Free Motion for Summary Judgment - District Court of Federal Claims - federal


File Size: 838.2 kB
Pages: 17
Date: December 31, 1969
File Format: PDF
State: federal
Category: District
Author: unknown
Word Count: 2,715 Words, 15,976 Characters
Page Size: 622 x 792 pts
URL

https://www.findforms.com/pdf_files/cofc/1797/53-5.pdf

Download Motion for Summary Judgment - District Court of Federal Claims ( 838.2 kB)


Preview Motion for Summary Judgment - District Court of Federal Claims
Case 1:02-cv-01894-EJD

Document 53-5

Filed 07/09/2004

Page 1 of 17

Power

consumers

M/CH/GA/rS P*~/GRF~5 August 19, 1993

US Department of Energy Contracting Officer PR-322.1 1000 IndependenceAve, Washington, DC 20585 Dear Ms Beth Tomasoni: References: 1) To ThomasC Bordine (CPCo) from Beth Tomasoni (DOE), 7/23/93 2) To Linda Stroud (DOE), from TCBordine (CPCo), 4/13/93. Reference 1 asks for corrections to the Delivery Commitment Schedule's (DeS's) sent in Reference 2. This letter will address those corrections. DC$No. 99-120]-4374-0] The DOE rejected the DCS because the earliest discharge date 2.6, 3/23/74 corresponded to Cyc]e 11 fuel which was reported to be all shipped off-site. The data for these fuel pins was reported incorrectly. The range of dates should be 6/2/74 to 9/26/93 which corresponds to Cycles 12 and 26. The Cycle 26 RW-859will be submitted this year,as required days aftercycle 90 start-up. The piecelist has been updated reflect to the cycledischarge date of each item.Corrected DCS formsare also attached. DCS No. 99-]20]-4374-04 The DOE rejected the DCS because the present process does not handle non-fuel material. This DCS is resubmitted a sing]eBWR fuel assembly as with the full rangeof acceptable delivery dates.The intention to changethe DCS later is as the DOE expands its process. No. 00-]201-4374-0~ The DOErejected the DCSbecause the discharge dates 2.6, do not correspond to the end of Big Rock Point Cycles. Big Rock Point predicted discharge dates into the future and the DOErequires that only discharge dates specified by completed RW-859's be used. The DCShas been revised to reflect only assemblies discharged of the latestcycle, as Cycle26, 6/26/93. DCSNO. 00-120]-4274-03 The DOE rejected the DCS because the discharge dates2.6, do not correspond to the end of Big Rock PointCycles, sinceBig Rock Pointpredicted discharge datesinto the future.The DCS has been deleted sinceit dealsonly with future discharge assemblies. 0~.00~026 A CMS ~JV~C'RG,'Y"COMPANY

CPTO01 0144

Case 1:02-cv-01894-EJD
PC$No. 00-1204-4374-0]

Document 53-5

Filed 07/09/2004

Page 2 of 17

The DOErejected the DC$because the ~denttfication number was unacceptable. Pa]isades assumedthat the 12 digit number had to be untque,.however the DOE requests that the purchaser or contract number be sequenced per year. Given this and the above DCSbeing deleted the DCSnumber should be 00-1204-4374-03. Also note that the specified discharge date of 6/4/93 will be specified in the next RW-859 which is due gO days after cycle start-up from our current refueling outage. DESNo. 00-1204-4374-02 The DOErejected the OCSbecause the Identification numberwas unacceptab]e. Palisades assumedthat the 12 digit numberhad to be unique,, however the DOE requests that the purchaser or contract number be sequenced per year. Given this and the above DCS being deleted the DCS number should be 00-1204-4374-04, Also note that the specified discharge date of 6/4/93 will be specified in the next RW-859 which is due 90 days after cycle start-up from our current refueling outage, Btq Roc Point Cask k The Big Rock Point Cra~e is ~ated for 75 tons, however it is limited to o~ly 25 tons over the spent fuel pool. The possible loading of ,shipping casks will be:

1)

Use the 24 ton transfer reactor deck. deck.

cask from SFP to the 60 ton shipping cask on the

z) Hove the

60 ton shipping, cask to the floor of containment from the reactor

3) Truck the 60 ton shipping cask off. site. Palisades Cask We will submita response your concerns to regarding the Palisades Cask at a laterdate b~ separate coverletter. Yours very truly,

Thomas Bordine C Nuclear Fuel Supply Director CC: OJFremeau, PZ4-414A KOSMelds,BRP JCDodge, M-645A PJKluskowski, PAL GRBoss, BRP DGBarth, M-I074

CPT001 0145

Case 1:02-cv-01894-EJD

Document 53-5

Filed 07/09/2004

Page 3 of 17

U.S. DEPARTMENT OF ENERGY APPENDIX - DELIVERY C COMMITMENT SCHEDULE

1.0 IDENTIFICATION INFORMATION

(b) Address: 10~ US ~1 ~orth

2.0 DELIVERY COMMITMENT INFORMATION

Other

3.0 CERTIFICATIONS

3.1 3.2 M~(PLeaseTy~wor Print) 3.3 TitLe (Piea~e T~ or Print)

4.0

NOTIFICATION OF DOE APPROVAL

tedmlc~L Representative 4,2

TitLe

Date

01002069

CPT001 0187

Case 1:02-cv-01894-EJD

Document 53-5

Filed 07/09/2004

Page 4 of 17

U.S. DEPARTMENT OF ENERGY APPENDIX o DELIVERY C COMMITMENT ~::PIEDULE

I
1.0 IDENTIFICATION INFORMATION t,4 Reac~'/Faci~ty Informat~oa: (a) Name: Bi,~ Rock (b) Address: :L0269 US ~'(C) C~. State & Zig Code: _~.ha~le~oi~, :~1,1 DCS tdentif~Calio~ Number: ~9-1201-4374-01 1.2 {a) Name: G~ss {b) Telephone (include Area Cbee):616/$t=7-8251 1.3 Conlract Numt:~':

OELWERY COMMITMENT INFORMATION 2.1 2,2 2.4 2.5 Type CaskRequited (Maximum badedIKlir~j weight, in Ions): ~,~ (Not R~uJr~ qAssl~n~ bv DO~ Sh~in0 Lot Nu~ ~Hgt R~uir~) Mo/Oay/Yr (D~a~ged) (Not

~ 2.8 3.(~'

Pro~s~ Del~e~gate: I DOE ~sign~ DelN~ Comm~mentgate: Rangeof D~sct~argeDates: Mo/Day/Yr to (Earliest toL~tesI) 2.7 MetdcTons Uranium: (Initial) Q., 1 ? Number of Assembles: CERTIFICATIONS

tAssion~

bv DOE)

4.0 NOTIFICATION

OF DOE APPROVAL ~ Chief, Logist:ics an~ U~ilit:y

4.~ Approvedby gOE

.

12-14-93

01000076

CPTO01 0011

Case 1:02-cv-01894-EJD

Document 53-5

Filed 07/09/2004

Page 5 of 17

1.1 DCSlderr~c~ion Number:

1.4 Reactor~F~c~,~

I~:

2.O

CF.JmRCAllONS

4.0 ~1 NOTIF~ATION OF DOE APPROV

01000077

19

CPTOOI-o012

Case 1:02-cv-01894-EJD

Document 53-5

Filed 07/09/2004

Page 6 of 17

INFORMAT/ON 1.0 IDENTIFICATION 1.1 1.4

12 Contact Person: (a) Name: (inctudeArea Code): 6.1.6.-Skl"-653"T (b) Telephone 13 Contract Numbe~. p~-CROl-83~h3T~ 2.0 DELIVERY COMMITMENT INFORMJ~TION 2.1 TypeCaskRequired (Maximum loadedlifting weight, in tons): 2~ t(m tra~afe: 2.2 Sh~pping Nurnbe~. Lot (NedReoulred~ (~msl~ned DOE} by 23 Pmposod Shipping Mode: TnJck_..~; R~]_~___; ¯ Barge______ Der~ery Date: 2.4 Proposed tNot Required)(Aselanedby DOE} Assigned De~iveP/Commitment Date: 2.5 DOE ~ ~ 8p Range Disch~ge of Dates: 2.6 Mo Day Yr to MolDaylYr / / (Earliest Latest) to (Discharged) ~NotReoulred~ (Initial) 2.7 MefficTonsUranium: PWR Other~ of BWR 2.8 Number Assemblies: 3.0 CERTIFICATIONS

4~0NOTIFICATION DOEAPPROVAL OF

CPT00I 0028

Case 1:02-cv-01894-EJD

Document 53-5

Filed 07/09/2004

Page 7 of 17

U.S. DEPARTMENT ENERGY OF
.~.PPE~I~X - DELIVERY C CO~TI,Fcwr $¢HEDULE

1.1 1.2

Number: ~, 99-!2~ZJ,3TLO (a) Na~:G,,R~oss ........... (b) Te.~ (include A,'ea Code):

1 4 Re~-'torlFecilityInformation: (a) Name" 9i=; 10269~JS31 North AddreSs': Rock (c) C~y.Sta~e& ~ C~e:Ch2~levoix, ~97~0

1.3 Contt"~:= Number: INFORMATION 2.0 DELIVERY~J~MMITMENT 2.1 2.2 2.3 2.4 2.5 2,6 TypeC~Required (Maximum loadedlifting weight, in tons): p~ tnn Shipp~ Lot Number: (Not R~ouitL~l'~(A~¢loned DOL~ bv Rail~; Barga,~ .¯ Pmp~md SNppir~j Mode: Truck__z.__; Pro~ Delivery Oa~e: I~99 OOE,~1~Jgned Oelr~ery Commitment Dace: (Not Reauired'~ (~,sstoned bv DOF_% Rangatll Discharge Dates: Mo/Qay/-Yt Io Mo/Oay/Yr (Ead~st Latest} to (Discharged) tNot R,~utred'~ (Initial) Q.],0 2.7 MetdcT.~nsUtamJm: Nurrd~tmlAssemblies: BWR ]. PWR~ 2.8
m

CERTIFt~N$ P~mhzlet hereb~l~e¢~at~ $~lnlnucl~ir to bedallv~d ~ pur-.uant ~1=O~.wP/Comm~tm~9.t.~.of d~-~,~i~k: t~ ~.ul~b

3.2

~ p ~nf~

3.3 Vice ?,resident Sucle~_rO~erations

4.0

NOTIFICA~ OF DOE APPROVAL 4.1 Appro~¢l by 0OE ~ ~ 4.2 Chief,Logisticsand utility Interface Branch Oa~ 1Z-14-93

o=.

01000079

CPT00] 0014

Case 1:02-cv-01894-EJD

Document 53-5

Filed 07/09/2004

Page 8 of 17

1.0 IDENTIFICATION INFORMATION 1.1 DCS IdentificationNumber:. oo-z2ol.,~3Tz~,oz Information: 1.4 Reactor/FacUlty (a) Name: ]~ ~ ~¢ (b) Address: ~,O~qUg'~. (c) City, State & ZZp Code:

1.2 Cont3ctperson: (a) Naroe: O]~oBs (b) Telephone (includeArea Code): 61~-r'A~T-.~=~37 ]~'¢ : 2~J, 1,3 Contract Number:. DE-C~O~-8~zr~J~3T~ DELIVERY COMMITMENT INFORMATION

2.1 Type CaskRequired (Maximum loaded liffing wgight, ".m tons}: 2k ~ ~m'; (d) (Not Reoulmd)IA~ianed by DOE~ 2.2 Shipping Number:. Lot 2.3 Proposed ShippingMode: Truck X o R~._~; Ba~._...___ ; 2.4 Proposed Delivery Date: 2000 Assigned Dsi~ven/Commitment Date: (~ Reoulred) (Assigned by DOE| 2.5 DOE of Dates: I" 2~ T'r .3,.0_..3,1,_80 . 2.6 Range Discharge MolDay/Yr to Mo/Day/Yr (F_adiest Latest) to tNot Reeulmo3 (Discharged) MetricTons Uraniuro: (InflJa]) 3,8~ .... 2.7 PWR__ Other__ 2.8 NumberofAssemblies: BWR_~ 3.0 CERTIRCATION$

¯

Auff~Ized pu~zz~patum

+ Date

4.0 NOTIFICAllON OF DOEAPPROVAL 4.1 Approved by DOE . ,,A~/4 '-" ~'~"¢'

.... .., .,+

CPT00I 0029

Case 1:02-cv-01894-EJD

Document 53-5

Filed 07/09/2004

Page 9 of 17

U.S. DEPARTMENT OF ENERGY APPEN~XC - DEUVERY C43~ITMENT SCHEDULE

1.0 IDENTIFICATION INFORMATION 1.1 DCS lclentlficat~ Number: 1,4

1.2 Name: Telephone (ir~ude Area Code): 1 3 ConlracI Numbe~:

DELIVERY COMMIT'~NT INFORMATION 2I 2.2 23 2.4 25 2.6 2.7 2.8 TypeCask Requ=ed (Maximum loaded l,f~,ng weight, in tone): Shepp=ng Nurabef: Lot INoI Reoulred) ,'Aesfene¢~ bv DOE~ :( . Rail~: 8arge._.~ PrOPOS6K:I Shipping Mode: Truck Proposed0elive~t Dale: ?00C .. {Not ReeuirW) (As~;|oned by OOE~, DOEAssigned De,very Comm~menl Dale: 06 26 93 Rangeof Oisct~a~e Dates; O.~ 02 _~. (EarliestloLa~st) Mo/Day/Yr to MolDaylYt (D=scharged) {Not Re.~ulredt Meln¢ Tens Urar~m: (Initial) 3.~.~, Number Asseftmhes: of BWR ~ PWR ~ O~her ~

3.0 CERTIFICATIONS

4.0 NOTIFICATI(~N OF D'OE APPROVAL 4 ~ Approve~byOOE ~.~ " Chief, Logistics and Util|Cy IZ-14-93

o,.

01000081

CPT001

0016

Case 1:02-cv-01894-EJD

Document 53-5

Filed 07/09/2004 Page 10 of 17 TO 9-1~16~6~2@~0 P~E.@12

t,1

DCS Identiflc~tio¢~ NutrC~r:

I+4

Reac~oclFa~tiW Information: (a) Name: (c} C~, State

1.2

Cont~

Pe~n:

{b} Tel~o~ (i~de Area ~e): 616/76~-8913 1.3 Ccntra~ Nu~n

OEUVERY 2.1 2,2 23 2.4 2,5 2.6 2.7 2.8

COM~EN~

INFOR~ON t~s}: ~ O0 ton Barg~ ....

Type Ca~ R~i:~ (M~i~m ~ I~ we~, in Shying Lot Nu~er: Tm~ Ra~; Pro~S~ Shi~i~ M~e; ~000 Pro~s~ Deli~w Date: DOE ~sion~ Del~e~ Comm~ Date: ~angeo~ ~i~ha~e Mo ~Earliest Latest) to (Initial) Metdc Tons Uran~m: ~WR Number of Asse~ies:

(NOt R~uir~)

tAssion~

by OO~

(No~Re~'uired~

3.0 CERTIFICATIONS

"~- Pres~n~

Nuclear

OD~r~ions

4.0

NOTIFICA'RON

OF DOE APPROVAL Chief, Logistics and utility

4.1 Approved by OOE

12-I4-93

0100008Z

-

24

cv-root oo17

Case 1:02-cv-01894-EJD

Document 53-5

Filed 07/09/2004

Page 11 of 17

U.S.
r,

DEPARTMENT OF ENERGY

Xplm_.N~X - DELP,q~YCOMM~I3,tEN'T C SCHEDULE

1.0 IDENTIFICATION [NFORMATIC~ ~.~ DCS IdentificaI~ Nu~ OO-~20U-&3T~-0~ ~ 1,4 ReactorlFacdl:~y Information: (a) Name: (b) Address: 2TTUO (c) City, State

',9o~

2.0 2.1 2,2 2.3 2.4 2.5 2.6 2.7 2,8 Type Cask ReqJired (Ma~BJm loaded I~ing weight, in tons): 100 t~Sh~ping Lot Number; : (Not Reou|redl (Aesi~ed by 0OEI P~oposed Shipping Mode: ~. Trac~_jL._; Rail__: Proposed Delivery Date: : (Ng| ~:~ufred~, DOEAssigned Delivery C~=mi~men~ Date: Range of DiVerge Dat~ ~ ~ 0~ ; Mo/Oay/Y~ to MolO~ylYt (E~di~¢ to Latest) : (tnitiaq ~ ~ 00 Mecdc To~ U~n~m: (O~,, .~ B~ ~ PWR ~ ~h~ Numberol Assem~fies:

(Not Reouired)

3.0 CERTIFICA~ONS

4.0 NOTIFICATION OF ]DOE AI~OVAt. 4,1 AggrovedbyOOE : ~ Chief, Log|st|cs and Utility 12-14-93

01000083

25

CPTO010018

Case 1:02-cv-01894-EJD

Document 53-5

Filed 07/09/2004

Page 12 of 17

Department Energy of
Washington, 20585 DC

Ms. Ruth Hardngton
Consumer's Pow~ Company 1945 West Parnell Road Jackson, Michigan 49201 DearMs.Hardngton: The Department of Energy (DOE)has re, dewedand approved the Delivery Commitment Schedules ('DCS) submitted Consumers by Power Company dated October 1995(DCS 16, numb~02-1204-4374-01) for spant nuclear furl f~omPalisades and (DCSnumber 01-12014374-01) for spent nuclear fuel f~omBig RockPoint. Copies of the approved DCSs enclosed are for your records. Tbe propnsed del~vety date is depcadent uponfuc e~dstanc~of an operational repository or an ~nterimstorage fadlity constracted pursuant to law. Additionally, 2 ofoneof theDCSs been immI. has compla~ed incorrectly. As stared the in DCS Instructions, Item 1.2 should be a 12-digit unique identification number, wherethe first two digits correspond to the last two digits of the dslivery year. The correct DCS numbers should DCSnumber submitted as 00-1204--4374-.01 Correct DCS number 02-1204-4374-01

If youhave questions, contact Baptist mystaff'on 634,-4455 any please Doug of (202) F..llssa Turner, Office Civilian of Radioactive Managemeht, (202) W~'te on 586-1710. S~ncerely,

BethA. Tomasoni Contracting O~cer O~ce Placement Admirdstration of and

01001415

CPT00I 0036

Case 1:02-cv-01894-EJD

Document 53-5

Filed 07/09/2004

Page 13 of 17

U.R. DEPARTMENTOF-ENERGY APPENDfX - DEIJYERY O COMlfflrMENT 6CHEI)ULE

1J) IDENTIFICATIONINFORMATION 1.1 Name Pumhase~. of Consuc~r= P~er Co~pan~ 1.2 DC~ Identification Number:. O,t - 120.I. - 4374 1.3 ContactPerson: (a) Name: (b) Telephone:( bib ) .~7-6z~7, DELIVERY COMMITMENT INFORMATION 60 Ton ShLppLng 2.1 Type Cask Required (M~ximum loaded tiffing weight, in tons): 25 Tone Transfer; -Ine pPoposeu uellvery daV.e Is Bame 2.?. Proposed ShiRoing Mode: Truck Z : Ra]l_._j " e'~'~'ndent upon the existence of el 2.3 Proposed Delivery Year. 2001 , or en lntert ~2 31 ~_~operettonal repository 2.4 R~ngeofDischmgeDaIes: 1o uz ~ Mo/D~y/Yr storage fa¢tltty constructed under (EadlasttoL~tast) MoK)ay/Yr to 2.5. Metric Tons Uranium: (Initial) Z. 7 the (~ ~ PWR ~ 2.6 Number Assemblies:BWR of z~_._~_.._ 3.0 CER~FICATIONS 1.4 ContractNumbe~. D~ - C~Ol -

3.1 3~.

-'/ "AuthorizedPurchaser Signature Robert: l~onech Name (Please Typ~or P~nt) Title (Please Type Print) or

TITLE USC makes a crimefor an), person knowingly wglfully ma~e an), agency the UnlteeSta~s 18 1001 It to and to of ¯ any false, Fcfitious, or fraudulent-talementsas to any matterv~thinits Jurisdiction. 4,0 NOTIFICATIONOF DOE ACTION

Gontm~ngOffi~r

Da~e

0~.00~416

27

CPT001 0037

Case 1:02-cv-01894-EJD

Document 53-5

Filed 07/09/2004

Page 14 of 17

APPENDIX C - I~LIVI~Y

~ SCtFJ~LE

1.0 IDENTIFICATION INFORMATION 1.1 N~me Pum.h~a~ of 1,4 Con'~ct Number.

1.2 DCS Ident~fic~on Numbe~. ~9.-L20~ - 4374 = 01 13 Contact Person:

1.5 Reactor/FaUlty Information: (b) /U:k~ro&s: 277B0 ~lue ~ar ~ (o) C~: (d) StY: L (e) Zip Code:"

2.O DELWERY

~MM~

INFOR~ON

2.1 TypeOesk Requtmd (Maximum loadedIIffing weight, In tor~): ~ ~oa. llte propose,~ oe|lvery a=r.e 'Is Trick J_.; Rail; 2.2 pmposedShipplng Mode: ~ dep~ndant upon the existence of an 2002 * 2~ Proposed De,very Yea~. , 2.4 Range Dtsdn~rge of Dales: 10 __.~..__~0 operat'Ion~l r~pos'Itory or an 'Inter -L._L-Zb to MoK)~ymr storlge factltty constructed under (F.~lesttoLa~st) MolDwHr 2.5 M~f~oTor~Uranium: (In~) 21.8 the 2.8 Number of Pe~ambiles: BWR~ PWR $~._~._~ 3.0 CERTIFICATIONS Pmm~uw ~ml~,es~h~(he ~1~! nuo~srfuel ~o1~¢r~Jve~d hm~by p~r~anlIo I~MI~ C~mmllm~al 8¢hld#~il of clomw~o 3,1 3.2 " + ++ ¯ "Authorized Purr Signature ltobez'l: Zl'euaeh Name (Please Type or Print) "-" ' Da~e 3.3 Vice ;Ecesideut= ~qOD T]lJe (Please Type or Pdnt)

TITLE18 U~C 1001m~s a cdme a~y personto knowinglyand 'willfully ma~ ~y ~ncyof the Unites Sta~s ~t for to "'~any fale~, fictitious, or fraudulent statements to =~ym=dter ~= within it= jurisdiction. 4.0 NOTIFICATION DOE ACTION OF

28

"

-

CPT001 0038

Case 1:02-cv-01894-EJD

Document 53-5

Filed 07/09/2004

Page 15 of 17

2g

Case 1:02-cv-01894-EJD

Document 53-5

Filed 07/09/2004

Page 16 of 17

317

Case 1:02-cv-01894-EJD

Document 53-5

Filed 07/09/2004

Page 17 of 17

CERTIFICATE OF FILING I hereby certify that on this 9th day of June 2004, a copy of foregoing "APPENDIX TO DEFENDANT'S MOTION FOR SUMMARY JUDGMENTUPON COUNTS I AND 1~ OF PLAINTIFF'S COMPLAINTAND, 1N THE ALTERNATIVE, FOR PARTIAL SUMMARY JUDGMENT UPONDEFENDANT'SRIGHT TO R~COVERUNPAID FEES" was filed electronically. I understand that notice of this filing will be sent to all parties by operationof the Court's electronic filing system. Parties mayaccess this filing through the Court's system.

s/Harold D. Lester, Jr.