Free Notice (Other) - District Court of Federal Claims - federal


File Size: 951.1 kB
Pages: 14
Date: December 31, 1969
File Format: PDF
State: federal
Category: District
Author: unknown
Word Count: 3,282 Words, 20,059 Characters
Page Size: 622 x 792 pts
URL

https://www.findforms.com/pdf_files/cofc/2133/46-10.pdf

Download Notice (Other) - District Court of Federal Claims ( 951.1 kB)


Preview Notice (Other) - District Court of Federal Claims
Case 1:02-cv-00796-FMA

Document 46-10

Filed 03/18/2005

Page 1 of 14

DD Form 1423-2: Contract Ota Requirements List CONTRACT DATA REQUIREMENTS LIST (2 DataItems)

2 Dam ~ns)
Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. 0003

Bo EXHIBIT E

C. CATEGORY: TM OTHER CONFIGURATIONMGMT F. CONTRACTOR

D. SYSTEM/ITEM AUTOMATED TECHNICAL CONTROL C003

TDP E. CONTRACT/PR NO. N00600-94-C-0389

Engineering Change Proposal

DI-CMAN-B0639A 17 Apt 92 of
7. DD2~0 REQ 10. FREQUENCY

S.O.W.3.4.1
14.

PMW 152
DISTRIBUTION

LT
8. APPCODE

As required

As required
ADDRESSEE

A
16. REMARKS

As required PMW152-21F CNCTC N622

Dralt

2 1

3
1. DATA !TEMNO.

C004

Request for Deviation

DI-CMAN-80640A 17 Apr 92 of
7. DD250 REQ 10. FREQUENCY

S.O.W. 3.4.4 As required

PMW 152

LT
6. APPCODE

As required
11, AS OF DATE

A As Required PMW152-21F CNCTC N622
Dr~ft

Repr 2 1

15.

TOTAL-->

G. PREPARED BY

H. DATE

L. APPROVED BY

3 J. DATE

DD Form 1423-2,
10591183

JUN 90

Previous editions

are obsolete

Page 5 of

36 Pages

Attachment

6

Case 1:02-cv-00796-FMA

Document 46-10

Filed 03/18/2005

Page 2 of 14

DD Form 1423-2: Contract~zta Requirements List CONTRACT DATA REQUIREMENTS LIST (2 Data Items)

(2 Data Ores)
Form ATproved OMB No. 0704-0188

A. CONTRACT LINEITEM NO, 0003 D. SYSTEM/ITEM AUTOMATED TECHNICAL CONTROL
1. DATAITEM NO,

EXHIBIT F

C. CATEGORY: TM OTHER CONFIGURATIONMGMT F. CONTRACTOR

TDP E, CONTRACT/PR NO. NOO600-94*CoO389

C005

Request for Waiver

DI-CMAN-80641Aof 17 Apr 92
?. DD 260 REO

S,O,W. 3.4.4

PMW152

LT
8. APPCODE

As required
11. AS OF DATE

As required As required iPMW 152-21F !CNCTC N622 12 1

A

3
1,DATAITEMNO.

CONTRACT REFERENCE

6. RECIUIPJNG OFFICE

7. DD 260 REQ

14,

DISTRIBUTION

8, APP CODE

ADDRESSEE

Intentionally left blank.

16. TOTAL ..........

>

iG, PREPARED BY

H, DATE

L. APPROVED BY

,,1

J, DATE

DD Form 1423-2, Attachment 6

JUN 90

Previous editions

are obsolete

Page 6 of

36 Pages

Case 1:02-cv-00796-FMA

Document 46-10

Filed 03/18/2005

Page 3 of 14

DD Fortn 1423-2: Contract Ota Requirements List CONTRACT DATA REQUIREMENTS LIST (2 DataItems)

(2 Data Ons)
Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. 0003

B. EXHIBIT G

C, CATEGORY: TM OTHER SOFTWARE CONTRACTOR

D. SYSTEM/ITEM AUTOMATED TECHNICAL CONTROL D001

TDP E. CONTRACWPR NO, N00600-94-C-0389

Doc. of Commercially Available or Priv. Dev.

DI-E-7141 18 Jan 85 of
7. DD250 REQ

S.O.W.3.3.1

PMW 152

LT
8, APPCODE

0 T~me
11. AS OF DATE

180 DAC NONE

COPIED

16. REMARKS

Biock 4: Tailor DI-E-7141 as follows: a. Change block 3.2 all after satisfactory to reed "for its intended use. If approved..." b. Delete block 7.1 in its entirety. ~ co Delete from block 7.2 "as defined in DoD-STD-1467 (AR). Block 12: Government will review and comment NLT 30 DAR.

PMW152-21F CNCTC N622

2 1

15. TOTAL 1. DATA ITEMNO*

3 Manual

D002

Computer System Operator's

Manual

NMS Operator's
6. REQUID;NG OFRCE

DI-MCCR-80018A 29 Feb 88 of

S.O.W, 3,8.1 ONE/R SeeBlock 16

PMW 152

10. FREQUE]~CY b, COPIED 8. APPCODE 11. AD OF DATE 13. DATEOF SUBSEQUENT SUBMISSION

30 DARC
16. REMARKS

D~aft

Dopr

B~^~u12: Six (6) months ADC option exercise. or Block 13: Government will review and comment or approve NLT 3O DAR.

PMW152-21F CNCTCN622.

3 1

4 1

15, TOTAL

G, PREPARED BY

H. DATE

L APPROVED BY

4 5 J. DATE

DD Form 1423-2,
10591183

JUN 90

Previous editions

are obsolete

Page 7 of

36 Pages

Attachment

6

Case 1:02-cv-00796-FMA

Document 46-10

Filed 03/18/2005

Page 4 of 14

DD Form 1423-2: Contract~ta Requirements List (2 DataOms) Form Approved CONTRACT DATA RE(~-01RENIENTS LIST
(2 Data Items) OMBNo. 0704-0188

IA, D.

CONTRACT LINEITEM NO. 0003 SYSTEM~TEM AUTOMATED TECHNICAL CONTROL TITLE DATA OF ITJE~

EXHIBIT H

C. CATEGORY: TM OTHER SOFTWARE F. CONTRACTOR

TDP E. CONTRACT/PR NO. N00600-94-C-0389

1. DATA NO. IT~ D003

Software User's Manual
6. REQUIPJNG OFFICE

DI-MCCR-80019A of 29 Feb 88
10,

S.O.W. 3.8.1
FREQUENCY

PMW 152

AS REQ
I8, APP CODE 11, AS OF DATE

See Block 16 30 DARC

Block 12: Six (6) months ADCor option exercise. Block 13: Government will review and comment or approve 30 DAR

PMW 152-21F CNCTCN622
NLT

3 1

4 1

4
1. DATA IT~ NO.

5

D004

Software Programmer's Manual
6. REQUIRIf~GOFFICE

DI-MCCR-80021A of 29 Feb 88
7. DD 250 REQ

S.O.W. 3.8.1

PMW 152

10. FREQUENCy

LT
8. APPCODE

AS REQ
11. AS OF DATE

See Block 16

A 30 DARC
16. REMARKS

Block 12: Six (6) monthsADC option exercise. Government or will review and comment approve NLT30 DAR. or

~MW 152-21F CNCTCN622

3 1

4 1

4
G. PREPARED BY H. DATE L. APPROVEDBY

5

J. DATE

DD Form 1423-2,
10591183

JUN 90

Previous editions are obsolete

Page 8 of 36 Pages

Attachment 6

Case 1:02-cv-00796-FMA

Document 46-10

Filed 03/18/2005

Page 5 of 14

DD Form 1423-2: Contract~ta Requirements List (2 Data Ores) Form Approved CONTRACTDATA REQUIREMENTSLIST
(2 Data Items) OMB No. 0704-0188

A. CONTRACT LINEITEM NO. 0003

B. EXHIBIT I

C. CATEGORY: TM OTHER SOFTWARE F. CONTRACTOR

D. SYSTEMfiTEM AUTOMATED TECHNICAL CONTROL 1. DATA ITE~,~ NO. D005 OFDATA Software

TDP E. CONTRACT/PR NO. N00600-94-C-0389 Program Maintenance Manual

DI-MCCR-80317 of 12 Feb 87

6, REOU]FJNG OFFICE PMW 152 12. DATE FIRST OF SUBMISSION AS REQ See Block 16 30 DARC

8, APP CODE

A

Block 12: Six (6) monthsADC option exercise. Government or will review and comment approve NLT30 DAR or

PMW 152-21F CNCTCN622

3 1

4 1

4
1. DATA ITET~ D006 SUBTITLE

5

Job Manual
6. REQUIRING OFFICE PMW 152

DI-ILSS-80559 of 7 Apr 88 7. DD260 REQ LT E, APP CODE A

S,O.W. 3.8

0 Time

See Block 16

30 DARC PMW 152-21F Block 12: Due upon completion of installation. Government will and comment or approve NLT 45 DAR. Tailor DI-ILSS-80559 as follows: a. Add block 7.3: This DID is for the identification and procurement of the Technical Manual(s} required for CFE installed as part of this procurement. This information may be contained in one or several binders but shall include all information necessary to perform, but not limited to, the operational, maintenance end fault isolation functions of the system. review

CNCTCN622
EACH SITE

3 1 7

4 1 28

15. TOTAL .......

¯

11

33

G. PREPARED BY

H. DATE

L. APPROVED BY

J. DATE

DD Form 1423-2, Attachment 6

JUN 90

Previous editions are obsolete

Page ~9 of 3--6 Pages

Case 1:02-cv-00796-FMA

Document 46-10

Filed 03/18/2005

Page 6 of 14

DD Fortn 1423-2: ContractOta Requirements List CONTRACT DATA REQUIREMENTS LIST (2 DataItems)

(2 Data Ons)
Form Approved OMBNo. 0704-0188

A. CONTRACT LINE ITEM NO. 0OO3

B. EXHIBIT J

C. CATEGORY: TM F. OTHER LOGISTICS CONTRACTOR

D, SYSTEM/ITEM AUTOMATED TECHNICAL CONTROL E001

TDP E. CONTRACT/PRNO. N006OO-94.C.0389

Integrated Support Plan

DI-ILSS-80395 of 3 Aug 87 8768

S.O.W, 3,4.5

PMW 152

90 DAC
8. APPCODE 11. AS OF DATE

b* COPIES

AN
16. REMARKS

30 DARC

Draft

Government will

review and comment or approve NLT30 DAR.

PMW 152-21F CNCTCN622

3 1

6 1

4
E002

7

Maintenance Plan
5, CONTRACT REFERENCE

DI-ILSS-50816 of 24 May 89

S.O.Wo3,4.5
10. FREQUENCY 12. DATEOF RRST SUBMISSION

PMW 152

ONFJR
8, APPCODE 11. AS OF DATE

150 DAC
COPIES

AN 30 DARC
16, RF.J~ARKS Reg

Government will

review and comment approve NLT30 DAR. or

PMW 152-21F CNCTCN622

3 1

6 1

4 i7
G° PREPAREDBY

H. DATE

l APPROVED BY

J. DATE

DD Form 1423-2, JUN 90
1059/183

Previous editions are obsolete

Page

10 of 36 Pages

Attachment 6

Case 1:02-cv-00796-FMA

Document 46-10

Filed 03/18/2005

Page 7 of 14

OD Form 1423-2: Contrac~_ ta Requirements List (2 DataQms) Form APproved CONTRACTDATA REQUIREMENTSLIST
(2 Data Items)
OMB No. 0704-0188

A, CONTRACT ITEM NO. LINE 0003 D. SYSTEM/ITEM AUTOMATED TECHNICAL CONTROL E003

EXHIBIT

C. CATEGORY: TM OTHERLOGISTICS F. CONTRACTOR

TDP NO. E, CONTRACT/PR N0600-94-C-0389

Proposed Spare Parts List
REQUIRING OFFICE

DI-ILSS-80134A 6 Nov 90 of
7, DD 250 REQ

S,O.W, 3.2.5
10, FREQUENCY

PMW152

LT
8. APPCOOE

0 Time

See Block 16

ADDRESSEE

Bloc~ 12: Six (6) monthsafter contract award or option exercise.

PMW152-21F CNCTC N622

0 1

0 1

1
DATAITET~ NO.

1

EO04

Spare Parts Usage Report
6, REQUIRINGOFFICE

DI-ILSS-80483of 30 Oct 87

S.O.W. 3,2.5 SeeBlock 16

PMW152

Quarterly
8. APP CODE

SeeBlock 16 Block 12: Sabmlt 15 days after end of first quarter of operational status, Block 13: Sabmit 15 days after end of each quarterly reporting period. Block 2: Sabmit separate report for each site. PMW 152-21F CNCTC N622 2 1

G. PREPARED BY

H, DATE

L. APPROVED BY

3 J. DATE

DD Form 1423-2, Attachment 6

JUN 90

Previous editions

are obsolete

Page

I___~1of 3~6Pages

Case 1:02-cv-00796-FMA

Document 46-10

Filed 03/18/2005

Page 8 of 14

DD Form 1423-2: Contract~kta Requiretnents List CONTRACT DATA REQUIREMENTS LIST (2 Data Items)

(2 Data Ons)
Form Approved

OMB 0704-0188 No.

A. CONTRACT ITEM NO. UNE 0003

B. EXHIBIT L

C. CATEGORY: TM OTHER LOGISTICS F. CONTRACTOR
3. SUBTITLE

D. SYSTEM/ITEM AUTOMATED TECHNICAL CONTROL E005 Failure

TDP E. CONTRACT/PR NO. N0600-94-C-0389

Summaryand Analysis Report

DI-RELJ-80255 17 Oct 86 8768 of

S,O.W.3.4,5
FREQUE]~C¥ DATE OF FIRST SUBMISSION

PMW152

Quarterly
8, APP CODE 11. AS OF DA'~E

SeeBlock 16 SeeBlock 16

16,

REMARKS

Block 12: Submit 10 days after the first full quarter system operation. Block 13: Submit the 10th of every quarter. Block 2: Submit separate report for each site.

PMW152-21F CNCTC N622

3 1

8, APPCODE

11, AS OF DATE

13. DATE QFSUESEQUENT SUBMISSION

REMARKS

Intentionally left blan~.

G. PREPARED BY

H, DATE

L. APPROVED BY

J, DATE

DD Form 1423-2, Attachment 6

JUN 90

Previous editions

are obsolete

Page

12 of 36 Pages

Case 1:02-cv-00796-FMA

Document 46-10

Filed 03/18/2005

Page 9 of 14

DD Fortn 1423-2: ContractOta Requirelnents List CONTRACT DATA REQUIREMENTS LIST (2 Data Items)

(2 Data Ons)
Form Approved OMB No. 0704-0188

~.CONTRACT~NEITEM NO. 0~3

B. EXHIBIT M

CATEGORY: TM OTHER TRAINING F. CONTRACTOR

D. SYSTEM,qTEM AUTOMATED TECHNICAL CONTROL

TDP E. CONTRACT/PR NO, NO0600-94.C-0389 Training Plan

REQUIRINGOFRCE

DI-|LSS-80143 7 Apt86 8768 of

S.O.W, 3.7.1 - 3,7.5
FREQUENCY

PMW 152

ONE/R
8, APPCODE 11, AS OF DATE

4 Mos ADC 30 DARC

COPIES

AN
16. REMARKS

Block 13: Government will 30 DAR.

review and comment or approve NLT

PMW152-21F CNCTC N622

3 1

3 1

15. TOTAL

4

4

Lesson Plan

DI-ILSS-81095 5 Dec91 of

S.OoW. 3.7.1 - 3.7,5
FREQUENCY

PMW 152 See Block 16

ONF-JR
8. APPCODE 11. AS OF DATE

13. DATE OF SUBSEQUENT

AN See Block 16
16, REMARKS ! Reg

Block 12: Submit 90 days prior to start of first scheduled course. Block 13: Government will review and comment or approve NLT 30 DAR. Revisions due NLT 30 DARC.

PMW152-21F CNCTC N622

3 1

3 1

G. PREPARED BY

H. DATE

L. APPROVED BY

4 4 J. DATE

DD Form 1423-2, Attachment 6

JUN 90

Previous

editions

are obsolete

Page. 13 of 36 Pages

Case 1:02-cv-00796-FMA

Document 46-10

Filed 03/18/2005

Page 10 of 14

DDForm 1423-2: Contract Ota Requb'ements List (2 Data l~s) CONTRACT DATA REQOIREMENTS LIST !UIREMENT~ Form Approved OMB No. 0704-0188 (2 DataItems)

A. CONTRACT ITEM NO. UNE 0903

B. EXHIBIT N

C. CATEGORY: TM iF. OTHER TRAINING CONTRACTOR

D. SYSTEM/ITEM AUTOMATED TECHNICAL CONTROL

TDP E. CONTRACWPR NO. N00600-94-C0389 Trainee Guide
CONTRACT REFERENCE

DI-ILSS-81100 5 Dec 90 8768 of
7, DD250 REQ

S.O,W, 3,7.1 - 3.7,5
10. FREQUEnCy 12. DATEOF RRSTSUBMISSION

PMW 152

LT
8. APPCODE

ONEUR
11. AS OF DATE

See Block 16 30 DARC PMW152-21F CNCTC N622
Drml Reg

AN

Ropr

Block 12: Submit 90 days prior to start of first scheduled course. Block 13: Government will review and comment or approve NLT 30 DAR, Revisions due NLT 30 DARC. *Block 14: Provide one copy per student plus two master copies at each site,

3 1

3 1

4 On-the-Job Training Handbook

4

DI-ILSS-81101 5 Dec90 of

S,O,W. 3,7.2 - 3.7.3
10. FREQUENCY

PMW 152 See Block 16
COPIES

ONFJR
8. APPCODE 1. AS OF DATE

A

DATE OF SUBSEQUENT SUBMISSION

30 DARC Government will review and comment or approve NLT 30 DAR. Block 12: Six (6) months ADCor option exercise. *Block 14: Provide one copy per student plus two master copies at each site, PMW152-21F CNCTC N622 3 1 3 1

Repr

15. TOTAL

G. PREPARED BY

H. DATE

L. APPROVED BY

4 4 DATE

DD Form 1423-2,
10591183

JUN 90

Previous editions

are obsolete

Page

14 of 36 Pages

Attachment

6

Case 1:02-cv-00796-FMA

Document 46-10

Filed 03/18/2005

Page 11 of 14

Requirements List (2 Data DD Form 1423-2: Contract CONTRACT DATA REQUIREMENTS LIST Form Approved (2 DataItems) OMBNo. 0704-0188

A. CONTRACTUNE ITEM NO. 0003

B. EXHIBIT O

C. CATEGORY: TM OTHER TESTING F. CONTRACTOR

D. SYSTEM/iTEM AUTOMATED TECHNICAL CONTROL

TDP E. CONTRACT/PR NO. N00600-94-C-O389

G00t

Cutover Plan
REQUIRING OFFICE

DI-MGMT-80355of 7 May 87

PMW 152

LT
0. APPCODE

EEODIRED
See Block 16
! 11. ASOF DATE 13. DATE OF SUBSEQUENT

30 DARC
REMARKS

Block 12: Draft due 4 monthsafter contract. Government will review and comment within 30 days. Tailor DI-MGMT-80355 as follows: a. Deleteblock 10 in its entirety. b. Addthe following: 10.1 TheCutoverPlan will take into acccount facets of the all program will consist of the following parts: and a. Concept b. Schedule c. Management d. Site cutover operation sheets e. Removal replaced equipmentand materials of G001 Cutover Plan (cont.)
5, CONTRACT REFERENCE

PMW 152-21F CNCTCN622

4 1

4 1

15. 0, SUB~TLE

TOTAL-->

5

5

7, DD250 REQ

14.

DISTRIBUTION b, COFIES

8. APPCODE

11, AS OF DATE

16. EMARKS R (Tailoring of DI-MGMT-80355 conL) f. Government participation requirements Block 2: Submitseparateplan for eachsite. 10.2 Part 1 Concepts: This part shall contain details of the cutover plan concept. It shall include information explaining the cutover impact on other parts of the systemand impact of subsequent cutover in other parts of the systemon this particular site. Theconcept should recognize a phasedsequence the cutover expressing the contractor's intent and of general methodof maintaining the system through a gradual series of transitions from the existing to the final configuration. 10.3 .Part II Schedule: This part shall identify anddescribelink andcircuit cutover schedule. This scheduleshall be divided into four general "periods": ~. PREPARED ........... BY H. DATE L. APPROVED BY

15,

TOTAL-->

J. DATE

DD Form 1423-2, JUN 90
' 10591183

Previous editions are obsolete

Page

15 of 36 Pages

Attachment 6

Case 1:02-cv-00796-FMA

Document 46-10

Filed 03/18/2005

Page 12 of 14

DD Form 1423-2: Contract J~a Requirements List ) CONTRACT DATA REQUIREMENTS LIST (2 Data Items)

(2 Data IOs Form Approved OMB 0704-0188 No.

A. CONTRACT LINE ITEM NO. 0003

B. EXHIBIT P

C. CATEGORY: TM OTHER TESTING F. CONTRACTOR

D. SYSTEM/ITEM AUTOMATED TECHNICAL CONTROL G001

TDP E. CONTRACT/PR NO. N00500-94-C-0389

Cutover Plan (cont.)

¯ APP CODE

11. AS OF DATE

16. REMARKS

~ailoring of DI-MG~-80355) (1) Contractor installation phase (2) Precutover phase which begins upon completion of the contractors installation phase and is completed when cutover begins (major activity during this phase shall be implementation testing), (3) Cutover phase during which the new system is placed into operational service, and (4) Postcutover phase which begins at the completion and continues until normal operations and maintenance are underway. 10.4 Part III Management: This part shall identify and describe the management structure necessary for the orderly implementation of the cutover plan. It shall include military and contractor representatives: it shall provide for both area cutover management; shall describe the chain it G001 CutoverPlan (cont.)
5, CONTRACT REFERENCE

15.

TOTAL-->

3. SUB~TLE

FREQUENCY

8. APPCODE

1% AS OF DATE

13. DATEOF SUBSEQUENT SUBMISSION

1~. RE~AEKS (Tailoring of DI-MGMT-80355) of command and the authority and responsibility of each command element. 10.5 Part IV Site Cutover Operation Sheets (COS): This part shall prepared as separate documents. The COSshall identify and schedule the cutover activities required just prior to cutover. The entries on them shall define all physical work to be performed at all locations. Work items shall be time-phased and the contractor and Government activity responsible for each item shall be shown. (1) Each sheet shall represent a work operation at a location where cutover activities must be performed. (2) The site COSshall be arranged into books on a per-site basis. (3) The plan shall include audio frequency and dc (TTY) circuit be cutover at each site. (4) Approval of and changes to this part of the H. DATE L APPROVED BY G. PREPARED BY

J. DATE

DD Form 1423-2,
10591183

JUN 90

Previous editions

are obsolete

Page

16 of 36 Pages

Attachment

6

Case 1:02-cv-00796-FMA

Document 46-10

Filed 03/18/2005

Page 13 of 14

DD Form 1423-2: Contract l~a Requirements List ) CONTRACT DATA REQUIREMENTS LIST (2 Data Items)

(2 Data los Form Approved OMB 0704-0188 No.

A. CONTRACT ITEM NO. LINE 0003 D. SYSTEM/iTEM AUTOMATED TECHNICAL CONTROL G001

B. EXHIBIT Q

C. CATEGORY:

TM OTHER TESTING TDP F. CONTRACTOR E. CONTRACT/PR NO. N00600-94-C-0389

Cutover Plan (cont.)
5. CONTRACT REFERENCE

I. DD250 REQ

10. FREQUENCY

14,

DISTRIBUTION

6. APPCODE

11. AS OF DATE

(Tailoring of DI-MGMT-80355 continued) cutover plan shall be coordinated with local military personnel at each site. 10.6 Part V Removal of Replaced Equipment and Materials: This part shall be included in the cutover plan only for those sites at which the contractor proposes to remove existing equipment. As such, this segment of the plan shall clearly specify the specific items of equipment to be removed, existing location, reasons for removal, and equipment disposition. 10.7 Part VII GovernmentParticipation: The cutover plan shall clearly delineate the extent and schedule of the Governmentparticipation required during the cutover phase. The cutover of items for which the Governmenthas responsibility must be displayed in detail and the schedule for each activity specified. G002 System Test andVerification Plan
E. CONTRACT REFERENCE

DI-T-5422 21 Jul 77 of
10. FREQUENCY

S.O.W. 3.9.1
12~ DATEOF RRST SUBMISSION

PMW 152

ONE/R
6. APPCODE 11. AS OF DATE

SeeBlock 16
b. COPIES

AN 30 DARC
16. REMARKS

Block 4: Delete DID para 10.13 Block 12: Submit NLT 180 days prior to scheduled start. Government will review and comment or approve NLT 30 DAR. B!~cE 2: Submit separate plan for each site.

PMW 152-21F CNCTC N622

3 1

G. PREPARED BY

H. DATE

L. APPROVED BY

4 4 J. DATE

DD Form 1423-2, Attachment 6

JUN 90

Previous editions

are obsolete

Page

17 of 36 Pages

Case 1:02-cv-00796-FMA

Document 46-10

Filed 03/18/2005

Page 14 of 14

DD Form 1423-2: Contract J~a Requirements List CONTRACT DATA REQUIREMENTS LIST (2 DataItems)

(2 Data l~s)
Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO, 00O3

B. EXHIBIT R

c. CATEGORY: OTHER TESTING CONTRACTOR

D, SYSTEMu3TEM AUTOMATED TECHNICAL CONTROL G003

TDP E. CONTRACTIPR NO. N00600-93-R-2790

Test Procedure
5. CONTRACT REFERE~NCE

Design Verification

Test Procedures

REQUIRING O~CE

DI-NDTI-80~3of 1 Jun 88
7. DD250 REQ

S.O.W. 3.9.1.2 ONE/R See Block 16

PMW152

LT
8. APPCODE

b. COPIES

AN

See B~ck 16 PMW152-21F CNCTC N622

Draft

Block 12: Submit NLT 150 days prior to scheduled start of testing. Bock 13: Government will review and comment or approve NLT 30 DAR. Revisions due NLT 30 DARC. 3lock 2: Submit separate procedures for each site.

15. TOTAL 1. DATA ITEMNO.

2

G004

Test

Repo~
6, REQUIRING O~SE

DI.NDT]-80604 1 Jun 88 of
10. FREQU~CY

S.O.W,3.9 30 DATC

PMW152

As required
8. APPCODE 11. AS OF DATE

b. COPIES 13. DATEOF SUBSEQUENT SUBMISSION Draft

Block 10: Submit a separate report for each test conducted. Block 2: Submit a separate report for each site's tests.

PMW152-21F CNCTC N622

1 1

15.

TOTAL-->

G. PREPARED BY

H. DATE

L. APPROVED BY

2 J. DATE

DD Form 1423-2, A~achment 6

JUN 90

Previous editions

are obsolete

Page

18 of 36 Pages