Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 1 of 54

EXHIBIT B

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 2 of 54

CALIFORNIA ENERGY COMMISSION

SAN FRANCISCO ELECTRIC RELIABILITY PROJECT
Application For Certification (04-AFC-1) The City and County of San Francisco

U'

S

2

`S

C `a

S

=

UI

0 `a
2 a
pp

C

OCTOBER 2006 (04-AR-i) CK-800-2006-007-CMF

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 3 of 54

(&UFORNIA NIRGT

SAN FRANCISCo ELECTRIC RELIABILITY PROJECT
9&ofla Fa (dflcolim. (04-MCI)
11. at, ond (wily of Son Frontha

a a
U.
is

C

a a

I
`--a aan

CALIFORNIA ENERGY COMMISSION
1516 9th Street Sacramento, CA 95814

hrtp//www encrgtca.goi'/siti,zgcases/sanfranctcco/index. html

JAMES D. BOYD Presiding Committee Member JOHN L GEESMAN Associate Committee Member STANLEY VALKOSKY Chief Hearing Adviser GARY FAY Hearing Officer COMMISSIONERSJACKALYNE PFANNENSTIEL Chair JAMES D. BOYD 14cc Chair ARTHUR H. ROSENFELD. Ph. D. Commissioner
JOHN L. GEESMAN Commissioner

JEFFREY F). BYRON Commissioner

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 4 of 54

ORDER NO. 06-100341

BEFORE THE ENERGY RESOURCES CONSERVATION AND DEVE LOPMENT COMMISsION OF THE STATE OF CALIFORNIA

IN THE MATTER OF: APPLICATION FOR CERTIFICATION

FOR THE SAN FRANCISCO ELECTRIC REUABILITV PROJECT

DOCKET No. 04-AFC-1

COMMISSION ADOPTION ORDER This Commission Order adopts the Commission Decision on the SAN FRANCISCO ELECTRIC RaMBIurf PROJECT. The Commission Decision is based upon the evidentiary record of these proceedings (Docket No. 04-AFC-1) and considers the comments received at the October 3, 2006, special busine ss meeting. The text of the attached Commission Decision contains a summary of the proceedings, the evidence presented, and the rationale for the findings reached and Conditions imposed. This ORDER adopts by reference the text, Conditions of Certification, Compliance Verifications, and Appendices contained in the Commission Decision. It also adopts specific requirements contained in the Commission Decision which ensure that the proposed facility will be designed, sited, and operated in a manner to protect environmental quality, to assure public health and safety, and to operate in a safe and reliable manner. FINDINGS The Commission hereby adopts the following findings in addition to those contained in the accompanying text:
1.

will provide a degree of economic benefits and electricity reliability to the local area. The Conditions of Certification contained in the accompanyin g text, if implemented by the project owner, ensure that the project will be designed, sited, and operated in conformity with applicable local, regional, state, and federal laws, ordinances, regulations, and standards, including applicable public health and safety standards, and air and water quality standards.

The SAN FRANCISCO ELECTRIC RELIABILITY PROJECT,

2.

Page 1 of 4

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 5 of 54

ORDER NO. 06-1003-01

3.

Implementation of the Conditions of Certification contained in the accompanying text will ensure protection of environmental quality and The assure reasonably safe and reliable operation of the facility. Conditions of Certification also assure that the project will neither result in, nor contribute substantially to, any significant direct, indirect, or cumulative adverse environmental impacts. Existing governmental land use restrictions are sufficient to adequately control population density in the area surrounding the facility and may be reasonably expected to ensure public health and safety. The project is subject to Fish and Game Code section 711.4 and the project owner must therefore pay an eight hundred fifty dollar ($850) fee to the California Department of Fish and Game. Construction and operation of the project, as mitigated, will not create any significant adverse environmental impacts. Therefore, the evidence of record also establishes that no feasible alternatives to the project, as described during these proceedings, exist which would reduce or eliminate any significant environmental impacts of the mitigated project. The evidence of record does not establish the existence of any environmentally superior alternative site. The evidence of record establishes that an environmental justice screening analysis was conducted and that the project, as mitigated, will not have a disproportionate impact on low-income or minority populations. The Decision contains a discussion of the public benefits of the project as required by Public Resources Code section 25523(h). The Decision contains measures to ensure that the planned, temporary, or unexpected closure of the project will occur in conformance with applicable laws, ordinances, regulations, and standards. The proceedings leading to this Decision have been conducted in conformity with the applicable provisions of Commission regulations governing the consideration of an Application for Certification and thereby meet the requirements of Public Resources Code sections 21000 et seq. and 25500 et seq.

4.

5.

6.

7. 8.

9. 10.

11.

Page 2 of 4

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 6 of 54

ORDER NO. 06-1003-01

ORDER

Therefore, the Commission ORDERS the following: 1. The Application for Certification of the SAN Fa4NcIsco ELECTRIC RELIABILITY PROJECT as described in this Decision is hereby approved and a certificate to construct and operate the project is hereby granted. The approval of the Application for Certification is subject to the timely performance of the Conditions of Certification and Compliance Verifications enumerated in the accompanying text and Appen dices. The Conditions and Compliance Verifications are integrated with this Decision and are not severable therefrom. While the project owner may delegate the performance of a Condition or Verification, the duty to ensure adequate performance of a Condition or Verification may not be delegated.

2.

3. 4. 5. 6.

This Decision is adopted, issued, effective, and final on October 3, 2006. Reconsideration of this Decision is governed by Public Resources Code, section 25530. Judicial review of this Decision is governed by Public Resources Code, section 25531. The Commission hereby adopts the Conditions of Certification, Compliance Verifications, and associated dispute resolution procedures as part of this Decision in order to implement the compliance monitoring progra m required by Public Resources Code section 25532. All conditions in this Decisi on take effect immediately upon adoption and apply to all construction and site preparation activities including, but not limited to, ground disturb ance, site preparation, and permanent structure construction. The project owner shall provide the Executive Director a check in the amount of eight hundred fifty dollars ($850), payable to the California Department of Fish and Game.

7.

Page 3 of 4

__

__

__

_

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 7 of 54

ORDER NO. 06-1 003.01

8.

of this The Executive Director of the Commission shall transmit a copy ing the Decision and appropriate accompanying documents, includ Code Department of Fish and Game fee, as provided by Public Resources title 20, section 1768, and section 25537, California Code of Regulations, Fish and Game Code section 711.4.

Dated October 3, 2006, at Sacramento, California.

JACK4YNE PFANN NSTIEL ChaWrYcan

JAME$D. BOYD V,.thair

4
JO4N L. frE ComNsjoner AN ARTHUR H. ROSENFELD Commissioner

JEFF EY 0. BYRON Commissioner

Page 4 of 4

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 8 of 54

V.

PUBLIC HEALTH AND SAFETY ASSESSMENT

Operation of the SFERP will create combustion products and utilize certain hazardous materials that could potentially cause adverse health effects to the general public and to the workers at the facility. The following sections describe the regulatory programs, standards, protocols, and analyses that address these issues. A. AIR QUALITY

This section examines the potential adverse impacts of criteria air pollutant emissions resulting from project construction and operation. In consul tation with the local air pollution control district, the Commission determines whethe r the project will likely conform with applicable LORS, whether it will likely result in significant air quality impacts, including violations of ambient air quality standards, and whether the project's proposed mitigation measures will likely reduce potential impacts to insignificant levels. Applicant and Staff reached agreement on all relevant issues, includ ing the Conditions of Certification following this narrative. (Exs. 46, 48.) Intervenor CARE also stipulated to the analysis of these matters contained in Staffs testimony but then notified the Committee in its September 20, 2006 comments on the PMPD (page 13) that it no longer agreed with Staff. (5/22/06 RT 304-30 5: 3-4.) Intervenor Sarvey, however, attempted to persuade the Committee that the analysis of record was flawed on a number of grounds, including an inadequate cumulative impacts analysis and ineffective mitigation measures. (Sarvey Opening Brief, pp. 2-7; Reply Brief, pp. 1-10, 25-28; July 21, 2006 Reply Brief to Staff Late Filing, pp. 5-16.) Our examination of the record leads us to the conclusion that intervenor Sarvey's contentions are unsupported by the evidence. Applicant (Opening Brief, pp. 30102

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 9 of 54

52; Reply Brief, pp. 5-25) and Staff (Opening Brief, pp. 3-15; Reply Brief, pp. 1-5) each thoroughly discount this intervenor's assertions. We have therefore included only the most salient points of the relevant discussion in the next section.

SUMMARY AND DISCUSSION OF THE EVIDENCE

The Federal Clean Air Act and the California Clean Air Act both require the establishment of standards for ambient concentrations of air pollutants, called ambient air quality standards (AAQS). The state AAQS, established by the California Air Resources Board (CARB), are typically lower (more protective) than the federal AAQS which are established by the U.S. EPA. The state and federal air quality standards are listed in AIR QUALITY Table 1. AIR QUALITY Table I Ambient Air Quality Standards
California Standards Federal Standards Primary ) 3 Ozcne(0 Particulate Matter ) 10 (PM 8-how Ann.Geo. Mean 24-hour Ann.Arit. Mean FIne Particulate Matter (PM2.5) carbon Monoxide (CO) Nitrogen 24-hour Ann.Mt Mean 1-hour 8-hour 1-hour Ann.MtMean
0.07 ppm

Pollutant

Averaging Time

Secondary Same aspdmary Same as primary

o.oe ppm
--

20 ig/m 3 50 jig/rn 3
--

150 jig/rn 3
3 50 jig/rn

No separate 12 iaJm3 20 ppm (23 mg/ms) 9 ppm (10 rng/rn ) 3 0.25 ppm

65 g& 15 ig/m 3 35 ppm (40 mg/m ) 3 9 ppm (10 mglrn ) 3
--

Same as pnmasy Same as primary None

Dioxide ) 2 (NO

Same as primary

(470 j4m)
--

3

0.053 ppm (100 jag/rn ) 3

103

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 10 of 54

Lead(Pb)

30-day Cal. Quarter

1.5 gIm 3
--

--

Same as primary

1.5 ig/m 3
0.03 ppm
--

Sulks Dioxide ) 2 (SO

MnAuit Mean 24-hour 3-hour
1-how

--

0.04 ppm ) 3 (105 tg/m
--

) 3 (80 pglm 0i47 ppm
) 3 (366 sgIrn
--

--

O5ppm
(1300

0.25 ppm ) 3 (655 ig/m 25 tgIm 3

--

--

Sulfates
S 2 H

24-hour
1-hour

No federal standard

) 3 0.03 ppm (42 gglm No federal standard

Source: Exhibit 48. p. 4.1-7.

In general, an area is designated as attainment if the concentration of a particular air contaminant does not exceed the standard. Likewise, an area is designated as non-attainment for an air contaminant if that contaminant standard is violated. Where not enough ambient data are available to support designation as either attainment or non-attainment, the area can be designated as unclassified. An area could be attainment for one air contaminant while non-attainment for another, or attainment for the federal standard and non-attainment for the state standard for the same air contaminant. Currently, the Bay Area Air Quality Management District (BAAQMD or District) and the CARB measure ambient air quality concentrations for NOR, VOC, CC, . 2 , , 10 25 PM PM and SO These measurements are taken at the Arkansas Street 19 monitoring station, located about one-half mile northwest of the SFERP site. Although Intervenor Sarvey contends that use of this monitoring site is inappropriate (Opening Brief, pp. 4-5.), expert testimony establishes that there are no meaningful differences in pollutant levels if measured at different locations

S) 2 Lead, sulfates and hydrogen sulfide (H are not measured at this monitoring station because the responsible regulatory agencies believe that the area is attainment for these air contaminants.

19

104

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 11 of 54

in the project vicinity. (5/22/06 RT 233, 260-61; Ex. 46, pp. 4.1-8 to 4.1-9; see also, Applicant Reply Brief, pp. 5-7; Staff Opening Brief, p. 8.) The BAAQMD is classified as "attainment" for the state NO standard, the state 2 one and eight hour CO standards, and the federal annual and 24-hour PM 25 standards. (Ex 46, pp. 4.1-10 to 4.1-12.) The District is classified as a "non attainment" for the state 1-hour ozone standard and the state 24-hour PM 10 ° 2 standard. (Ex. 46, pp. 4.1-10, 4.1-12.) The BAAQMD meets applicable standards for all other criteria pollutants: hence, its efforts are focused on meeting the ozone and the PM standards. (Staff Opening Brief, pp. 3-4.) The SFERP will emit NON, VOC (volatile organic compounds), SO,, CO, and . 10 PM Construction and operation of the SFERP will result in 15.2 tpy of PM emissions which will contribute to the existing violation of applicable state standards. (Ex. 46, p. 4.1-17.) Project construction will also result in short temi CO and PM emissions, chiefly from grading and operation of diesel equipment. (Ex. 46, pp. 4.1-17 to 4.1-18.) Thus the SFERP could contribute to existing violations of the state ozone and PM standards. (Ex. 46, p. 4. 1-20; Applicant Opening Brief, p. 35.) There is no dispute that the project will use the Best Available Control Technology (BACT). Each combustion turbine will limit the NOx emissions to 2.5 15 percent 02 through the use of water injection and selective catalytic reduction (SCR); a catalyst system on each turbine will maintain CO emissions at ppm

@

no more than 4 ppm. (Ex. 48, Table 3.) Precursor organic compounds will be limited to 2.0 ppmvd (averaged over three hours), and SO and PM emissions will be controlled through use of natural gas 2 10

Although CARB has recently adopted an annual PM standard of 12 gg/mrn it has not 25 3 determined the attainment status of any district. Adoption of a new 24-hour PM standard has 25 been deferred. (Ex. 46, p.4.1-i2.)
,

20

105

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 12 of 54

as a fuel. (Ex. 55, P. 8.1-50.) Ammonia emissions from the exhaust stack ("ammonia slip") are limited to no more than 10 ppm, a level which the record establishes both meets District requirements and is the lowest feasible rate for a peaking facility such as the SFERP. (Ex. 46, p. 4.1-49; Ex. 55, p. 24; see Applicant Opening Briet pp. 46-49; Staff Opening Brief, p. 12-- 13.) The SFERP will be limited during operation to emissions of 39.8 tons of NOR, 27.9 tons of GO, 7.7 tons of P0G.
21

2 , 10 15.2 tons of PM and 2.7 tons of SO

annually. (Ex. 46, p. 4.1-16; Ex. 48 Table 3; Condition of Certification AQ 21.) Furthermore, the project will mitigate emissions of the ozone precursors (NOr and

POCNOC) by using 47.5 tons of N0 emission reduction credits from the nearby
Potrero power plant site. (5/22/06 RT 221; Ex. 46, p. 4.1-20.) Intervenor Sarvey apparently disagrees with the propriety of using these credits. (Ex. 74; see also Reply Brief, pp. 6-7.) As explained by both Applicant and Staff, however, use of ERCs in the present instance is proper and wholly consistent with federal and state plans for mitigating air emissions. (5/22/06 RT 226-27; Applicant Opening Brief, pp. 38-41; Staff Opening Brief, pp. 8-10.) CO emissions (for which the District is in attainment) will be adequately controlled by the use of BACT, and 2 the project's level of SO emissions. 2.7 tons per year is well below the level . 22 (100 tons per year) which would require offsets under District rules (Ex. 46. p. 4.1-10; Staff Opening Brief, pp. 10-11.) These mailers are confirmed by the B4AQMD's revised Final Determination of Compliance. (Ex. 55; see also Applicant Opening Briet pp. 30-32; Staff Opening Brief, pp. 3-5.)

21

POC (precursor organic compounds) and VOC (volatile organic compounds) are equivalent. Intervenor Sarvey continues to contend that SO emissions remain unmitigated. (Reply Brief, pp. 6, 8; July21, 2006 Reply Brief to Staff Late Filing, p. 10.) The street sweeping program will 10 produce an excess of 9 tons per year of PM reduction. This more than offsets the 2.7 tons of SQ emissions, at a 3:1 ratio. (5/31/06 RT 28.) In any event, SO,, emissions do not interfere with the attainment or maintenance of applicable ambient air quality standards.

22

106

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 13 of 54

BACT dictates that the turbines emission level for PM will be restricted to no 10 more than 2.5 lbs/hour. (Ex. 48; see also 5/22/06 RT 228-29.) In addition, and to address PM and PM emissions from operation, Applicant will provide 23.6 tpy 10 5 . 2 of PM offsets. 10 These will be realized from an enhanced street sweeping program designed to remove dust from the street, at about a 1.5:1 ratio when compared to project emissions, and thus reduce overall PM levels in the project vicinity. (5/22/06 RT 223-24; Ex. 48; Applicant Opening Brief, p. 37.) In response to community concerns, Applicant will also institute an extensive tree planting program and an indoor program focusing on improving air quality in area residences, especially those of asthmatics. (5/21/06 RT 224.) Applicant will further mitigate PM emissions by implementing a program to 5 . 2 subsidize area homeowners in replacing wood stoves/fireplaces with natural gas or propane fueled units. (Ex. 46, p. 4.1-21; Condition of Certification AQ-SC1 1.) 23 In case this replacement program is not implemented, Applicant is obligated to provide 36 tpy of SO offsets to mitigate (at a 3:1 ratio) the PM emissions. 5 . 2 (5/22/06 RT 225-26; Ex. 48; Staff Opening Brief, pp. 10 4; Condition of Certification AQ-SCI2.)
--

11; Staff Reply Brief, p.

Intervenor Sarvey asserts that the street sweeping PM mitigation agreed to by Applicant and Staff is inadequate since it rains in the vicinity during the winter months (when most violations of applicable standards occur), and that the use of regional SO, offsets does not mitigate local air quality impacts. (Opening Brief, pp. 5-6; Reply Brief, pp. 7-8, 25; July 21, 2006 Reply Brief to Staff Late Filing, p. 11.) The record shows, however, that the methodology used to calculate the PM emission factors takes into account the frequency of rain. (Ex. 38; see Applicant Reply Brief, pp. 7-9.) Moreover direct expert testimony contradicts the 1
23

Wood smoke is a major contributor to PM standard violations, especially during the winter. 10 (Ex. 46, p.4.1-12.)

107

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 14 of 54

intervenor's assertions regarding the effectiveness of the street sweeping mitigation (5122106 RT 252) and the intervenor introduced no credible testimony to the contrary. lntervenor's second point necessarily local
-- --

that the SO, offsets are not

simply disregards and implicitJy disputes the accepted

regional emphasis of state and federal air quality regulation strategies. In sum, the evidence clearly establishes that the SFERP will meet the provisions of all applicable air quality laws, and will not cause any new violations of state or federal standards, even when modeled with worst case ambient concentrations. (Ex. 46, p. 4.1-19.) Thus, there are no direct adverse air quality impacts attributable to the project. The evidence also establishes that a menu of mitigation measures, including the use of ultra-low sulfur diesel fuel, low emission diesel engines, soot filters, and site fencing will apply in controlling the short-term PM impacts resulting from project construction. (Ex. 46, pp. 4.1-17 to 4.1-19; see Conditions of Certification AQ-SCI to AQ-SC5.) Finally, the record clearly establishes that Applicant and Staff addressed the issue of cumulative impacts by performing multiple analyses of the SFERP's impacts in combination with those of other projects. conducted (Ex. 15; Opening Brief, pp. 34-36): · A dispersion modeling analysis of worst-case project impacts added to worst-case measured ambient concentrations. A dispersion modeling analysis of the worst-case combined impacts of the project in combination with existing nearby power plants and reasonably foreseeable projects, added to worst-case measured ambient concentrations. A comparison of project emissions of the same pollutants from other, existing sources. For example, Applicant

·

·

108

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 15 of 54

Staff did an independent two-part cumulative impact analysis, including both the "list" and "summary of projections" approaches mentioned in section 15130 of the CEQA Guidelines. (Ex. 46, PP. 4.1-21 to 4.1-30; Opening Brief, pp. 14--15.) The evidence shows that no mailer which analysis one chooses, the conclusion is the same: with implementation of mitigation required air quality impact. Intervenor Sarvey, however, contends that the cumulative impact analyses are insufficient chiefly because, in his view, they fail to include all reasonably foreseeable projects. More specifically, the intervenor believes the analysis of record must, but did not, include projects identified in the Southern Waterfront Supplemental Environmental Impact Report (SEIR) as well as the Illinois Street 24 Bridge project. (Opening Brief, pp. 3-4, 13; Reply Brief, pp. 2-5; July 21, 2006 Reply Brief to Staff Late Filing, pp. 5-10.) It is unclear to us in what respects the cumulative analysis of record is arguably deficient. As Applicant points out, each project identified in the SEIR must necessarily fall into one of the following categories (Opening Brief, p. 44.): · The project has been built, and its impacts are thus included in one of the cumulative air quality impact analyses prepared by the city because its emissions are reflected in the background data used by the City, and included in the baseline analysis. (Ex. 15, p. 8.1-44.) The project has not been built, but has an application pending before the BAAQMD, and the project was identified by the BAAQMD and explicitly analyzed in one of the cumulative impact analyses prepared by the City, and also included in the baseline analysis. (Ex. 15, vol. 2, Appendix 8.1F, pp. F-2 to F-8.) in the Conditions of Certification, the SFERP will not cause, or contribute to, an adverse cumulative

·

24

The intervenor referenced this five year old document numerous times but, despite several requests, failed to provide a readable copy. Moreover, it is not part of the evidentiary record of the case, but was assigned Exhibit 92B" for identification purposes only. (5/31/06 RI 44-45.)

109

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 16 of 54

·

The project has not been built, has an application pending before the BAAMMD, but was not included in the cumulative impacts analysis because its emissions were below the de minimis levels identified in the City's cumulative impacts protocol. The project has not been built, and has not yet submitted an application to the BAAQMD, and therefore is no longer reasonably foreseeable.

·

Staff elaborates upon these points, confirming that projects identified in the SEIR which have been built are part of the existing ambient background and thus used in preparation of the cumulative analyses of record. (5/31/06 RT 230, 285, 287.) Moreover, some projects (e.g., the Illinois Bridge and MUNI projects) will result only in temporary construction emissions, some of which may have already occurred. (Reply BrieL p. 2.) After considering these matters, we are satisfied that the cumulative impact analyses of record are more than sufficient to satisfy the requirements of CEQA. The impacts of the SFERP have been considered in conjunction with those actual and reasonably foreseeable projects. The SFERP's contribution to adverse impacts is less than cumulatively considerable and therefore less than significant since the Conditions of Certification require Applicant to implement appropriate measures to proportionately alleviate the project's contribution to any cumulative impact. [14 Cal. Code of Regs., §15130(a).] In addition, the persuasive (and uncontradicted) evidence of record establishes that nothing in the SEIR would change the ultimate conclusions by Applicant's and Staff's expert witnesses that, as mitigated, the SFERP will not directly cause and will not contribute to significant adverse cumulative impacts. (5/31/06 RT 32-35; Ex. 46, p. 4.1-28; Applicant Reply Brief, pp. 25--26; Staff Reply Brief p. 3.)

110

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 17 of 54

FINDINGS AND CONCLUSIONS Based on the persuasive weight of the evidence of record, we find as follows: 1. The proposed SFERP is located within the jurisdiction of the Bay Area Air Quality Management District. 2. The District is classified as non-attainment for the state 1-hour ozone, and the state 24-hour and annual PM standards. The District meets applicable , 10 standards for all other criteria pollutants. 3. The project will employ the best available technology (BACT) to control emissions of criteria pollutants. 4. Project emissions will be fully offset. 5. Use of emission reduction credits in this case is appropriate, and is consistent with applicable federal and state emission control strategies. 6. The project will not cause new violations of any NO SO or CO ambient air , , 2 2 quality standards. Therefore, its NON, SO,, and CO emission impacts are not significant. 7. The project's NQ and VOC emissions can contribute to the existing violations of the ozone standards. However, the required mitigation (in the form of emission reduction credits) will mitigate the project's impact to a level that is less than significant. 8. The project's PM emissions can contribute to the existing violations of the 10 state 24-hour PM air quality standard. However, the required mitigation (in 10 the form of an enhanced street sweeping program) will mitigate the project's impacts to a level that is less than significant. 9. The project's fine particulate matter emission contribution will be mitigated to a level of less than significant by the implementation of the local street sweeping and the woodstove/fireplace replacement or modification programs, or by the surrender of sulfur oxide emission reduction credits. 10. The District issued a Final Determination of Compliance that finds the SFERP will comply with all applicable District rules for project operation. 11. The evidence establishes that an ammonia slip level of 10 ppm is appropriate for this peaking project.

111

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 18 of 54

12. The evidence of record does not persuasively establish that an ammonia slip level of 10 ppm will lead to the formation of secondary particulates in the area of this project, or result in significant adverse impacts. 13. The evidence of record does not establish that a reduction in the level of ammonia slip to 5 ppm from 10 ppm will lead to a reduction or elimination of a significant environmental impact.

14. The project's construction-related impacts are temporary and short-term in nature. They are mitigated to below a level of significance by measures identified in the Conditions of Certification. 15. Data gathered from the Arkansas Street monitoring station is appropriate to use in modeling air quality impacts in this case.

16. The record contains an adequate analysis of the project's contributions to cumulative air quality impacts. 17. Projects, which have been constructed, undergoing construction, or otherwise reasonably foreseeable and were identified in the Southern Waterfront SEIR have been considered in the cumulative impact analyses of record. Impacts arguably attributable to such projects do not alter conclusions reached concerning the SFERP's contribution to cumulative air quality impacts.

18. The project's offset package complies with Public Resources Code, section 25523 (d)(2). 19. Implementation of the Conditions of Certification listed below ensures that the SFERP will not result in any significant direct, indirect, or cumulative adverse impacts to air quality.

The Commission therefore concludes that the mitigation measures imposed are sufficient to ensure that the SFERP will conform with all applicable laws, ordinances, regulations, and standards relating to air quality as set forth in the pertinent portion of Appendix A of this Decision. CONDITIONS OF CERTIFICATION AQ-SCI Air Quality Construction MitiQation Manager (AQCMM): The project owner shall designate and retain an on-site AQCMM who shall be responsible for directing and documenting compliance with conditions AQ-SC3, AQ-SC4 and AQ-SC5 for the entire project site and linear 112

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 19 of 54

facility construction. The on-site AQCMM may delegate responsibilities to one or more AQCMM Delegates. The AQCMM and AQCMM Delegates shall have full access to all areas of construction on the project site and linear facilities, and shall have the authority to stop any or ad construction activities as warranted by applicable construction mitigation conditions. The AQCMM and AQCMM Delegates may have other responsibilities in addition to those described in this condition. The AQCMM shall not be terminated without written consent of the CPM. Verification: At least 60 days prior to the start of ground disturbance, the project owner shall submit to the CPM for approval the name, resume, qualifications, and contact information for the on-site AQCMM and all AQCMM Delegates. The AQCMM and all Delegates must be approved by the CPM before the start of ground disturbance. Air Quality Construction Mitigation Plan (AQCMP): The project owner shall provide an AQCMP, for approval, which details the steps that will be taken and the reporting requirements necessary to ensure compliance with conditions AQ-SC3, AQ-SC4 and AQ-SC5. Verification: At least 60 days prior to the start of any ground disturbance, the project owner shall submit the AQCMP to the CPM for approval. The CPM will notify the project owner of any necessary modifications to the plan within 30 days from the date of receipt. AQ-SC2 AQ-SC3 Construction Fugitive Dust Control: The AQCMM shall submit documentation to the CPM in each Monthly Compliance Report (MCR) that demonstrates compliance with the following mitigation measures for the purposes of preventing all fugitive dust plumes from leaving the project. Any deviation from the following mitigation measures shall require prior CPM notification and approval. a) All unpaved roads and disturbed areas in the project and linear construction sites shall be watered as frequently as necessary to comply with the dust mitigation objectives of AQ-SC4. The frequency of watering can be reduced or eliminated during periods of precipitation. b) No vehicle shall exceed 15 miles per hour within the construction site. c) The construction site entrances shall be posted with visible speed limit signs. d) All construction equipment vehicle tires shall be inspected and washed as necessary to be cleaned free of dirt prior to entering paved roadways. e) Gravel ramps of at least 20 feet in length must be provided at the tire washing/cleaning station. 113

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 20 of 54

f) All unpaved exits from the construction site shall be graveled or treated to prevent track-out to public roadways. g) All construction vehicles shall enter the construction site through the treated entrance roadways, unless an alternative route has been submitted to and approved by the CPM. h) Construction areas adjacent to any paved roadway shall be provided with sandbags or other measures as specified in the Storm Water Pollution Prevention Plan (SWPPP) to prevent run off to roadways. i) All paved roads within the construction site shall be swept at least twice daily (or less during periods of precipitation) on days when construction activity occurs to prevent the accumulation of dirt and debris. j) At least the first 500 feet of any public roadway exiting from the construction site shall be swept at least twice daily (or less during periods of precipitation) on days when construction activity occurs or on any other day when dirt or runoff from the construction site is visible on the public roadways. k) All soil storage piles and disturbed areas that remain inactive for longer than 10 days shall be covered, or shall be treated with appropriate dust suppressant compounds. I) All vehicles that are used to transport solid bulk material on public roadways and that have potential to cause visible emissions shall be provided with a cover, or the materials shall be sufficiently wetted and loaded onto the trucks in a manner to provide at least one foot of freeboard. m) Wind erosion control techniques (such as windbreaks, water, chemical dust suppressants, and/or vegetation) shall be used on all construction areas that may be disturbed. Any windbreaks installed to comply with this condition shall remain in place until the soil is stabilized or permanently covered with vegetation. n) Construction areas adjacent to any publicly accessible roadway shall be provided with an eight foot high temporary fence. This fence shall be lined with material (such as solid construction tarp) to prevent transport of fugitive dust to publicly accessible areas. This fence can be removed after the end of the facility's construction period. Verification: The project owner shall include in the Monthly Compliance Report (MCR): (1) a summary of all actions taken to maintain compliance with this condition; (2) copies of any complaints filed with the air district in relation to project construction; and (3) any other documentation deemed necessary by the CPM and AQCMM to verify compliance with this condition. Such information may be provided via electronic format or disk at the project owner's discretion. 114

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 21 of 54

AQ-SC4

Dust Plume Resøonse Requirement: The AQCMM or an AQCMM Delegate shall monitor all construction activities for visible dust plumes. Observations of visible dust plumes that have the potential to be transported (1) off the project site or (2) 200 feet beyond the centerline of the construction of linear facilities or (3) within 100 feet upwind of any regularly occupied structures not owned by the project owner indicate that existing mitigation measures are not resulting in effective mitigation. The AQCMP shall include a section detailing how the additional mitigation measures will be accomplished within the time limits specified. The AQCMM or Delegate shall implement the following procedures for additional mitigation measures in the event that such visible dust plumes are observed: Step 1: The AQCMM or Delegate shall direct more intensive application of the existing mitigation methods within 15 minutes of making such a determination. Step 2: The AQCMM or Delegate shall direct implementation of additional methods of dust suppression if step 1 specified above fails to result in adequate mitigation within 30 minutes of the original determination. Step 3: The AQCMM or Delegate shall direct a temporary shutdown of the activity causing the emissions if step 2 specified above fails to result in effective mitigation within one hour of the original determination. The activity shall not restart until the AQCMM or Delegate is satisfied that appropriate additional mitigation or other site conditions have changed so that visual dust plumes will not result upon restarting the shutdown source. The owner/operator may appeal to the CPM any directive from the AQCMM or Delegate to shut down an activity, provided that the shutdown shall go into effect within one hour of the original determination, unless overruled by the CPM before that time.

Verification; The project owner shall include in the Monthly Compliance Report (MCR): (1) a summary of all actions taken to maintain compliance with this condition; (2) copies of any complaints filed with the air district in relation to project construction; and (3) any other documentation deemed necessary by the CPM and AQCMM to verify compliance with this condition. Such information may be provided via electronic format or disk at the project owner's discretion. AQ-SC5 Diesel-Fueled Engine Control: The AQCMM shall submit to the CPM, in the Monthly Compliance Report (MCR), a construction mitigation report that demonstrates compliance with the following mitigation measures for the purposes of controlling diesel construction-related emissions. Any deviation from the following mitigation measures shall require prior CPM notification and approval.

115

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 22 of 54

a) All diesel-fueled engines used in the construction of the facility shall be fueled only with ultra-low sulfur diesel, which contains no more than 15 ppm sulfur. b) All diesel-fueled engines used in the construction of the facility shall have clearly visible tags issued by the on-site AQCMM showing that the engine meets the conditions set forth herein. c) All construction diesel engines, which have a rating of 100 hp or more, shall meet, at a minimum, the Tier 2 California Emission Standards for Off-Road Compression-Ignition Engines as specified in California Code of Regulations, Title 13, section 2423(b)(1) unless certified by the on-site AQCMM that such engine is not available for a particular item of equipment. In the event a Tier 2 engine is not available for any off-road engine larger than 100 hp, that item of equipment shall be equipped with a Tier 1 engine. In the event a Tier 1 item of equipment is not available for any off-road engine larger than 100 hp, that engine shall be equipped with a catalyzed diesel particulate filter (soot filter), unless certified by engine manufacturers or the on-site AQCMM that the use of such devices is not practical for specific engine types. For purposes of this condition, the use of such devices is Thot practical" if, among other reasons: 1) There is no available soot filter that has been certified by either the California Air Resources Board or U.S. Environmental Protection Agency for the engine in question; or 2) 3) The construction equipment is intended to be on-site for ten (10) days or less. The CPM may grant relief from this requirement if the AQCMM can demonstrate that they have made a good faith effort to comply with this requirement and that comphance is not possible. The CPM may grant relief from Tier 2 requirement for construction diesel engines, which have a rating of 100 hp or more, if they are owned and/or operated by a Disadvantaged Business Enterprise certified by the San Francisco Human Rights Commission.

4)

d) The use of a soot filter may be terminated immediately if one of the following conditions exists, provided that the CPM is informed within ten (10) working days of the termination: 1) The use of the soot filter is excessively reducing normal availability of the construction equipment due to increased downtime for maintenance, and/or reduced power output due to an excessive increase in backpressure. .116

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 23 of 54

2) 3) 4)

The soot filter is causing or is reasonably expected to cause significant engine damage. The soot filter is causing or is reasonably expected to cause a significant risk to workers or the public. Any other seriously detrimental cause which has the approval of the CPM prior to the termination being implemented.

e) All heavy earthmoving equipment and heavy duty construction related trucks with engines meeting the requirements of (c) above shall be properly maintained and the engines tuned to the engine manufacturer's specifications. f) All diesel heavy construction equipment shall not remain running at idle for more than five minutes, to the extent practical. Verification: The project owner shall include in the MCR: (1) a summary of all actions taken to maintain compliance with this condition; (2) copies of all diesel fuel purchase records; (3) a list of all heavy equipment used on site during that month, including the owner of that equipment and a letter from each owner indicating that equipment has been properly maintained; and (4) any other documentation deemed necessary by the CPM and AQCMM to verify compliance with this condition. Such information may be provided via electronic format or disk at the project owners discretion. AQ-SC6 The project owner shall submit to the CPM for review and approval any modification proposed by the project owner to any project air permit. The project owner shall submit to the CPM any modification to any permit proposed by the District or U.S. EPA, and any revised permit issued by the District or U.S. EPA for the project.

Verification: The project owner shall submit any proposed air permit modification to the CPM within five working days of its submittal either by 1) the project owner to an agency, or 2) receipt of proposed modifications from an agency. The project owner shall submit all modified air permits to the CPM within 15 days of receipt. AQ-SC7 The project owner shall surrender 47.5 tons of NOx from the emission offset credits certificate number 896 at the time that surrender is required by condition AQ-38. The project owner may request CPM approval for any substitutions or modification of credits. The CPM, in consultation with the District, may approve any such change to the NOx ERC list provided that the project remains in compliance with all applicable laws, ordinances, regulations, and standards, the requested change(s) clearly will not cause the project to result in a significant environmental impact, and each requested change is consistent with applicable federal and state laws and regulations.

117

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 24 of 54

Verification: The project owner shall submit to the CPM a list of NO ERCs to be surrendered to the District at least 60 days prior to initial startup. If the CPM, in consultation with the District, approves a substitution or modification, the CPM shall file a statement of the approval with the commission docket and mail a copy of the statement to every person on the post-certification mailing list. The CPM shall maintain an updated list of approved NO ERCs for the project. AQ-SC8 The project owner shall comply with all staff (AQ-SC) and district (AQ) Conditions of Certification. The CPM, in consultation with the District, may approve as an insignificant change any change to an air quality Condition of Certification, provided that: (1) the project remains in compliance with all applicable laws, ordinances, regulations, and standards; (2) the requested change clearly will not cause the project to result in a significant environmental impact; (3) no additional mitigation or offsets will be required as a result of the change; (4) no existing daily, quarterly, or annual permit limit will be exceeded as a result of the change; and (5) no increase in any daily or annual permit limit will be necessary as a result of the change. Verification: The project owner shall notify the CPM in writing of any proposed change to a Condition of Certification pursuant to this condition and shall provide the CPM with any additional information the CPM requests to substantiate the basis for approval. AQ-SC9 If the project owner does not participate in the voluntary California Climate Action Registry, then the project owner shall report on a quarterly basis to the CPM the quantity of greenhouse gases (GHG) emitted as a direct result of facility electricity production as follows: The project owner shall maintain a record of fuel use in units of million-Btus (mmBtus) for all fuels burned on-site for the purpose of power production. These fuels shall include but are not limited to: (1) all fuel burned in the combustion turbines, (2) HRSGs (if applicable) or auxiliary boiler (if applicable), and (3) all fuels used in any capacity for the purpose of turbine startup, shutdown, operation or emission controls. The project owner may perform annual source tests of CO and CH 4 2 emissions from the exhaust stacks while firing the facility's primary fuel, using the following test methods or other test methods as approved by the CPM. The project owner shall produce fuel-based emission factors in units of lbs GHG per mmBtu of fuel burned from the annual source tests. If a secondary fuel is approved for the facility, the project owner may also perform these source tests while firing the secondary fuel.

118

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 25 of 54

Pollutant 2 CO 4 Cl-I

Test Method EPA Method 3A EPA Method 18 (VOC measured as Cl-I ) 4

As an alternative to performing annual source tests, the project owner may use the Intergovernmental Panel on Climate Change (IPCC) Methodologies for Estimating Greenhouse Gas Emissions (MEGGE). If MEGGE is chosen, the project owner shall calculate the , , 2 4 C0 CH and N emissions using the appropriate fuel-based 0 2 carbon content coefficient (for C0 and the appropriate fuel-based ) 2 emission factors (for CH and N 4 0). 2 The project owner shall convert the N and CH emissions into CO 0 2 4 2 equivalent emissions using the following IPCC Global Warming Potentials (GWP): 310 for N (1 pound of N is equivalent to 310 0 2 0 2 pounds of C0 and 21 for CH ) 2 . 4 The project owner shall maintain a record of all SF that is used for 6 replenishing on-site transformers. At the end of each reporting period, the project owner shall total the mass of SF used and 8 convert that to a CO equivalent emission using the IPCC GWP of 2 23,900 for SF . 6 On a quarterly basis, the project owner shall report the CO and CO 2 2 equivalent emissions from the described emissions of CO N , 0, 2 2 , 4 CH and SF . 5 Verification: Any greenhouse gas emissions that are reported by the project owner to the California Climate action Registry or pursuant to this condition shall be reported to the CPM as part of the fourth Quarterly or the annual Air Quality Report. AQ-SCIO For as long as the project is in operation, the project owner shall provide daily Street cleaning services using high-efficiency street sweepers for a total of no less than 9.6 miles of Third, Cesar Chavez, tui, 16 Illinois, Tennessee, Evans, 23w, 25 streets and Pennsylvania Ave. Verification: The project owner shall keep daily records of the street sweeping activities and shall submit to the CPM the quarterly and annual compliance reports as required by Condition AQ-18. AQ-SCI I The project owner shall provide an additional 4 TPY of PM 25 emission reduction credits by subsidizing the replacement or modification (blocking chimneys) of wood stoves or fireplaces.

119

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 26 of 54

At least 30 days prior to the start of any site clearing or ground Verification: activities, the project owner shall provide the CPM, for approval, a final disturbance 5 . 2 plan to acquire 4 TPY of PM emission reduction credits. The wood stove and fireplace replacement or modification programs must start after the plan approval, and no later than 60 days prior to initial startup. AQ-SCI 2 In lieu of compliance with Condition AQ-SCI 1, the project owner shall provide 36 TPY of SO emission reduction credits acquired in the local Hunters Point and/or Potrero areas to provide an annual equivalent of . 25 12 TPY of PM

Verification: The project owner shall submit to the CPM a list of ERCs to be surrendered to the District at least 60 days prior to initial startup. DISTRICT CONDITIONS OF CERTIFICATION

Permit Conditions
Definitions: Clock Hour: Calendar Day: Year: Heat Input: Rolling 3-hour period: Firing Hours: MM Stu: My continuous 60-minute period beginning on the hour. Any continuous 24-hour period beginning at 12:00 AM or 0000 hours. Any consecutive twelve-month period of time All heat inputs refer to the heat input at the higher heating value (HHV) of the fuel, in Btulscf. Any three-hour period that begins on the hour and does not include start-up or shutdown periods. Period of time during which fuel is flowing to a unit, measured in fifteen-minute increments. million British thermal units

Gas Turbine Start-up Mode: The lesser of the first 120 minutes of continuous fuel flow to the Gas Turbine after fuel flow is initiated or the period of time from Gas Turbine fuel flow initiation until the Gas Turbine achieves two consecutive CEM data points in compliance with the emission concentration limits of conditions 20(b) and 20(d). Gas Turbine Shutdown Mode: The lesser of the 30 minute period immediately prior to the termination of fuel flow to the Gas Turbine or the period of time from non-compliance with any requirement listed in Conditions 20(b) through 20(d) until termination of fuel flow to the Gas Turbine. The polycyclic aromatic hydrocarbons listed below shall Specified PAKs: be considered to Specified PAHs for these permit conditions. Any emission limits for Specified PAHs refer 120

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 27 of 54

Corrected Concentration:

Commissioning Activities:

Commissioning Period:

to the sum of the emissions for all six of the following compounds. Benzo[a]anthracene Benzo[b)fluoranthene Benzo[k]fluoranthene Benzo[a]pyrene Dibenzo[a,h]anthracene lndeno[i ,2,3-cdjpyrene The concentration of any pollutant (generally NOR, CO, ) 3 or NH corrected to a standard stack gas oxygen concentration. For emission point P-i (exhaust stack of S-i Gas Turbine), emission point P-2 (exhaust stack of 5-2 Gas Turbine) and P-3 (exhaust stack of 5-3 Gas Turbine) the standard stack gas oxygen concentration is 15% 02 by volume on a dry basis. All testing, adjustment, tuning, and calibration activities recommended by the equipment manufacturers and the SFERP construction contractor to insure safe and reliable steady state operation of the gas turbines, heat recovery steam generators, steam turbine, and associated electrical delivery systems. The Period shall commence when all mechanical, electrical, and control systems are installed and individual system start-up has been completed, or when a gas turbine is first fired, whichever occurs first. The period shall terminate when the plant has completed performance testing, is available for commercial operation, and has initiated sales to the power exchange. Any compound of carbon, excluding methane, ethane, carbon monoxide, carbon dioxide, carbonic acid, metallic carbides or carbonates, and ammonium carbonate California Energy Commission Compliance Program Manager San Francisco Electric Reliability Project

Precursor Organic Compounds (POC5):

CEC CPM: SFERP:

CONDITIONS FOR THE COMMISSIONING PERIOD

AQ-1

The owner/operator of the SFERP shall minimize emissions of carbon monoxide and nitrogen oxides from S-i, 5-2, and S-3, Gas Turbine Combustors to the maximum extent possible during the commissioning period. Conditions i through 12 will only apply during the commissioning period as defined above. Unless otherwise 12i

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 28 of 54

indicated, Conditions 13 through 42 will apply after the commissioning period has ended. Verification: The project owner shall submit a monthly compliance report to the CPM specifying how this condition is being complied with. AQ-2 At the earliest feasible opportunity, in accordance with recommendations of the equipment manufacturers and construction contractor, the owner/operator shall ensure that S-i, and 5-3, Gas Turbine Combustors are tuned to minimize emissions of carbon monoxide and nitrogen oxides. the the S-2, the

The project owner shall submit a monthly compliance report Verification: to the CPM specifying how this condition is being complied with. At the earliest feasible opportunity, in accordance with the AQ-3 recommendations of the equipment manufacturers and the construction contractor, the owner/operator shall install, adjust, and operate A-i through A-6, 5CR and Oxidation Systems, to minimize the emissions of carbon monoxide and nitrogen oxides from S-i, 5-2, and S-3, Gas Turbine Combustors. The project owner shall submit a monthly compliance report Verification: to the CPM specifying how this condition is being complied with. AQ-4 Coincident with the as-designed operation of A-i thru A-6, 5CR and Oxidation Systems, pursuant to Parts 3, 8, 9 and 10 of this condition, the owner/operator shall ensure that the Gas Turbine Combustors (51, S-2, and S-3) comply with the NO and CO emission limitations specified in Parts 20(a) through 20(d) of this condition.

The project owner shall submit a monthly compliance report Verification: to the CPM specifying how this condition is being complied with. The owner/operator of the SFERP shall prepare a plan describing the AQ-5 procedures to be followed during the commissioning of the gas turbines. The plan shall be submitted the Oistrict Engineering DMsion and the CEC CPM at least four weeks prior to first firing of 5-1, S-2, or 5-3, Gas Turbine Combustors. The plan shall include a description of each commissioning activity, the anticipated duration of each activity in hours, and the purpose of the activity. The activities described shall include, but not be limited to, the tuning of the Water Injection system, the installation and operation of the 5CR systems and oxidation catalysts, the installation, calibration, and testing of the CO and NO continuous emission monitors, and any activities requiring the firing of the Gas Turbine Combustors (S-i, 5-2, and 5-3) without abatement by their respective 5CR and Oxidation Systems. No Gas Turbine Combustor (S-i, S-2, or S-3) shall be fired sooner than 28 days after the District receives the commissioning plan. The project owner shall submit a monthly compliance report Verification: to the CPM specifying how this condition is being complied with. 122

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 29 of 54

AQ-6

During the commissioning period, the owner/operator of the SFERP shall demonstrate compliance with Conditions 8 through ii of this condition through the use of properly operated and maintained continuous emission monitors and data recorders for the following parameters: · · · · · firing hours for each gas turbine (S-i, 5-2, and S-3) fuel flow rates to each train stack gas nitrogen oxide emission concentrations at P-i, P-2, and P-3 stack gas carbon monoxide emission concentrations P-i, P-2, and P-3 stack gas oxygen or carbon dioxide concentrations P-i P-2, and P-3

The owner/operator shall monitor the parameters and record at least once every 15 minutes (excluding normal calibration periods or when the monitor source is not in operation) for the Gas Turbine Combustors (S-i, 5-2, and 5-3). The owner/operator shall use District-approved methods to calculate heat input rates, NO (as NO ) 2 mass emission rates, carbon monoxide mass emission rates, and NOA and CO emission concentrations, summarized for each clock hour and each calendar day. AU records shall be retained on site for at least 5 years from the date of entry and made available to District personnel upon request. Verification: The project owner shall submit a monthly compliance report to the CPM specifying how this condition is being complied with. AQ-7 The owner/operator shall install, calibrate, and properly operate District-approved continuous emission monitors specified in Condition 6 prior to the first firing of the Gas Turbine Combustors (S-i, S-2, and 5-3). After first firing of the turbines, the detection range of these continuous emission monitors must be adjusted as necessary to accurately measure the resulting range of CO and NO emission concentrations. The type, specifications, and location of these monitors shall be subject to District review and approval (by the District's Source Test Section).

Verification: The project owner shall submit a monthly compliance report to the CPM specifying how this condition is being complied with. In addition, the project owner shall provide evidence of the District's approval of the emission monitoring system to the CPM prior to first firing of the gas turbines. AQ4 The owner/operator shall not exceed 100 hours of firing during the commissioning period of S-i, Gas Turbine Combustor without abatement of nitrogen oxide emissions by A-i, SCR System. Such 123

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 30 of 54

operation of S-i, Gas Turbine Combustor without abatement shall be limited to discrete commissioning activities that can only be properly executed without the SCR or Oxidation Catalyst Systems fully operational. Upon completion of these activities, the owner/operator shall provide written notice to the District's Engineering and Enforcement Divisions, and the unused balance of the 100 firing hours without abatement shall expire. The project owner shall submit a monthly compliance report Verification: to the CPM specifying how this condition is being complied with. The owner/operator shall not exceed 100 hours of firing during the AQ-9 commissioning period of S-2, Gas Turbine Combustor without abatement of nitrogen oxide emissions by A-3, 5CR System. Such operation of S-2, Gas Turbine Combustor without abatement shall be limited to discrete commissioning activities that can only be properly executed without the SCR or Oxidation Catalyst Systems fully operational. Upon completion of these activities, the owner/operator shall provide written notice to the District's Engineering and Enforcement Divisions, and the unused balance of the 100 firing hours without abatement shall expire. The project owner shall submit a monthly compliance report Verification: to the CPM specifying how this condition is being complied with. The owner/operator shall not exceed 100 hours of firing during the AQ-1 0 commissioning period of 5-3, Gas Turbine Combustor without abatement of nitrogen oxide emissions by A-5, 5CR System. Such operation of 5-3, Gas Turbine Combustor without abatement shall be limited to discrete commissioning activities that can only be properly executed without the SCR or Oxidation Catalyst Systems fully operational. Upon completion of these activities, the owner/operator shall provide written notice to the District Engineering and Enforcement Divisions. And the unused balance of the 100 firing hours without abatement shall expire. Verification: The project owner shall submit a monthly compliance report to the CPM specifying how this condition is being complied with. The owner/operator shall calculate the total mass emissions of AQ-1 I nitrogen oxides, carbon monoxide, precursor organic compounds, , 10 PM and sulfur dioxide that are emitted by each Gas Turbine Combustor (S-i, S-2, and S-3) during the commissioning period. These emissions count towards the consecutive twelve-month emission limitations specified in Condition 23 of this condition. Verification: The project owner shall submit in the monthly compliance report to the CPM specifying how this condition is being complied with.

124

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 31 of 54

Prior to the end of the Commissioning Period, the owner/operator shall conduct a District- and CEC-approved source test using external continuous emission monitors to determine compliance with Condition 18 of this condition. The source test shall determine NOR, CD, and POC emissions during start-up and shutdown of the gas turbines. The POC emissions shall be analyzed for methane and ethane to account for the presence of unburned natural gas. The source test shall include a minimum of three start-up and three shutdown periods. No later than twenty working days before the execution of the source tests, the owner/operator shall submit to the District and the CEC Compliance Program Manager (CPM) a detailed source test plan designed to satisfy the requirements of this condition. The District and the CEC CPM will notify the owner/operator of any necessary modifications to the plan within 20 working days of receipt of the plan; otherwise, the plan shall be deemed approved. The owner/operator shall incorporate the District and CEC CPM comments into the test plan. The owner/operator shall notify the District and the CEC CPM within seven (7) working days prior to the planned source testing date. Source test results shall be submitted to the District and the CEC CPM within 60 days of the source testing date. Verification: No later than 30 working days before the commencement of the source tests, the project owner shall submit to the District and the CPM a detailed source test plan designed to satisfy the requirements of this condition. The District and the CPM will notify the project owner of any necessary modifications to the plan within 20 working days of receipt of the plan; otherwise, the plan shall be deemed approved. The project owner shall incorporate the District and CPM comments into the test plan. The project owner shall notify the District and the CPM within seven (7) working days prior to the planned source testing date. Source test results shall be submitted to the District and the CPM within 60 days of the source testing date. Conditions for the Gas Turbine Combustors (S-I, S-2, and S-3) AQ-13 The owner/operator shall ensure that S-i, S-2 and S-3 gas turbine combustors are fired on PUC natural gas exclusively. (Basis: BACT for SO and PM 2 ) 10

AQ-12

Verification: The project owner shall complete, on a monthly basis, a laboratory analysis showing the sulfur content of natural gas being burned at the facility. The daily sulfur analysis reports shall be incorporated into the quarterly compliance reports. The owner/operator shall ensure that heat input rate to each Gas Turbine Combustor (S-i, S-2, and S-3) does not exceed 487.3 MM Btu per hour, averaged over one hour period. (Basis: 2-1-234) Verification: As part of the quarterly and annual compliance reports, the project owner shall include information on the date, time, and duration of any violation of this permit condition. 125 AQ-14

Case 3:07-cv-04936-CRB

Document 42-3

Filed 03/03/2008

Page 32 of 54

AQ-15

Except during the commissioning period, the owner/operator of S-i, Gas Turbine Combustor shall properly operate and properly maintain A-i, Selective Catalytic Reduction (5CR) and A-2, Oxidation Catalyst Systems whenever fuel is combusted at the source and the A-i catalyst bed has reached minimum operating temperature. (Basis: BACT for NO and CO) Verification: As part of the quarterly and annual compliance reports, the project owner shall include information on the date, time, and duration of any violation of this permit condition. Except during the commissioning period, the owner/operator of S-2, AQ-16 Gas Turbine Combustor shall properly operate and properly maintain A-3, Selective Catalytic Reduction (SCR) and A-4, Oxidation Catalyst Systems whenever fuel is combusted at those sources and the A-a catalyst bed has reached minimum operating temperature. (Basis: BACT for NO and CO) Verification: As part of the quarterly and annual compliance reports, the project owner shall provide information on any major problem in the operation of the Oxidizing Catalyst and Selective Catalytic Reduction Systems for the Gas Turbines and HRSGs. The information shall include, at a minimum, the date and description of the problem and the steps taken to resolve the problem. AQ-17 Except during the commissioning period, the owner/operator of S-3, Gas Turbine Combustor shall properly operate and properly maintain A-5, Selective Catalytic Reduction (SCR) and A-6, Oxidation Catalyst Systems whenever fuel is combusted at the source and the A-S catalyst bed has reached minimum operating temperature. (Basis: BACT for NO and CO) Verification: As part of the quarterly and annual compliance reports, the project owner shall provide information on any major problem in the operation of the Oxidizing Catalyst and Selective Catalytic Reduction Systems for the Gas Turbines and HRSGs. The information shall include, at a minimum, the date and description of the problem and the steps taken to resolve the problem. AQ-1B The owner/operator of the Gas Turbine Combustors (S-i, S-2, and 53) shall comply with requirements (a) through (h) below under all operating scenarios, except requirements (a) through (h) do not apply during a gas turbine start-up or shutdown. (Basi