3L SERVICE.

Indefinite Quantity Contract/Construction

Contract Number 162640-99-B-0040 WorkDescription Lobby Renovation

I

Manager SAMUEL W SOUTHERN

RenewalOption Base Year

Work OrderNumber 4.0o

Date 02/19/1999

FacilityLocation MOMENCE, IL - MAIN OFFICE

ListofNegotiatedltems: LN~G. Misc labor to engineer/layout duct changes @ prevailing wages 8hrs @ $35.00 pr NEO. ea ~T~G, Install potal furn screen line 5 @ $125

$280.00

$625.00

15/16 grid system 2x4 200 @ $4,98 sf

$996.00

NEG, 2x2 regular $2,29 sf

P~E/SL lay in ceiling 200 @

$584.00

NEG. Installed USPS furnished hrs @ $29.96 pr hr NEG. Building permit

slate

wall 32

$958.72

I @ $600 ea

$600.0O

Total of NegotiatedItems: Travel Expenses: Per Diem Amount Lodging Amount

$4,043,72

$.00

$.oo $.oo $.oo

Other Expense Mileage Amount Travel Amount Subtotal: WorkOrder Total:

$34,895,63

973