Case 3:07-cv-04936-CRB

Document 42-2

Filed 03/03/2008

Page 1 of 13

EXHIBIT A

CALIFORNIA

ISO

California Independent System Operator
Case 3:07-cv-04936-CRB

Action Plan For San Francisco Options & Risks
Larry Tobias
California Independent System Operator Pacific Gas & Electric Qpmpany City and County of San Francisco Interested Stakeholders / Public Participants

Document 42-2 Filed 03/03/2008 Page 2 of 13

Gary DeShazo 1 Larry Tobias
1 October 26, 2004

Ond Planning Cahfomla ISO

-

CALIFORNIA
California Independent System OperatoT

ISO

p
Background

Case 3:07-cv-04936-CRB

Memo to the ISO Board on Sept. 10. 2004

This memo provided analysis and recommendations as to:

Document 42-2

· The Action Plan for release of PG&E owned generation at Hunters Point and Mirant owned generation at Potrero from ISO Reliability Must Run (RMR) Agreements,

Filed 03/03/2008

An analysis of the retrofit of the Potrero 3 Power Plant with emissions control technology and how that impacts the Action Plan, and

· A discussion of the reliability of Hunters Point Unit 4 and the appropriateness of its designation as a RMR generation unit.

Page 3 of 13

Gary DeShazo I Larry Tobias

Grid Planning California !O

-

October 26, 2004

CALl F ORN IA

ISQ
=i=ndent

Aótion Plan SuimaryJ

Case 3:07-cv-04936-CRB

Action Plan to Release Hunters Point and Potrero from their RMR Agreements

--

Document 42-2

An Action Plan acceptable to the ISO for release of the existing generation at Hunters Point and Potrero from RMR contracts involves successful completion of a total of 12 transmission projects by PG&E, four peaking power plants by the City, and the Mirant retrofit of Potrero 3 with emissions control technology for its temporary operation.

Filed 03/03/2008

The ISO does not control the dates of completion of these projects, nor does it control the permanent shutdown of the Hunters Point and Potrero generation.

Page 4 of 13

Gary DeShazo (Larry Tobias 3 October 26, 2004

Grid Planning California ISO

-

CALIFORNIA

ISO
California Independent System Operator

Case 3:07-cv-04936-CRB

[Action Plan P

· The action plan acceptable to the ISO for the shut down of Hunters Point and Potrero units is based on assumptions that are subject to change.

Document 42-2

· Such assumptions include current and expected status of transmission, generation, and customer demand.

Filed 03/03/2008

· Any significant change to the assumptions underlying our analysis may change our conclusions.

· If such significant changes do occur, the ISO is obligated to review the continued acceptability of this action plan.

Page 5 of 13

Gary DeShazo I Larry Tobias 4 October 26, 2004

Grid Planning Caljfp

-

Ia ISO

CALIFORNIA

ISO
California Independent System Operator

Case 3:07-cv-04936-CRB

Conditions

,lease From RMR

Document 42-2

Hunters Point Units #2 & #3 for 2005
--

Potrero Static VAR Compensator

Dec. 2004

Filed 03/03/2008 Page 6 of 13

Gary DeShazo / Larry Tçbias

Grid Planning Cahfoniia ISO

-

October 2, 2004

CALIFORNIA

ISO
California Independent System Operator

Conditions To: Release From RMR

Case 3:07-cv-04936-CRB

Hunters Point Units #1 & #4 forlin 2006
--

·
--

San Mateo-Martin #4 line 60/115 kV conversion

Completed

·
--

Ravenswood 2nd 230/115 kV transformer bank Completed

Completed

Document 42-2

·

SF Internal Cable Emergency Ratings

·
--

Tesla-Newark #2 230 kV reconductoring --May 2005 May 2005
--

·

Ravenswood-Ames reconductoring

·

San Mateo 230 kV Bus insulator replacement

Mat 2005 Dec. 2005

Filed 03/03/2008

·
--

Potrero-Hunters Point (AP-1) 115 Ky cable

·

Jefferson-Martin 230 kV line

Dec 2005/March 2006
--

Page 7 of 13

Potrero Unit #3 Selective Catalytic Reduction (SCR) retrofit

Feb. 2005

Gary DeShazo I Larry Tolas

Grid Planning Oalifornia ISO

-

6

October 26, 2004

C 4.1.1 F 0 it N I A. I S ()
California Independent System Operator

Case 3:07-cv-04936-CRB

Conditions To Release From RMR

Potrero Units #4, #5, & #6 for 2007
--

Document 42-2

San Francisco Electric Reliability Project (4 combustion turbine generator units) Dec. 2006

Filed 03/03/2008 Page 8 of 13

Gary Deshazo I Larry Tobias 7

91 !Ining

-

Pctobar 26, 2004

CALIFORNIA

ISO
California Independent System Operator

Case 3:07-cv-04936-CRB

Conditions Tb Release From RMa

Potrero Unit #3 for/in 2007
--

Document 42-2

·
--

Newark-Dumbarton 115 kV line reconductoring

May 2006

·

Bair-Belmont 115 kV line reconductoring

May 2006 or 2007

·

Metcalf-Hicks & Metcaif-Vasona 230 kV lines reconductoring -May 2007
--

Filed 03/03/2008

·

Ravenswood Substation shut capacitors

May 2007

Page 9 of 13

Gary DeShazo I Larry Tobias S October 26, 2004

Grid Planning California ISO

-

California Independent System Operator

CALIFORNIA ISO Study Area :z
pkton

Case 3:07-cv-04936-CRB

-,

Document 42-2 Filed 03/03/2008

Page 10 of 13

I

Gary Deshajo I Larry Tobjas

-- ._,

Grid Planning California Iso

-

9

Octobr 26, 2004

CALIFORNIA
I --

ISO
InirasirilcUim
· ·
-- --

California Independent System Operator

EJA9ARCADERO*1 ARIUN· NISSION pGaf LaThing Puna Pbi'I

SAN FRANCISCO
Hnta?sPo4tB
-- -- --

Po*Ioro· pn uonagnaid Trw1at pnned Ovatloed

Case 3:07-cv-04936-CRB

lran.aitsb% i-ta

Document 42-2

Filed 03/03/2008

To East

xit.

Subaiofl

To Newark subataon
5'

RAVENSW000

SUBSTA.TIQN
*

Page 11 of 13

b To MelcaW SubMabOfl

Gary DeShaZO I Larry

Grid Planning california ISO

-

10

04 0 2 Oçtcber26.

CALIFORNIA
California independent System Operator
--II

ISO

L

Case 3:07-cv-04936-CRB

I,

I

For SFSSG

Document 42-2

Determine a preferred Option for maintaining longterm reliable load serving capability within San Francisco and the Peninsuia

Filed 03/03/2008 Page 12 of 13

ary DeShazo / Larry Tobias.
11

rid Planning california

-

iso

:0ttober26, 2004

CALIFORNIA

ISO

California Independent System Operator

Case 3:07-cv-04936-CRB

Document 42-2

takeholder Comments

Filed 03/03/2008 Page 13 of 13

Gary DeShazo I Larry Tobias 12 October 26, 2004

Grid Planning !°`! ISO

-