DD Form 1423-2: Contract Ota Requirements List CONTRACT DATA REQUIREMENTS LIST (2 Data Items)
(2 Data @ns)
Form Approved OMBNo. 0704-0188
A. CONTRACT UNEITEM NO. 0006, ~09,0012,0015 D. SYSTEM~TEM AUTOMATED TECHNICAL CONTROL
DATA~TEM NO,
EXHIBIT AW
C. CATEGORY: TM OTHER TESTING F. CONTRACTOR
TDP E. CONTRACT/PR NO. N00600-94-C-0389
GO01
Cutover Plan
DI-MGMT-80355 May87 of 7
7, DD250 REQ
S.O.W. 3,9.1
10, FREQ UE~CY
PMW 152
LT
6. APPCODE 11, AS OF DATE
See Block 16 30 DARC
b. COPIES
A
REMARKS
Block 12: Draft due 4 monthsafter contract. Government will review and comment within 30 days. Tailor DI-MGMT-80355 as follows: a. Deleteblock 10 in its entirety. b. Addthe following: 10.1 TheCutoverPlan will take into acccountall facets of the program will consist of the following parts: and a. Concept b. Schedule c. Management d. Site cutover operation sheets e. Removal replaced equipmentand materials of
DATA ITF_MNO,
PMW 152-21F CNCTCN622
4 1
4 1
15. TOTAL
5
5
GO01
Cutover Plan (cont.)
5. CONTRACT REFERENCE
7. DD250 REQ
12. DATE FIRSTSUBMISSION OF
8. APPCODE
1% AS OF DATE
13. DATEOF SUBSEQUENT SUBMISSION Draft Reg
Repr
R (Tailoring of DI-MGMT-B0355 conL) 16. EMARKS f. Government participation requirements Block 2: Submitseparateplan for each site. 10.2 Part 1 Concepts: This part shall contain details of the cutover plan concept. It shall include information explaining the cutover impact on other parts of the systemand impact of subsequent cutover in other parts of the systemon this particular site. The conceptshould recognize a phasedsequence the cutover expressing the contractor's intent and of general methodof maintaining the system through a gradual series of transitions from the existing to the final configuration. 10.3 Part II Schedule: This part shall identify anddescribelink and circuit cutover schedule. This scheduleshall be divided into four general "periods":
G. PREPAREDBY H. DATE L. APPROVEDBY J. DATE
DD Form 1423-2, JUN 90 Attachment 6
Previous editions are obsolete
Page 3~3of36
Pages
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 2 of 23
DD Form 1423-2: Contract Ota Requirements List CONTRACT DATA REQUIREMENTS LIST (2 DataItems)
(2 Data l~zs)
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. 0006,0009,0012, 0015 D. SYSTEM/ITEM AUTOMATED TECHNICAL CONTROL
1. DATAITEMNO.
EXHIBIT AX
C. CATEGORY: TM OTHER TESTING F. CONTRACTOR
TDP E. CONTRACT/PR NO. N00600-94-C-0389
G00t
4, AUTHORITY (D~I~ AcqulstIo~ Document NO.)
Cutover (cont,) Plan
5. CON3*RACT REFERENCE REQUIRINGOFRCE
7. DD250 REQ b. COPIES 8. APPCODE 1%AS OF DATE
16. REMARKS
(Tailoring of DI-MGMT-80355) (1) Contractor installation phase (2) Precutover phase whichbeginsuponcompletion the contractors of installation phase is completed cutoverbegins(major and when activity duringthis phase shall beimplementation testing), (3) Cutover phase during whichthe newsystem placedinto operational is service, and(4) Postcutover phase whichbeginsat the completion and continuesuntil normaloperationsandmaintenance underway. are 10.4Part lit Management: part shall identify anddescribe This the management structure necessary the orderly implementation the for of cutoverplan. It shall includemilitary andcontractor representatives: it shall providefor both areacutovermanagement;shall describe chain it the
1. DATAI~ NO*
G001
CutoverPlan(cont.)
5. CONTRACT REFERENCE
8. APPCODE
11. AS OF DATE Draft Reg ReW
REMARKS (Tailoring of DI-MGMT-80355) of command the authority andresponsibility of eachcommand and element. 10.5 Part IV Site Cutover Operation Sheets (COS): This part shall prepared separatedocuments. COS as The shall identify and schedule the cutoveractivities required just prior to cutover.The entries on them shall defineall physicalwork be performed all locations. to at Work items shall be time-phased the contractor and Government and activity responsible each for item shall be shown, Each (1) sheetshall represent workoperation a location where a at cutoveractivities must be performed. Thesite COS (2) shall be arranged into books a per-site on basis. (3) Theplanshall includeaudiofrequency dc ('FLY)circuit and cutoverat eachsite. (4) Approval andchanges this part of the of to
G. PREPARED BY H. DATE L. APPROVED BY
IS.
TOTAL-->
J. DATE
DDForm 1423-2, JUN 90
1059/183
Previous editions are obsolete
Page 34 of 36 Pages
Attachment 6
Case 1:02-cv-00796-FMA Document List 2 Data 03/18/2005 Page 3 of 23 46-12 Filed ORS) DD Form 1423-2: Contract Qta Requirements CONTRACT DATA REQUIREMENTS LIST Form Approved OMB 0704-0188 No. u~ o (2 Data Items)
A. CONTACTUNE I~M NO.
BEEXHt~IT
C. CA~GORY: ~ OTHER ~S~NG t F. CON~ACTOR J
I I TDP D. SYSTE~TEM ' [ E. CON~ACT/PR NO, N0~-94.~0389 AUTOMA~D TECHNICAL CON~OL ~ G001 Cutover Plan (cuRt,)
~ailoring of DI-MG~-~035~ continued) ~ cutover plan shall be coordinated with local mil~aw personnel at each site. 10.6 Pa~ V Removal of Replaced Equipment and Materials: This pa~ shall ~ be included in the cutover plan only for those sites at which the contractor proposes to remove existing ~uipment. As such, this segment of the plan shall clearly spec~y the specific ~emsof equipment to be removed, [ existing location, reasons for removal, and equipment dispos~ion. ~ 10.7 Pall VII GovernmentPa~icipation: The cutover plan shall clearly ] del[ne~e the e~ent and schedule of the Government pa~icipation required [ during the cutover phase. The cutover of items for which the Government has responsibil~y must be display~ in detail and the [ schedule for each activi~ spec~ied. GO02 System Test and Vefifica~on Plan
~ ' '
"
LT
REQUIRED
ON~R
See Block 16
~s. ~A~KS
Block 4: Delete DID para 10.13 Block 12: Submit NLT 180 days prior to schedul~ stad. Government will review and comment or approve NLT 30 DAR. Block 2: Submit separate plan for ~ch site.
PMW 152-21F
C~CTC N622
DDForm 1423-2, JUN 90
1059/183
Previous editions are obsolete
Page 35 of 36 Pages
Attachment 6
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 4 of 23
DDForm 1423-2: Contract~ta Requirements List (2 DataOms)... Form Approved CONTRACT DATA REQUIREMENTS LIST OMB 0704-0188 No. (2 Data Items)
A, CONTRACT LINE ITEM NO. OOO6,OO09,OO12. O015
B, EXHIBIT AZ
C. CATEGORY: TM OTHERTESTING F. CONTRACTOR
SYSTEM/ITEM AUTOMATED TECHNICAL CONTROL G003.
TDP E. CONTRACT/PR NO. N00600-94-C-0389 Test Procedure
Design Verification
Test PrC=cedures
DI-NDTI-80603 I Jun 88 of
S.O.W, 3.9.1,2 SeeBlock 16
PMW 152
g. APP CODE
11- A~ OF DATE
AN
SeeBlock 16 PMW 152-21F CNCTC N622
Block 12: Submit NLT 150 days prior to scheduled start of testing. Block 13: Government will review and comment or approve NLT 30 DAR. Revisions due NLT 30 DARC, Block 2: Submit separate procedures for each site.
2 G004 Test Report
DI-NDTI-80604 1 Jun 88 of
lO. FREQUENCY As required
8. APP CODE 11.AS OF DATE 13.
PMW 152
14. DISTRIBUTION
30 DATC
DATEOFSOBSEGUEN~
Block 10: Submit a separate report for each test conducted. Bloc~ 2: Submit a separate report for each site's tests.
PMW 152-21F CNCTC N622
G, PREPARED BY
DATE
L. APPROVED BY
2 J. DATE
DD Form 1423-2, Attachment 6
JUN 90
Previous editions
are obsolete
Page 3___6 of 3~6 Pages
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 5 of 23
Contract Attachments 9(a) through
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 6 of 23
Attach (ga)
Case 1:02-cv-00796-FMA
NAVAL REGIONAL
Document 46-12
CENTER
Filed 03/18/2005
Page 7 of 23
N00600-94-C-0389
CONTRACTING
APPENDIX Naval 1.0 Telecommunications Naval Center
A Hampton Roads, Virginia Roads,
Telecommunications
Center
(NTCC)
Hampton
Virqinia NTCC operating those Hampton Roads is responsible necessary for for managing and
facilities service and area.
to provide CINCLANTFLT, located Roads is in the
telecommunications CINCWESTLANT, CINCLANTFLT responsible mission and
USCINCLANT, commands Hampton maintenance commands
SACLANT, compound for in all
other NTCC
also of the for its
electronic
in support located NTCC is in
support
of various area.
CINCLANTFLT operation (RTSS). I.i
compound and
Additionally, of the Red
responsible
maintenance
Telephone
Switching
System
NTTC NTCC
Hampton Hampton
Roads Roads and is
Buildinq is located
Location. in Building A-I-I. Description. include by ATC. the NH-95 on the
CINCLANTFLT 1.2
compound NTCC NTCC Hampton Hampton
depicted Buildinq
in
Figure
Roads Roads areas
Function
communication which will
spaces
following
functional First i. 2. 3. 4. 5. Floor
be affected
Local Message
Digital Center
Message
Exchange
(LDMX)
Technical
Control
Facility
(TCF) (CSE) (AUTOSEVCOM)
Communications Automated Secure
Security Voice
Equipment
Communications
ATTACHMENT
9
A-I
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 8 of 23
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 9 of 23
NAVAL
REGIONAL
CONTRACTING
CENTER
N00600-94-C-0389
1.2.1
Local The
Diqital LDMX
Messaqe of
Exchanqe a dual
(LDMX). UNIVAC 90/60 computer and
consists automated and (RIXT), Message
system routing Exchange Personal Hampton the
and of
provides messages
communications interface for
processing Remote Circuit
AUTODIN
Information (ECC), NTCC of their
Terminal Computer Roads is
Electronic Terminal for the in
Courier (PCMT),
subscribers. and
responsible systems
management the The Message
control
UNIVAC
90/60 and
installed equipment. area Area. is
Center,
processors arrangement 1.2.2
peripheral LDMX Center
electronic A-2-1.
equipment
of the Messaqe The
shown
in Figure
Message outgoing
Center message
receives, traffic The
processes for NTCC
and Hampton Center
reproduces Roads utilizes (OCRE) and and
incoming all the
and
over-the-counter LDMX and Optical with the
subscribers. Character Naval
Message
Recognition Message
Equipment
conjunction Distribution maintains message Source. in Figure 1.2.3
Automated
Reproduction Message
System
(NAMRADS). message and
Moreover, operates a General of the
the
Center Section for
mandated correction The
files, as
a Service Message
serves
Distribution Center is shown
electronic
equipment
Message
A-2-2. Technical The TCF Control contains Facility the (TCF). for the technical
equipment
coordination, service
supervision, and status (DCS)
quality
control, of The all
communications tactical exercises and Defense
restoral
reporting circuits.
Communication
System
TCF
technical
ATTACHMENT
9
A-3
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 10 of 23
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 11 of 23
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 12 of 23
NAVAL
REGIONAL
CONTRACTING
CENTER
N00600-94-C-0389
direction links, the TCF
and
supervision circuits
over and
audio
and
digital
transmission appearing liaison Agency with in
channels, and
interfacing TCF also
equipment maintains Systems TCFs,
connecting NORFOLK,
users.
NAVCOMMDET reporting elements The
Defense as liaison
Information with
(DISA)
as and
well users
adjacent
maintenance service. A-2-3.
to ensure of
effective the TCF
communications is shown in
electronic
arrangement
Figure
1.2.4
Communications The CSE area
Security contains to
Equipment all of the is the
(CSE). data encryption Roads TCF
devices function. 1.2.5
and
multiplexers electronic Secure
support
NTCC shown
Hampton in
The
arrangement Voice area
Figure
A-2-4.
Automated The
Communications
(AUTOSEVOCOM). for the Radio Digital provides voice
AUTOSEVOCOM
contains (RTSS), and
equipments Advanced
Telephone Voice
Switching
Subsystem
Narrowband AUTOSEVOCOM for
Terminal
(ANDVT), and
VINSON, operator in
STU-II.
systematic narrow and all band
routing
assisted support of
service
secure
communications to the
CINCLANT/CINCLANTFLT, area. The area is shown
subscribers equipment A-2-5. Hiqh The
NORFOLK of
operational the
electronic in Figure 1.2.6
arrangement
AUTOSEVOCOM
Altitude HEMP
Electromaqnetic consists of
Pulse digital
(HEMP)
Facility.
Facility Low in
communications equipment Electronic A-2-6. and
subsystem critical arrangement 1.3
equipment, crypto of units the
Speed
Multiplex of the
(LSTDM) TCF. The
support
HEMP
Facility
is shown
in Figure
Miscellaneous
Information.
ATTACHMENT
9
A-6
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 13 of 23
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 14 of 23
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 15 of 23
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 16 of 23
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 17 of 23
NAVAL
REGIONAL
CONTRACTING
CENTER
N00600-94-C-0389
(a)
The
following
additional
information
is
provided: (i) Typical Division proposed depicted (2) Typical site connectivity, (TDM) signal A-3-1 LDMX, Systems diagrams - A-3-4. of the in power Figures ground Time and are
Multiplex IDNX-90
in Figures diagrams and
charts are
distribution A-3-5 will site (3)
system
depicted of
- A-3-11. be made
Diagrams
station the
available as required.
during
detailed
survey
Equipment
rack
elevations
will
be provided
as required.
ATTACHMENT
9
A-II
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 18 of 23
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 19 of 23
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 20 of 23
=i
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 21 of 23
0
~-~o
;
o~
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 22 of 23
Case 1:02-cv-00796-FMA
Document 46-12
Filed 03/18/2005
Page 23 of 23