Free Motion for Summary Judgment - District Court of Federal Claims - federal


File Size: 229.7 kB
Pages: 2
Date: August 8, 2006
File Format: PDF
State: federal
Category: District
Author: unknown
Word Count: 312 Words, 2,115 Characters
Page Size: 612 x 789 pts
URL

https://www.findforms.com/pdf_files/cofc/19470/25-5.pdf

Download Motion for Summary Judgment - District Court of Federal Claims ( 229.7 kB)


Preview Motion for Summary Judgment - District Court of Federal Claims
Case 1:05-cv-00183-NBF

Document 25-5

Filed 08/10/2006

Page 1 of 2

ATTACHMENT 4

Case 1:05-cv-00183-NBF

Document 25-5

Filed 08/10/2006

Page 2 of 2

8

7
REDRAWN

NOTES: 1. APPLICABLE STANDARDS/SPECIFICATIONS; A. 000--STD-00100D(AR) B. ANSI Y14.5M-1982 ITEM IDENTIFICATION: APPLY THE FOLLOWING MARKINGS IN ACCORDANCE WITH MIL--STD-130, METHOD OPTIONAL. 19207-8676190 " MFR MANUFACTURER'S CAGE CODE 3. SUSPENSION HOUSING ASSEMBLY SHALL BE INSPECTED FOR COMPLETENESS OF ASSEMBLY.

CHANG (CER T8698)

ELECTRONICALLY MAINTAINED

0
e

4, DUALITY ASSURANCE PROVISIONS: PRODUCTION QUALITY CONTROL REQUIREMENTS ARE IDENTIFIED ON THIS DRAWING AS FOLLOWS: < CLASSIFICATION NUMBER 1 THRU 99 -- CRITICAL 101 THRU 199 -- MAJOR METHOD OF INSPECTION S -- SPECIAL INSPECTION EQUIPMENT COMMERCIAL INSPECTION EQUIPMENT C V -- VISUAL DUALITY CONFORMANCE INSPECTION SHALL CONSIST OF THOSE CHARACTERISTICS CLASSIFIED AS CRITICAL AND/OR MAJOR. MINIMUM ACCEPTABLE CONTROL METHODS ARE AS FOLLOWS: A. ONE HUNDRED PERCENT (100%) INSPECTION OF CRITICAL CHARACTERISTICS. B. STATISTICAL PROCESS CONTROL (SPC); CRITICAL CHARACTERISTICS SHALL MAINTAIN AN AVERAGE Cs INDEX EQUAL TO OR GREATER THAN 1.66 FOR VARIABLES OR A 100% PROCESS AVERAGE RATE OF ACCEPTANCE FOR ATTRIBUTES. MAJOR CHARACTERISTICS SHALL MAINTAIN AN AVERAGE Co INDEX EQUAL TO OR GREATER THAN 1.33 FOR VARIABLES OR A 99.994% PROCESS AVERAGE RATE OF ACCEPTANCE FOR ATTRIBUTES. C. FOR MAJOR CHARACTERISTICS, LOT SAMPLE PER ANSI/ASQC STANDARD Z1.4 OR AN INDUSTRY STANDARD PLAN WITH AN AQL NO GREATER THAN 1.0 MAY BE USED IN LIEU OF SPC. ALTERNATE CONTROL METHODS SHALL BE SUBMITTED TO THE GOVERNMENT PROCURING ACTIVITY FOR APPROVAL. THE CONTROL METHOD SELECTED FOR ALL REMAINING CHARACTERISTICS SHALL BE AT THE CONTRACTOR'S DISCRETION. REGARDLESS OF THE CONTROL METHOD USED, CONTROL SHALL BE ADEQUATE TO MAINTAIN CONFORMANCE TO DRAWING REQUIREMENTS.

2- PIN- 8364404 HOUSING-8676189

.75

3-FITTING-M S15003-4
±

PART NO. 8676190
CONTRACT
OTHERWISE

ARE CONTRACTOR /C.or-wAL....-rq r PM

ranum Ok RICE a RACE

kle.AltA2
.876192 4 aam

HOUSING ASSEMBLY SUSPENSION 8676190

V