Free Objection to Exhibit List - District Court of Federal Claims - federal


File Size: 347.9 kB
Pages: 118
Date: September 10, 2008
File Format: PDF
State: federal
Category: District
Author: unknown
Word Count: 10,091 Words, 65,537 Characters
Page Size: Letter (8 1/2" x 11")
URL

https://www.findforms.com/pdf_files/cofc/592/338.pdf

Download Objection to Exhibit List - District Court of Federal Claims ( 347.9 kB)


Preview Objection to Exhibit List - District Court of Federal Claims
Case 1:00-cv-00697-JFM

Document 338

Filed 08/31/2007

Page 1 of 3

IN THE UNITED STATES COURT OF FEDERAL CLAIMS WISCONSIN ELECTRIC POWER COMPANY, Plaintiff, v. THE UNITED STATES, Defendant. ) ) ) ) ) ) ) ) ) )

No. 00-697C (Senior Judge Merow)

DEFENDANT'S REVISED OBJECTIONS TO PLAINTIFF'S EXHIBITS Pursuant to the Court's direction at the August 29, 2007 pretrial conference, defendant, the United States, asserts the following revised objections to the exhibits designated by plaintiff, Wisconsin Electric Power Company ("WEPCO"), in the above captioned case. Our list of objections includes the Government's objections to WEPCO's June 13, 2007 revised trial exhibits and updates to our original set of objections filed in response to WEPCO's January 26, 2007 exhibit list. Defendant reserves all objections to exhibits that WEPCO may add to its list and will raise those objections, if any, at the time the exhibits are identified by plaintiff and placed upon its exhibit list. Finally, defendant reserves all objections to WEPCO's exhibits to the extent that any exhibit is offered at trial for reasons other than those clearly discernable from a review of the document itself. Respectfully submitted, PETER D. KEISLER Assistant Attorney General JEANNE E. DAVIDSON Director

Case 1:00-cv-00697-JFM

Document 338

Filed 08/31/2007

Page 2 of 3

OF COUNSEL: JANE K. TAYLOR Office of General Counsel U.S. Department of Energy 1000 Independence Ave., S.W. Washington, D.C. 20585 ALAN J. LO RE Senior Trial Counsel STEPHEN FINN SONIA M. ORFIELD RUSSELL A. SHULTIS Trial Attorneys Commercial Litigation Branch Civil Division Department of Justice August 31, 2007

s/ Harold D. Lester, Jr. HAROLD D. LESTER, JR. Assistant Director s/ Sharon A. Snyder by Russell A. Shultis SHARON A. SNYDER Trial Attorney Commercial Litigation Branch Civil Division Department of Justice Attn: Classification Unit 8th Floor 1100 L Street, N.W. Washington, D.C. 20530 Phone: (202) 305-9640 Fax: (202) 307-2503 Attorneys for Defendant

-2-

Case 1:00-cv-00697-JFM

Document 338

Filed 08/31/2007

Page 3 of 3

CERTIFICATE OF FILING I hereby certify under penalty of perjury that on August 31, 2007, a copy of this "DEFENDANT'S REVISED OBJECTIONS TO PLAINTIFFS EXHIBITS" was filed electronically. I understand that notice of this filing will be sent to all parties by operation of the Court's electronic filing system. Parties may access this filing through the Court's system.

s/ Russell A. Shultis

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 1 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0001 Wisconsin Electric Power Company Facility Operating License. Docket No. 50-266: Point Beach Nuclear Plant Unit No. 1 0002 Wisconsin Electric Power Company Facility Operating License. Docket No. 50-301: Point Beach Nuclear Plant Unit No. 2 Bates - Begin KRGWE002102 Bates - End KRGWE002106 Government Objections No Objection

Doc Date 10/5/1970

KRGWE002107

KRGWE002111

No Objection

3/8/1973

0003

Statement of President Jimmy Carter on 00081 Nuclear Power Policy (13 Weekly WE Opp to MSJ Comp. Pres. Doc. 502) Appx Bechtel Power Corp. report re: PBNP Units 1 and 2, Evaluation of the Spent Fuel Pool to Accommodate the Proposed 2360 KIPS Load, Revision 1 WISC00064409

00086 No Objection WE Opp to MSJ Appx WISC00064415 No Objection

4/7/1977

0004

1/16/1978

0005

Letter from McNeer (WE) to Case WISC00025249 (NRC) requesting modification to facility operating license Letter from Grimes (NRC) to All Power Reactor Licensees attaching "Review and Acceptance of Spent Fuel Pool Storage and Handling Applications " Point Beach north pool spent fuel racks calculated weights and pool loadings, revised 10/12/78 Wisconsin Electric Power Company Point Beach Nuclear Plant Unit Nos. 1 and 2 Spent Fuel Storage Expansion Nuclear Material Transaction Report WISC00128740

WISC00025362

No Objection

3/21/1978

0006

WISC00128763

No Objection

4/14/1978

0007

WISC00050814

WISC00050821

No Objection

8/7/1978

0008

WISC00025246

WISC00025362

No Objection

9/29/1978

0009

WISC00059905

WISC00059913

Authentication, Foundation, Relevance

1978; 1985

Confidential Work Product. Do Not Reproduce.

Page 1 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 2 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0010 Letter from Grimes (NRC) to All Power Reactor Licensees attaching modifications to "Review and Acceptance of Spent Fuel Pool Storage and Handling Applications" 0011 Bates - Begin WISC00128764 Bates - End WISC00128767 Government Objections No Objection

Doc Date 1/18/1979

Letter from Schwencer (NRC) to WISC00040332 Burstein (WE) transmitting amendments no. 35 and 41 to Facility Operating License Spent Fuel Storage Requirements - The Y-PA-100827 Need for Away-From-Reactor Storage (DOE/NE-0002) Kurtz (WE) memo to Reed re: WISC00051685 comments to SMP #345, Phase 8 North Pool Rack Installation Letter from Linder (Wachter Associates) WISC00051676 to Dill (WE) re: Point Beach North Pool Installation Report & Notes Spent Fuel Storage - Facts Booklet (DOE/NE - 0005) PA-164418

WISC00040399

No Objection

4/4/1979

0012

Y-PA-100842

No Objection

1/1/1980

0013

WISC00051692

No Objection

1/2/1980

0014

WISC00051684

No Objection

1/7/1980

0015 0016

PA-164483 PA202906

No Objection No Objection

4/1/1980 5/1/1980

DOE, Final Environmental Impact PA202506 Statement, U.S. Spent Fuel Policy (May, 1980) Spent Fuel Storage Requirements - An Update of DOE/NE-0002 (DOE/SR-0007) Memo from Shimon (WE) to Lawler (WE) re: Data For FERC Rate Case ER-81-517 H.R. Rep. No. 97-491 (1982) PNL1684293

0017

PNL1684348

No Objection

03/01/1981

0018

KRGWE002113

KRGWE002114

No Objection

9/1/1981

0019

00087 WE Opp to MSJ Appx

00127 No Objection WE Opp to MSJ Appx

1982

Confidential Work Product. Do Not Reproduce.

Page 2 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 3 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0020 H.R. Rep. No. 97-785 (1982) Bates - Begin 00135 WE Opp to MSJ Appx PNL-168-4349 Bates - End Government Objections 00186 No Objection WE Opp to MSJ Appx PNL-168-4436 No Objection

Doc Date 1982

0021

Spent Fuel Storage Requirements - An Update of DOE/SR-0007 (DOE/RL-82-1) Letter from Burstein (WE) to Rollins (GNS) re: Spent Fuel Transportation and Storage Casks Memo from Fay (WE) to Zach re: Nuclear Power Department Call List EEI's Unsolicited Comments on Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Jan. 25,1983) Memorandum from Morgan (DOE) to NWPA Project Office Personnel re: Implementation of the Nuclear Waste Policy Act of 1982 Proposed Standard Contract for Disposal of Spent Nuclear Fuel and/or High Level Radioactive Waste Letter from Rauch (DOE) to Fay (WE) re: request for administrative information to facilitate signing of contract Letter from Beckham (Georgia Power) to Morgan (DOE) re: Contract for Disposal of Spent Nuclear Fuel and/or High Level Radioactive Waste

6/1/1982

0022

WISC00099272

WISC00099276

No Objection

11/30/1982

0023 0024

WISC00060049 SN048683

WISC00060058 SN048724

No Objection No Objection

01/13/1983 1/25/1983

0025

EDB0030855

EDB0030856

No Objection

1/28/1983

0026

WISC00125498

WISC00125512

No Objection

2/4/1983

0027

COF0030631

COF0030632

No Objection

02/14/1983

0028

PA 189442

PA 189449

No Objection

3/4/1983

Confidential Work Product. Do Not Reproduce.

Page 3 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 4 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0029 Letter from Clayton (Alabama Power) to SN048729 Morgan (DOE) re: Contract for Disposal of Spent Nuclear Fuel and/or High Level Radioactive Waste 0030 Letter from Kearney (Edison Electric Institute) to Morgan (DOE) re: Standard Contract for Disposal of Spent Nuclear Fuel and/or High Level Radioactive Waste (10 CFR Part 961) Letter from Williams (TVA) to Atkinson (DOE) re: draft standard contract Letter from Dean (TVA) to Morgan (DOE) enclosing TVA's comments concerning proposed procedures and proposed draft standard contract ADM002.0270 Bates - End SN048737 Government Objections No Objection

Doc Date 3/4/1983

ADM002.0329

No Objection

3/7/1983

0031 0032

COF0022293 TVA000013

COF0022294 TVA000041

No Objection No Objection

3/7/1983 3/7/1983

0033

Letter from Trosten (LeBoeuf, Lamb) to HQZ19881109013 Morgan (DOE) re: comments on 3 proposed standard contract on behalf of the Electric Utility Companies' Nuclear Transportation Group Letter from Fay (WE) to Atkinson (DOE) WISC00044964 re: Spent Fuel Disposal Contract Point Beach Nuclear Plant Standard Contract for Disposal of Spent HQR0420950 Nuclear Fuel and/or High Level Radioactive Waste, 48 Fed. Reg. 16590 (April 18, 1983) Statement of Robert L. Morgan, Project Director, Nuclear Waste Policy Act Project Office, Department of Energy, Before the Subcommittee on Energy Research and Development, United States Senate EDB-002-0463

HQZ1988110901 33

No Objection

3/7/1983

0034

WISC00044965

No Objection

3/9/1983

0035

HQR0420969

No Objection

04/18/1983

0036

EDB-002-0480

No Objection

5/2/1983

Confidential Work Product. Do Not Reproduce.

Page 4 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 5 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0037 Letter from Kearney (Edison Electric Institute) to Morgan (DOE) re: Standard Contract for Disposal of Spent Nuclear Fuel and/or High Level Radioactive Waste 0038 Letter from Burstein (WE) to Keefe (DOE) re: Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste Bates - Begin ZAB0011344 Bates - End ZAB0011346 Government Objections No Objection

Doc Date 5/20/1983

COF0030625

COF0030626

Incomplete copy

6/3/1983

0039 0040

Letter from Anttonen (DOE) to Stahlkopf HQX.19890512. (EPRI) 0035 Letter from Britt (WE) to Keefe (DOE) re: Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste Standard Contract -- Contract for disposal of spent nuclear fuel, contract no. DE-CR01-83NE44425, between DOE and WE Letter from Robert Morgan (DOE) to Kearney (Edison Electric Institute) Letter from Kraven (TVA) to Keefe (DOE) enclosing signed copies of standard contract (not attached) Letter from Morgan (DOE) to Chilk (NRC) re: storage capacity KRGEW002117

HQX19890512. 0035.00006 KRGEW002117

No Objection No Objection

6/6/1983 6/15/1983

0041

KRGWE002118

KRGWE002199

No Objection

6/16/1983

0042 0043

ZAB0011462 COF0211081

ZAB0011462 COF0211082

No Objection Authentication, Foundation, Relevance No Objection No Objection

6/17/1983 6/24/1983

0044 0045

PD00000001

PD00000004 WISC0003518

6/29/1983 7/1/1983

U.S. DOE, Report on Financing the WISC0003463 Disposal of Commercial Spent Nuclear Fuel and Processed High-Level Radioactive Waste, DOE/S-0020/1, July 1983

Confidential Work Product. Do Not Reproduce.

Page 5 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 6 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0046 Letter from Fay (WE) to DOE re: COF0030926 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 0047 Memorandum from Richard H. PNL1731282 Williamson, NWPA Project Office, to Robert Morgan, Director, NWPA Project Office, et al re: Mission Plan Strategy Overview Letter from Fay (WE) to DOE re: Annex COF0231342 B and Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 Remarks by Morgan (DOE) before the International Atomic Energy Agency, Vienna, Austria (Oct. 12, 1983) EDB0031642 Bates - End COF0030926 Government Objections No Objection

Doc Date 7/29/1983

PNL1731288

No Objection

9/15/1983

0048

COF0231347

No Objection

9/27/1983

0049

EDB0031650

No Objection

10/12/1983

0050

FY 1984 Program Guidance for Nuclear PNL0210233 Waste Fund (NWF) Evaluations (Dec. 2, 1983) Letter from Morgan (DOE) to Stanford (Edison Electric Institute) re: working draft of Mission Plan U.S. DOE, OCRWM, Civilian Radioactive Waste Management Program Mission Plan, Volume 1, Overview and Current Program Plans, Draft, December 20, 1983 Letter from Anttonen (DOE) to Bauer (DOE) re: MRS SN045165

PNL0210268

No Objection

12/2/1983

0051

SN045166

No Objection

12/20/1983

0052

CTR0421065

CTR0421191

No Objection

12/20/1983

0053

HQZ.19870615. 3986

HQZ.19870615. 3986.00004

No Objection

12/30/1983

Confidential Work Product. Do Not Reproduce.

Page 6 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 7 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0054 Memo from Burstein (WE) to Peer Reviewers, Monitored Retrievable Storage Program transmitting copy of letter to Craig (DOE) 0055 Memo from Fletcher (Battelle Pacific Northwest Laboratories) to Hall re: Revised Waste Acceptance Schedule from Draft Mission Plan Bates - Begin CTR0421693 Bates - End CTR0421696 Government Objections No Objection

Doc Date 1/9/1984

PNL0230176

PNL0230196

Relevance, Hearsay, Authenticity, Foundation

1/24/1984

0056

Letter from Fay (WE) to DOE re: COF0030923 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 Proceedings of the 1983 Civilian Radioactive Waste Management Information Meeting (Dec. 12-15, 1983) KRGWE000953

COF0030923

No Objection

1/27/1984

0057

KRGWE000961

Incomplete

2/14/1984

0058

Statement of Michael J. Lawrence (DOE PNL1730225 OCRWM) before the Subcommittee on Energy Conservation and Power, House Committee on Energy and Commerce (Feb. 22, 1984) U.S. DOE OCRWM, Mission Plan for the Civilian Radioactive Waste Management Program, Overview and Current Program Plans, Volumes I and II, DOE/RW-0005 DRAFT, reprinted July 1984 WISC00125652

PNL1730264

No Objection

2/22/1984

0059

WISC001252675

No Objection

4/1/1984

0060

Letter from Fay (WE) to DOE re: COF0030922 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2

COF0030922

No Objection

4/24/1984

Confidential Work Product. Do Not Reproduce.

Page 7 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 8 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0061 Letter from (DOE) to the Honorable J. PA105469 Bennett Johnson, U.S. Senate re: Implementation of Nuclear Waste Policy Act of 1982 0062 0063 0064 0065 Withdrawn Yancey, "Nuclear Waste," Associated Press Petersen and Early, "Waste-Disposal Advances," The Washington Post Letter from Sen. J. Bennett Johnston to Donald Paul Hodel, Sec. of Energy re: concern with nuclear waste program U.S. DOE, Nuclear Waste Fund Fee Adequacy: An Assessment (July 1984) SN044976 ZAB0011329 PA-105467 SN044976 ZAB0011329 PA-105468 Bates - End PA105470 Government Objections No Objection

Doc Date 5/30/1984

No Objection No Objection Relevance, Hearsay, Authenticity, Foundation 6/13/1984 6/15/1984

Relevance, Authenticity, Foundation 6/21/1984

0066 0067

HQR0421212

HQR0421220 YMP0011998

No Objection No Objection

7/1/1984 7/6/1984

Letter from Fay (WE) to Head (DOE) re: YMP0011997 Comments on Draft Mission Plan Civilian Radioactive Waste Management Program Letter from Lawrence (DOE) to B. Rusche (Director, Office of Civilian Radioactive Waste Management) re: Comments on the Draft Mission Plan 01087 WE Opp to MSJ Appx

0068

01090 Relevance, Hearsay Authenticity WE Opp to MSJ - (only regarding contractor Appx documents and marginalia) COF0030920 No Objection

7/23/1984

0069

Letter from Fay (WE) to DOE re: COF0030920 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 DOE, 1984 Annual Review of the 1.0 Mill per kWh Waste Disposal Fee (PNL-5241), prepared by Pacific Northwest Laboratory, Sept. 1984 PNL0290003

7/26/1984

0070

PNL0290080

Relevance, Hearsay, Authenticity (regarding contractor created doc)

9/1/1984

Confidential Work Product. Do Not Reproduce.

Page 8 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 9 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0071 Letter from Hodel (Secretary of Energy) to the Honorable J. Bennett Johnston, U.S. Senate re: disposal of spent nuclear fuel 0072 0073 Transportation Business Plan: Strategy Options Document, DOE/RW-0007 Bates - Begin HQR0430204 Bates - End HQR0430205 Government Objections No Objection

Doc Date 9/7/1984

PA178614

YPA178643 COF0231375

No Objection No Objection

10/1/1984 10/10/1984

Letter from Fay (WE) to DOE re: COF0231375 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 Memo from Zabransky (WE) to Burstein WISC00059915 (WE) re: Review of Draft GAO Report DOE Implementation of NWPA Letter from Fay (WE) to DOE re: COF0030916 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 DOE, Nuclear Waste Fund Fee Adequacy: An Assessment, Feb. 1985 RW-859 - PB2 with transmittal letter Letter from Hall (Utility Nuclear Waste Management Group) to Sharma (DOE) re: visit to DOE Letter from Burstein (WE) to Rusche (DOE) transmitting copy of letter to Schutt re: Monitored Retrievable Storage Withdrawn HQR0421221 MOV.19970714. 0058.00001 NNA.19870418. 003 HQP.19870601. 9493.00302

0074

WISC00059919

No Objection

11/9/1984

0075

COF0030916

No Objection

1/24/1985

0076 0077 0078

HQR0421234 MOV.19970714. 0058.0077 NNA.19870418. 023 HQP.19870601. 9493.00305

No Objection No Objection Relevance, Hearsay

2/1/1985 2/12/1985 3/1/1985

0079

Incomplete

3/1/1985

0080

No Objection

Confidential Work Product. Do Not Reproduce.

Page 9 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 10 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0081 Comments by Sol Burstein, A Utility Perspective on DOE's Implementation of the NWPA 0082 0083 Withdrawn U.S. DOE, The Need for and Feasibility of Monitored Retrievable Storage - A Preliminary Analysis, Apr. 1985 U.S. DOE, OCRWM, Analysis of the Total System Life Cycle Cost for the Civilian Radioactive Waste Management Program, DOE/RW-0024, Apr. 1985 HQR0361385 HQR0361457 Bates - Begin CTR0421800 Bates - End CTR0421812 Government Objections No Objection

Doc Date 3/14/1985

No Objection No Objection 4/1/1985

0084

PA176450

PA176675

No Objection

4/1/1985

0085

Letter from Fay (WE) to Gibbard (DOE) HQR0390848 re: Transmittal of Additional Information, Nuclear Fuel Data Form (EIA Form RW-859) Point Beach Nuclear Plant, Units 1 and 2 Letter from Fay (WE) to Jedry (DOE) re: COF0030906 Request for Relief from Spent Fuel Disposal Fee, Point Beach Nuclear Plant U.S. DOE, OCRWM, Mission Plan for the Civilian Radioactive Waste Management Program, DOE/RW-0005, June 1985 Excerpts from Mission Plan For The Civilian Radioactive Waste Management Program, Vol. 1 Withdrawn PA140163

HQR0390849

Relevance

4/22/1985

0086

COF0030907

Relevance

5/8/1985

0087

PA141779

No Objection

6/1/1985

0088

KRGWE002608

KRGWE002652

No Objection

6/1/1985

0089

No Objection

Confidential Work Product. Do Not Reproduce.

Page 10 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 11 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0090 Letter from Fay (WE) to DOE re: COF0030880 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 0091 Letter from Fay (WE) to DOE re: COF0030878 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 U.S. DOE, OCRWM, The Need for and Feasibility of Monitored Retrievable Storage -- A Preliminary Analysis HQR0364193 Bates - End COF0030883 Government Objections No Objection

Doc Date 6/26/1985

COF0030878

No Objection

7/22/1985

0092

HQR0364252

No Objection

8/1/1985

0093

Letter from Fay (WE) to DOE re: COF0030871 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 U.S. DOE, OCRWM, Transportation Business Plan, DOE/RW-0046 HQR0370258

COF0030871

No Objection

10/10/1985

0094 0095

HQR0370311 COF0231329

No Objection No Objection

1/1/1986 1/23/1986

Letter from Fay (WE) to DOE re: COF0231329 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 U.S. DOE, OCRWM, Nuclear Waste Fund Fee Adequacy: An Assessment, March 1986 Letter from Fay (WE) to DOE re: Transmittal of EIA Nuclear Fuel Data Forms (RW-859) Point Beach Nuclear Plant, Units 1 and 2 HQR0421235

0096

HQR0421251

No Objection

3/1/1986

0097

WISC00060015

WISC00060015

No Objection

3/5/1986

Confidential Work Product. Do Not Reproduce.

Page 11 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 12 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0098 Nuclear Fuel Data Form, RW-859 for Point Beach 1 and 2 with transmittal letter 0099 U.S. DOE, OCRWM, Analysis of Total System Life Cycle Cost of the Commercial High-Level Radioactive Waste Disposal Program, Vol. I, DOE/RW-0047, April 1986 Bates - Begin WISC00060016 Bates - End WISC00060046 Government Objections No Objection

Doc Date 3/6/1986

01201 WE Opp to MSJ Appx

01232 No Objection WE Opp to MSJ Appx

4/1/1986

0100

Letter from Fay (WE) to DOE re: COF0231328 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 1986 Annual Review of the Adequacy of PNL1072117 the 1.0 mill per kWh Waste Disposal Fee Memo from A. Brownstein (DOE) to File HQR-008-0178 re: discussion with Steve Kraft (UMNWG) on June 26, 1989 of April 28, 1987 letter re: interpretation of standard contract and handwritten notes confirming July 07, 1987 discussion with S. Kraft Letter from Fay (WE) to Jedrey (DOE) re: Transmittal of Certified Historical Data, Point Beach Nuclear Plant, Units 1 and 2 COF0231318

COF0231328

No Objection

4/21/1986

0101

PNL1072223

Authentication, Foundation, Hearsay, Relevance No Objection

5/1/1986

0102

HQR-008-0178

6/29/1986

0103

COF0231321

No Objection

7/21/1986

0104

Letter from Fay (WE) to DOE re: COF0231322 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units I and 2

COF0231327

No Objection

7/25/1986

Confidential Work Product. Do Not Reproduce.

Page 12 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 13 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0105 U.S. DOE, Idaho Operations Office, WISC00124100 Request for Proposal (RFP) No. DE-RP07-861D12625 for Development of From-Reactor Casks, To Prospective Offerors, July 31, 1986 0106 S. Hearing Rpt. No. 100-230, pt. 2 (1987) S. Rep. No. 100-152 (1987) 01214 WE Opp to MSJ Appx 00223 WE Opp to MSJ Appx 00260 WE Opp to MSJ Appx Bates - End WISC00124101 Government Objections No Objection

Doc Date 7/31/1986

01222 No Objection WE Opp to MSJ Appx 002259 No Objection WE Opp to MSJ Appx 00290 No Objection WE Opp to MSJ Appx HQR0255200 No Objection

1987

0107

1987

0108

H.R. Rep. No. 100-425, pt. 1 (1987)

1987

0109

U.S. DOE, OCRWM, Draft Mission Plan HQR0255140 Amendment, DOE/RW-0128, January, 1987 Withdrawn Letter from Fay (WE) to DOE re: COF0030845 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 Letter to WE from EDE Inc. re: Storage Tanks Nuclear Fuel Data Form RW-859 for Point Beach 1 with transmittal letter Nuclear Fuel Data Form RW-859 for Point Beach 2 with transmittal letter WISC00129787 HQR3640041 HQR3640057

1/1/1987

0110 0111

No Objection COF0030845 No Objection 1/19/1987

0112 0113 0114

WISC00129788 HQR3640056 HQR3640070

Authentication, Foundation, Hearsay, Relevance No Objection No Objection

1/27/1987 2/9/1987 2/9/1987

Confidential Work Product. Do Not Reproduce.

Page 13 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 14 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0115 U.S. DOE, OCRWM, Monitored Retrievable Storage Submission to Congress, Volume I: The Proposal, March 1987 0116 Statement of Sol Burstein, Vice Chairman, Wisconsin Electric Power Co., on Behalf of Edison Electric Institute, American Nuclear Energy Council, Utility Nuclear Waste Management Group, Electric Utility Companies' Nuclear Transportation Group, Atomic Indus Meeting Notes of The Utility Nuclear Waste Management Group High-Level Waste/Spent Fuel Storage Working Group Letter from Kearney (Edison Electric Institute) to Rusche (OCRWM) re: Draft Mission Plan Amendment Withdrawn Letter from Fay (WE) to DOE re: COF0030838 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 U.S. DOE, OCRWM, Preliminary Analysis of Total System Life Cycle Cost of the Civilian High-Level Radioactive Waste Disposal Program, Final Draft, April 27, 1984 PNL0201491 COF0030838 Bates - Begin PA171880 Bates - End PA171922 Government Objections No Objection

Doc Date 3/1/1987

EDB0030434

EDB0030442

No Objection

3/19/1987

0117

SN000228

SN000235

No Objection

3/25/1987

0118

PA142473

PA142480

No Objection

4/3/1987

0119 0120

No Objection No Objection 4/16/1987

0121

PNL0201657

Authentication, Foundation, Hearsay, Relevance

4/27/1987

0122

Letter from Kraft (Utility Nuclear Waste HQR0080179 Management Group) to Jedrey (DOE) re: ruling interpreting Standard Contract

HQR0080192

No Objection

4/28/1987

Confidential Work Product. Do Not Reproduce.

Page 14 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 15 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0123 U.S. DOE, OCRWM, Annual Capacity Report, June 1987 0124 Bates - Begin HQR0012705 Bates - End HQR0012792 HQR0032142 Government Objections No objection No Objection

Doc Date 6/1/1987 6/1/1987

U.S. DOE, OCRWM, OCRWM Mission HQR0031621 Plan Amendment, DOE/RW-0128, June 1987 U.S. DOE, OCRWM, Nuclear Waste Fund Fee Adequacy: An Assessment, June 1987 U.S. DOE, OCRWM, Analysis of the Total Life Cycle Cost for the Civilian Radioactive Waste Management Program, Vol. II, DOE/RW-0047, June 1987 U.S. DOE, OCRWM, Analysis of the Total System Life Cycle Cost for the Civilian Radioactive Waste Management Program, Vol. I, DOE/RW-0047, June 1987 U.S. DOE, OCRWM Annual Capacity Report, June 1987 HQR0421252

0125

HQR0421268

No Objection

6/1/1987

0126

PA176850

PA176998

No Objection

6/1/1987

0127

PA176705

PA176849

No Objection

6/1/1987

0128 0129

PA103152

PA103171 PA142137

No Objection No Objection

6/1/1987 6/1/1987

U.S. DOE, OCRWM Mission Plan PA142069 Amendment with Comments on the Draft Amendment and Responses to the Comments, June 1987 Letter from Fay (WE) to Jedrey (DOE) re: Revision to Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 COF0030815

0130

COF0030835

No Objection

6/11/1987

Confidential Work Product. Do Not Reproduce.

Page 15 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 16 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0131 U.S. DOE, OCRWM, 1987 Annual Review of the Adequacy of the 1.0 mill per kWh Waste Disposal Fee, PNL-6288, Prepared by Pacific Northwest Laboratory, July 1987 0132 Memo from Burstein (WE) to Britt (WE) and McNeer (WE) re: Nuclear Waste Fund Appropriations Post Hearing Questions and Answers Relating to the July 16, 1987 Hearing Before the Senate Sub-Committee on Energy and Natural Resources - United States Senate (Witness: Ben Rusche), 07/16/87 Testimony of Sol Burstein, Vice Chairman Wisconsin Electric Power Company, on behalf of Edison Electric Institute American Nuclear Energy Council, etc. on the Nuclear Waste Program and Proposed Legislation before the Committee on Energy and Natural Resour Memo from Milner (DOE) to Barrett re: Proposed Assumptions and Case List for 1988 TSLCC with attachments WE memo re: spent fuel pool inventory Bates - Begin PNL1071901 Bates - End PNL1072003 Government Objections Authentication, Foundation, Hearsay, Relevance

Doc Date 7/1/1987

WISC00000584

WISC00000584

No Objection

7/6/1987

0133

HQR0100804

HQR0100853

No Objection

7/16/1987

0134

MOV.19990212. 0040.00001

MOV.19920212. 0040.00008

No Objection

7/17/1987

0135

PNL1020359

PNL1020377

No Objection

9/9/1987

0136 0137

WISC00020172

WISC00020295 PNL0460255

No Objection No Objection

9/11/1987 10/2/1987

Letter from Jedrey (DOE) to Kraft (Utility PNL0460251 Nuclear Waste Management Group) re: request for clarification of Standard Contract Wisconsin Electric Revised Budget Status Report WISC00060964

0138

WISC00060964

No Objection

12/30/1987

Confidential Work Product. Do Not Reproduce.

Page 16 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 17 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0139 Letter from Fay (WE) to DOE re: COF0030810 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 0140 Memo from Samuel Rousso (DOE) re: Assumptions for 1988 TSLCC with attached revised assumptions Nuclear Fuel Data Form RW-859 for Point Beach 1 with transmittal letter Nuclear Fuel Data Form RW-859 for Point Beach 2 with transmittal letter Letter from Kraft (Utility Nuclear Waste Management Group (DOE) to Rousso (DOE) re: review of Nuclear Waste Fund Fee Adequacy: An Assessment Annual Report of the Nuclear Transportation Group, 1988-1989 Program Memo from Bratcher (WE) to Fay, Boucher, Boston, and Britt re: RD&D Project Authorization - Spent Fuel Storage Letter from Fay (WE) to Lambert (Electric Power Research Institute) re: Project Proposal - Spent Fuel Storage Demonstration Project Letter from Rousso (DOE) to Kraft (Utility Nuclear Waste Management Group) re: disposal fee adequacy Withdrawn PNL1080507 Bates - End COF0030810 Government Objections No Objection

Doc Date 1/21/1988

PNL1080529

No Objection

1/28/1988

0141 0142 0143

HQR3640071 HQR3640100 HQX8804070008

HQR3640099 HQR3640126

No Objection No Objection

2/8/1988 2/8/1988 4/5/1988

HQX8804070008 No Objection

0144

HQX.19880711. 0115 WISC00061014

HQX.19880711. 0115.00012 WISC00061026

No Objection

5/1/1998

0145

No Objection

5/6/1988

0146

WISC00061027

WISC00061029

No Objection

5/12/1988

0147

HQO8805230013

HQO8805230013 No Objection

5/23/1988

0148

No Objection

Confidential Work Product. Do Not Reproduce.

Page 17 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 18 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0149 U.S. DOE, OCRWM, Annual Capacity Report, DOE/RW-0191, 1988 0150 0151 0152 U.S. DOE, Draft 1988 Mission Plan Amendment Withdrawn Appendix C, EPRI RP3073-I, General WISC00060697 Services Agreement between Wisconsin Electric Power Company and Pacific Sierra Nuclear Associates Memo from Mroczka (Northeast Nuclear WISC01530001 Energy Co.) to NRC re: Millstone Nuclear Power Station, Unit No. 1 Proposed Change to Technical Specifications Spent Fuel Pool Capacity Expansion with attachments WE memo re: spent fuel pool inventory U.S. DOE Document Route Slip re: WE Over/Under-Payment of One-Time Fee WISC00020297 COF0231271 WISC00060709 Bates - Begin PA102885 HQR0255201 Bates - End PA102975 HQR0255309 Government Objections No Objection No Objection No Objection No Objection

Doc Date 6/1/1988 6/1/1988

6/24/1988

0153

WISC01530212

A/F, Hearsay

6/24/1988

0154 0155 0156

WISC00020348 COF0231271 WISC00001218

No Objection No Objection No Objection

8/8/1988 8/21/1988 8/26/1988

Letter from Fay to Kay (DOE) re: 1988 WISC00001217 Draft Mission Plan Amendment (53 Fed. Reg. 22482) Letter from Kearney (Edison Electric Institute) to Kay (DOE) re: 1988 Draft Mission Plan Amendment Letter from Bruce E. Hunt, Manager, Nuclear Fuel, Southern Company Services, Inc., to Robert Woytko, Contracting Officer, Department of Energy re: impact draft mission plan HQR0061154

0157

HQR0061156

No Objection

8/29/1988

0158

HQR0080228

HQR0080231

Authentication, Foundation, Hearsay, Relevance

9/23/1988

Confidential Work Product. Do Not Reproduce.

Page 18 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 19 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0159 Letter from Bruce E. Hunt, Manager, Nuclear Fuel, Southern Company Services, Inc., to Charles Head, Department of Energy re: comments on use of dry cask storage 0160 0161 Letter from Forsberg (DOE) Letter from Pennington (Transnuclear) to Zabransky (WE) re: TN 24 Site Specific and Handling Information Bates - Begin PNL1721935 Bates - End PNL1721938 Government Objections Authentication, Foundation, Hearsay, Relevance

Doc Date 10/26/1988

HQX.881228. 0005 WISC00033239

HQX.19881228. 0005.00032 WISC00033239

No Objection No Objection

12/16/1988 1/19/1989

0162

Letter from Lee (NAC) to Zabransky WISC00034377 (WE) re: Topical Safety Analysis Report (TSAR) for the NAC Storage/Transport (S/T) Cask Nuclear Fuel Data Form RW-859 for Point Beach 1 and 2 with transmittal letter Letter from Blackmon (Duke Engineering) to Zabransky (WE) re: Oconee Nuclear Station Independent Spent Fuel Storage Installation Licensing Documents CC-89-032 File: MTS-2026 Letter from Anderson (General Nuclear Systems, Inc.) to Zabransky (WE) re: CASTOR X/28-33 Letter from Berryman (Virginia Power) to Stein (DOE) re: program to develop dual purpose storage/transport casks U.S. DOE, Amendment of Solicitation/Modification of Contract for Contract No. DE-CRO1-83NE44425 HQR3640239

WISC00034377

No Objection

1/26/1989

0163

HQR3640295

No Objection

2/3/1989

0164

WISC00033315

WISC00033316

No Objection

2/7/1989

0165

WISC00033317

WISC00033317

No Objection

2/8/1989

0166

WISC00124202

WISC00124204

No Objection

2/27/1989

0167

COF0030667

COF0030672

No Objection

3/24/1989

Confidential Work Product. Do Not Reproduce.

Page 19 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 20 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0168 DOE/TWG Meeting Report 0169 U.S. DOE, OCRWM, Analysis of the Total System Life Cycle Cost for the Civilian Radioactive Waste Management Program, DOE/RW-0236, May 1989 Wisconsin Electric, Project Requisition Summary, Budget Item 840330, Additional Spent Fuel Storage Bates - Begin MOL.19970929. 0051 PA177145 Bates - End MOL.19970929. 0051.00038 PA177334

Government Objections Doc Date Authentication, Foundation, Hearsay 4/25/1989 No Objection 5/1/1989

0170

KRGWE002225

KRGWE002226

No Objection

5/3/1989

0171

Memo from Fay (WE) to Britt and WISC00000457 McNeer re: Work Order Requisition Design, Licensing, Construction and Operation of an Independent Spent Fuel Storage Installation (ISFSI) Point Beach Nuclear Plant Memo from Nunez (Pacific Sierra Nuclear Associates) to distribution re: Revised Meeting Minutes, Ventilated Storage Cask (VSC) Demonstration Project Technical Management Committee Meeting, April 13, 1989 DOE OCRWM, MRS System Study Summary Report, June 1989 The DOE Position on the MRS Facility Draft 1989 Annual Capacity Report Withdrawn WISC00032032

WISC00000465

No Objection

5/3/1989

0172

WISC00032041

No Objection

5/15/1989

0173 0174 0175 0176

HQR0061736 HQR0370409 EDB0010468

HQR0061885 HQR0370440 EDB0010487

No Objection No Objection

6/1/1989 6/1/1989

Authentication, Foundation, Hearsay 6/1/1989 No Objection

Confidential Work Product. Do Not Reproduce.

Page 20 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 21 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0177 Letter from Nunez (Pacific Sierra Nuclear) to Creer (PNL) re: Review/Approval of Revised PSN Technical Project Plan for PSN/DOE Concrete Cask Cooperative Agreement with enclosure 0178 Statement by Shimon (WE) at Transportation Coordination Group Meeting WE memo re: spent fuel pool inventory Letter from Kraft (Edison Electric Institute) to Stein (DOE) re: dual purpose cask development program Bates - Begin WISC00032042 Bates - End WISC00032060 Government Objections Authentication, Foundation, Hearsay, Relevance

Doc Date 6/23/1989

MOV.19961031. 0086 WISC00020357 WISC00124205

MOV.19961031. 0086.00007 WISC00020457 WISC00124212

No Objection

07/25-26 1989 8/4/1989 9/20/1989

0179 0180

No Objection Authentication, Foundation, Hearsay, Relevance Authentication, Foundation

0181

Monitored Retrievable Storage HQR0363992 Commission, Nuclear Waste: Is There a Need for Federal Interim Storage? Report of the Monitored Retrievable Storage Commission, Nov. 1, 1989 Withdrawn U.S. DOE, Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program, DOE/H W-0247, November 1989 Letter from Boyle (NRC) to Mroczka (Connecticut Yankee) re: Issuance of Amendment (TAC No. 68157) with enclosures YMP0020183

HQR0364185

11/1/1989

0182 0183

No Objection YMP0020212 No Objection 11/1/1989

0184

WISC0184-0001

WISC0184-0025

No Objection

11/27/1989

0185

Letter from Kouts (DOE) with minutes of MOV.19961021. the Transportation Coordination Group 0039 meeting in Chicago

MOV.19961021. 0039.00073

No Objection

11/29/1989

Confidential Work Product. Do Not Reproduce.

Page 21 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 22 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0186 DOE MRS System Studies, Summary Report and Additional Analyses, INMM Spent Fuel Seminar VII 0187 0188 0189 0190 Nuclear Fuel Data Form RW-859 for Point Beach 1 with transmittal letter Nuclear Fuel Data Form RW-859 for Point Beach 2 with transmittal letter Transportation Coordination Group Meeting Minutes U.S. DOE, OCRWM, Waste Management System Description Document, DOE/RW-0270P, March 1990 Statement by Shimon (WE) at Western Interstate Energy Board High-Level Waste Committee Meeting Letter from Massey (Pacific Sierra Nuclear) to Collantes (DOE) re: Notice of DOE-ID's Default on Contract DE-FC06-88RLl1394 Massey letter to DOE Memo from Stein to Isaacs re: Review of Predecisional Draft, Nuclear Waste Negotiator (NWN) Support Information Book Letter from Rueter (DOE) to Fay (WE) re: non-issuance of ACR for 1989 Commercial Spent Fuel Management and Concrete Cask Testing Programs Monthly Progress Report Bates - Begin ERINSP02126 WISC00131072 HQR3640348 HQR3640375 MOL.19971023. 0003 PNL0261631 Bates - End ERINSP02147 WISC00131072 HQR3640374 HQR3640401 MOLl9971023. 0003.00015 PNL0261675 Government Objections No Objection

Doc Date 1/1/1990

No Objection No Objection No Objection No Objection

1/26/1990 1/26/1990 2/21/1990 3/1/1990

0191

MOL.19980529. 0009 WISC00034671

MOL.19980529. 0009.00011 WISC00034671

No Objection

3/6/1990

0192

Authentication, Foundation, Hearsay, Relevance

4/3/1990

0193 0194

WISC00034672 ERINSP02148 WISC00131072

WISC00034672 ERINSP02159 WISC0131072

Authentication, Foundation, Hearsay, Relevance

4/4/1990

Authentication, Foundation, Hearsay 4/19/1990

0195 0196

COF0030798 WISC00032439

COF0030798 WISC00032489

No Objection Authentication, Foundation, Hearsay, Relevance

4/27/1990 05/1990

Confidential Work Product. Do Not Reproduce.

Page 22 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 23 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0197 Facility Interface Capability Assessment HQR0442620 (FICA) Project, Cask-Handling Assessment Point Beach Units 1 and 2 0198 Letter from Carr (Pacific Sierra Nuclear) WISC00040419 to Zabransky (WE) re: Calculation of Fuel Temperature Limits for the VSC-24 Contract No. 170564 between WE and Sierra Nuclear Corporation for ISFSI work WISC00009444 Bates - End HQR0442631

Government Objections Doc Date Authentication, Foundation, Hearsay 5/1/1990

WISC00040436

No Objection

5/10/1990

0199

WISC00009451

No Objection

7/25/1990

0200

Letter from Parker (WE) to Jenkins WISC00028159 (Public Service Commission of Wisconsin) re: PBNP ISFSI Environmental Assessment by the NRC Letter from Kouts (DOE) with Minutes of MOV.19961021. the Transportation Coordination Group 0044 Meeting Withdrawn WE memo re: spent fuel pool inventory Letter from Schwartz (ERI) to Shimon (WE), et al. transmitting DOE justification for preliminary cask design selection U.S. DOE, OCRWM, Comment Response Document for the Secretary of Energy's "Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program," Nov. 1990 U.S. DOE, OCRWM, Nuclear Waste Fund Fee Adequacy: An Assessment, DOE/RW-0291P WISC00020459 WISC00040252

WISC00028159

No Objection

8/27/1990

0201

MOV.19961021. 0044.00025

No Objection

9/19/1990

0202 0203 0204

No Objection WISC00020565 WISC00040275 Relevance, Hearsay 10/16/1990 10/19/1990

0205

HQR0362077

HQR0362188

No Objection

11/1/1990

0206

IDF0022292

IDF0022317

No Objection

11/1/1990

Confidential Work Product. Do Not Reproduce.

Page 23 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 24 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0207 Letter from Schwartz (ERI) to Shimon (WE), et al. transmitting comments on transportation cask preliminary design reports 0208 Midwestern High-Level Radioactive Waste Committee Summary of Proceedings Statement of Shimon (WE) to Nuclear Waste Technical Review Board Letter from Chechilnitsky (Sierra Nuclear) to Zabransky (WE) transmitting design and fabrication specification and review and evaluation documents U.S. DOE, OCRWM, Annual Capacity Report, DOE/RW-0294P, December 1990 Withdrawn U.S. DOE, OCRWM, Preliminary PNL1071603 estimates of the total-system cost for the restructured program: an addendum to the May 1989 analysis of the total system life cycle cost for civilian radioactive waste management program, DOE/RW-0295P, December 1990 U.S. DOE OCRWM, Annual Capacity Report, December 1990 PA102761 PNL1071705 Bates - Begin WISC00129789 Bates - End WISC00129824

Government Objections Doc Date Relevance, Hearsay, Authentication, 11/8/1990 Foundation

HQO.19991119. 0012 HQX.19910125. 0008 WISC00040447

HQO.19991119. 0012.00011 HQX.19910125. 0008.00009 WISC00040472

Relevance, Hearsay, Authentication, 11/15/1990 Foundation Relevance, Hearsay, Authenticity and Foundation 11/19/1990

0209 0210

Relevance, Hearsay, Authentication, 11/26/1990 Foundation

0211

HQR0020576

HQR0020699

No Objection

12/1/1990

0212 0213

No Objection No Objection 12/1/1990

0214

PA102884

No Objection

12/1/1990

Confidential Work Product. Do Not Reproduce.

Page 24 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 25 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0215 Pacific Northwest Laboratory under PNL0412110 DOE Contract No. DE-AC06-76RLO 1830, "Determination of Cost Effective Waste Management System Receipt Rates," presented at Second Annual High-Level Radioactive Waste Management conference, January 1991 0216 U.S. House of Representative Report WISC00124198 101-536, Conference Report for Energy and Water Development Appropriations Bill, 1991 Midwestern High-Level Radioactive Waste Transportation Primer (Draft) Nuclear Fuel Data Form RW-859 for Point Beach 2 with transmittal letter Nuclear Fuel Data Form RW-859 for Point Beach 1 with transmittal letter HQX.19910313. 0012 HQR03640431 HQR3640402 Bates - End PNL0412119 Government Objections Relevance, Hearsay, Authenticity

Doc Date 1/1/1991

WISC00124201

No Objection

1/1/1991

0217 0218 0219 0220

HQX.19910313. 0012.00104 HQR03640450 HQR3640430 WISC00060686

Relevance, Hearsay, Authenticity No Objection No Objection No Objection

2/1/1991 2/14/1991 2/14/1991 4/23/1991

Memo from Zabransky (WE) to Goetsch WISC00060672 re: transmitting executed General Service Agreement with Sierra Nuclear Corporation Letter to Fay from DOE re The Standard WISC00059938 Contract for Disposal of Spent Nuclear Fuel and / or High - Level Radioactive Waste Memo to Boston from Lipke re: DOE Acceptance Priority Ranking Memo from McDuffie to Langstaff Re: Recommended DOE Positions on 18 Contract Implementation Issues WISC00000210 NET0010715

0221

WISC00059973

No Objection

5/15/1991

0222 0223

WISC00000210 NET0010725

No Objection Relevance, Hearsay, Authenticity

5/31/1991 6/28/1991

Confidential Work Product. Do Not Reproduce.

Page 25 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 26 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0224 Letter from Fay (WE) to Reuter (DOE) re: Review of Draft Acceptance Priority Ranking 0225 0226 0227 Spent Fuel Storage / Transport / Disposal Containers Canisters in the Spent Fuel Pit Isaacs (DOE) letter, forwarding discussion notes from the Third Strategic Principles Workshop, which was held in Denver, Colorado, on April 3-4, 1991 Letter from Willington J. Lee (SNC) to D. Zabransky (WE) re: Proposal to Develop a Preliminary Cask Design for the Transportation of Multi-Element Sealed Containers (SNC-ATL-91-045) General Accounting Office, Nuclear Waste: Operation of Monitored Retrievable Storage Facility is Unlikely by 1998, Sept. 1991 Martin Marietta Energy Systems, lnc., Site and Facility Waste Transportation Services Planning Document, Point Beach Nuclear Plant Unit 1, Wisconsin Electric Power Company, Draft, Revision 0 Memo from Zabransky (WE) re: Draft Environmental Screening Report Independent Spent Fuel Storage Installation Point Beach Nuclear Plant with attachment Bates - Begin WISC00060048 Bates - End WISC00060048 Government Objections No Objection

Doc Date 7/8/1991

WISC00023045 WISC00023083 WISC00028342

WISC00023049 WISC00023083 WISC00028398

Relevance, Hearsay, Authentication, 7/8/1991 Foundation No Objection No Objection 7/17/1991 8/1/1991

0228

WISC00129825

WISC0129829

No Objection

8/7/1991

0229

WISC00003080

WISC00003134

No Objection

9/1/1991

0230

HQX19910918. 0011.00001

HQX19910918. 0011.00059

Hearsay, Authentication, Foundation 9/1/1991

0231

WISC00055844

WISC00055915

No Objection

9/4/1991

Confidential Work Product. Do Not Reproduce.

Page 26 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 27 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0232 Memo from Anundson (WE) re: Boraflex Surveillance Program, attachments 0233 Bates - Begin WISC00040883 Bates - End WISC00040977 Government Objections No Objection

Doc Date 10/14/1991

Memo from Nickels (WE) re: Annual WISC00020355 Inventory of Fuel Assemblies and Other WISC0 Devices, attachments Memo to Maxfield from Bronk re Annual WISC00020567 Inventory of Fuel Assemblies and Other Devices w/attachments Withdrawn Letter from Porter (WE) to Reynolds (PSCW) re: application for authority to construct and place in utility operation an ISFSI at Point Beach U.S. DOE, OCRWM, Annual Capacity Report, DOE-RW-0331P, December 1991 U.S. DOE, OCRWM, 1991 Acceptance Priority Ranking, Dec. 1991 Withdrawn Nuclear Power Department Project Administrator's Manual ACR Issues Status Report, Dec. 31, 1991 Nuclear Fuel Data Form RW-859 for Point Beach 1 with transmittal letter Nuclear Fuel Data Form RW-859 for Point Beach 2 with transmittal letter Withdrawn WISC00054812 HQR0030314 HQR3640460 HQR3640533 WISC00014727

WISC00020355 WISC0 WISC00020691

No Objection

10/17/1991

0234

No Objection

10/17/1991

0235 0236

No Objection WISC00014825 No Objection 11/15/1991

0237

HQR0040354

HQR0040417

No Objection

12/1/1991

0238 0239 0240 0241 0242 0243 0244

HQR0040426

HQR0040461

No Objection Incomplete

12/1/1991

WISC00054917 HQR0030315 HQR3640532 HQR3640565

No Objection Hearsay, Authenticity, Foundation No Objection No Objection

12/26/1991 12/31/1991 2/14/1992 2/14/1992

Confidential Work Product. Do Not Reproduce.

Page 27 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 28 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0245 Letter from Porter (WE) to Dums (Citizens Utility Board) re: PBNP ISFSI Docket No. 6630-CE-197 CUB Data Request #1 0246 Letter from M. Detmer, Contracting Officer, Department of Energy, to R.G. Cocherell, Manager, Nuclear Fuel Services, Southern Nuclear Operating Company re: DCSs with attachment of DCS instruction Letter from Detmer (DOE) to Fay (WE) re: Standard Contract for Disposal of Spent Nuclear Fuel Letter to Anundson from SNC re Cost and Schedule Estimate for Clean-Up of the Point Beach 1/2 Spent Fuel Pool "Performance Testing and Analyses of the VSC-17 Ventilated Concrete Cask, Final Report," prepared for Wisconsin Electric and DOE, May 1992 Memo from Palmer (WE) to Zach re: PBNP Spent Fuel Storage Facility w/attachments Letter from Porter (WE) to Dums (Citizens Utility Board) re: PBNP ISFSI Docket No. 6630-CE-197 CUB Data Request #2 Withdrawn Letter from Weydert (WE) to Creighton WISC000040982 (Westinghouse Electric) re: Spent Fuel Pool Inventory Point Beach Unit 1 Cycle 21 Plans for Fuel Assembly Reinsertion WISC000041008 Bates - Begin WISC00000924 Bates - End WISC00000980 Government Objections No Objection

Doc Date 2/28/1992

HQR0012066 HQR0012045

HQR0012067 HQR0012051

Relevance

3/4/1992

0247

HQR0012168

HQR0012169

No Objection

3/4/1992

0248

WISC00040978

WISC00040981

Relevance, Hearsay, Authentication, 3/24/1992 Foundation Hearsay, Authentication, Foundation 5/1/1992

0249

HQR3730426

HQR3730594

0250

WISC00033407

WISC00033415

No Objection

5/6/1992

0251

WISC00003431

WISC00003438

No Objection

5/21/1992

0252 0253

No Objection No Objection 5/27/1992

Confidential Work Product. Do Not Reproduce.

Page 28 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 29 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0254 Memo from Link re Spent Fuel Dry Storage Point Beach Nuclear Plant 0255 Letter from Massey (Sierra Nuclear) to Zabransky (WE) re: WE-SNC Licensing Agreement PSCW Notice Point Beach Nuclear Plant Modification Request 92-120 Bates - Begin WISC00056027 WISC00040326 Bates - End WISC00056028 WISC00040327 Government Objections No Objection No Objection

Doc Date 5/29/1992 7/1/1992

0256 0257 0258 0259

WISC00011131 WISC00085906

WISC00011134 WISC00087026 WISC00056030 WISC00125881

No Objection No Objection No Objection No Objection

7/16/1992 7/20/1992 8/20/1992 9/21/1992

Link (WE) memo re: Construction of Dry WISC00056029 Storage Facility Letter to DOE Contracting Officer from Link (WE) attaching Delivery Commitment Schedules (DCS) for ten spent nuclear fuel deliveries to DOE beginning in 1998 WE memo re: spent fuel pool inventory Letter to Jenkins (PSCW) from Porter (WE) re: application for authority to replace the Unit 2 steam generators at the Point Beach Nuclear Plant WISC00125871

0260 0261

WISC00020693 WISC00014672

WISC00020839 WISC00014687

No Objection No Objection

9/28/1992 9/30/1992

0262

Supko (ERI) letter to Alissi (Edison ERINSP-01398 Electric) transmitting Spent Fuel WISC00131072 Acceptance Rates and its Affect [sic] on Utility Spent Fuel Storage and Decommissioning Costs, prepared by ERI, ERI-0439 DRAFT, October 1992 Massey (Sierra Nuclear) letter to Zabransky (WE) with attached invoice WISC00043124

ERINSP-011461 WISC00131072

Hearsay, Authentication, Foundation 10/6/1992

0263 0264

WISC00043134 WISC00011159

No Objection No Objection

10/9/1992 10/13/1992

Email from Zabransky (WE) to Link WISC00011159 (forwarded to Yakich and Knitter) re: Dry Cask EIS Meeting

Confidential Work Product. Do Not Reproduce.

Page 29 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 30 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0265 Sierra Nuclear Corp. invoice for receipt of equipment at Point Beach 0266 Letter from Martin (Quarles & Brady) to Dorr (PSCW) re: Citizens Utility Board Intervenor Compensation Request Contract For Delivery of The Ventilated Storage Cask to the Point Beach Nuclear Plant Between Sierra Nuclear Corporation and Wisconsin Electric Power Company Bates - Begin WISC00008830 WISC00011088 Bates - End WISC00008830 WISC00011090 Government Objections No Objection No Objection

Doc Date 10/22/1992 10/26/1992

0267

WISC00043090

WISC00043100

No Objection

11/9/1992

0268

Memo from Zabransky (WE) to Boston WISC00040518 re: Comment Letters on Proposed Rulemaking VSC-24 Ventilated Storage Cask Letter from Parker (WE) to Jenkins WISC00010676 (PSCW) re: Point Beach Nuclear Plant Independent Fuel Storage Installation PSCW File No. 6630-CE-197 Letter to VSC owners group members WISC00043140 from Lee re Ventilated Storage Cask Owners Group Meeting, October 26 and 27, 1992 w/attachments Letter from Parker (WE) to Hagman WISC00012137 (PSCW) re: Point Beach Nuclear Plant Independent Spent Fuel Storage Facility Project Information for Economic Analyses PSCW No. 6630-CE-197, with enclosure Letter to Link (WE) from Strand (DOE Contracting Officer) HQR3690001

WISC00040553

No Objection

11/11/1992

0269

WISC00010694

No Objection

11/19/1992

0270

WISC00043199

No Objection

11/19/1992

0271

WISC00012144

No Objection

11/20/1992

0272

HQR3690002

No Objection

12/1992

Confidential Work Product. Do Not Reproduce.

Page 30 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 31 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0273 Edison Electric Institute, Utility Nuclear WISC00124249 Waste and Transportation Program, Universal Container System Concept Paper, prepared for the Universal Container System Task Force, prepared by Energy Resources International, Inc., December 1992 0274 Letter from Blythe (Citizens' Utility Board) to Dorr (PSCW) re: Application for Construction Approval of a New Spent Fuel Storage Facility at the Point Beach Nuclear Plant WISC00010697 Bates - End WISC00124283 Government Objections No Objection

Doc Date 12/1/1992

WISC00010724

Relevance

12/6/1992

0275

Letter from Parker (WE) to Jenkins WISC00010668 (PSCW) re: Point Beach Nuclear Plant Independent Fuel Storage Installation PSCW File No. 6630-CE-197 Letter from Watkins (Sec. of Energy) to Johnston, Chairman, Committee on Energy and Natural Resources, U.S. Senate, December 17,1992 WISC00124245

WISC00010671

No Objection

12/17/1992

0276

WISC00124248

No Objection

12/17/1992

0277 0278

Letter to Dums from Martin re WE ISFSI DX 123 (Bronk) docket no. 6630-CE-197 w/attachments Energy Information Administration, Spent Nuclear Fuel Dischargers from US Reactors, 1993 WISC00126711 WISC00126751

No Objection No Objection

1/18/1993 2/1/1993

0279

Letter to Strand (DOE Contracting WISC00000713 Officer) from Link (WE) attaching nine Delivery Commitment Schedules (DCS) Letter from Link (WE) to DOE re: WISC00098938 transmittal of EIA nuclear fuel data form (RW-859) PBNP 1 & 2

WISC00000722

No Objection

2/1/1993

0280

WISC00099056

No Objection

2/3/1993

Confidential Work Product. Do Not Reproduce.

Page 31 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 32 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0281 Nuclear Fuel Data Form RW-859 for Point Beach 1 and 2 0282 0283 0284 Letter to Singh from Martin re Docket No. 6630-CE-197 Bates - Begin HQR3640566 WISC00003415 Bates - End HQR3640682 WISC00003430 HQR0643904 HQR0381926 Government Objections No Objection No Objection No Objection No Objection

Doc Date 2/5/1993 2/18/1993 2/23/1993 3/1/1993

Memo from Milner (DOE) to Kouts re: HQR0643900 Back-up Material for New RW Initiatives U.S. DOE, OCRWM, 1992 Annual HQR0381918 Capacity Report, DOE/RW-0412, March 1993 1995 Acceptance Priority Ranking and Annual Capacity Report Memo from Zabransky (WE) to Link re: Preliminary projection of spent fuel acceptance rate PBNP w/attachment PA102522 WISC00055958

0285 0286

PA102591 WISC00055959

No Objection No Objection

3/1/1993 3/8/1993

0287 0288 0289

Letter to Singh from Martin re WE ISFSI WISC00011065 docket no. 6630-CE-197 w/attachments Tomasoni (DOE) letter to Link (WE) WISC00000910

WISC00011073 WISC00000919 WISC00040624

No Objection No Objection No Objection

3/10/1993 3/10/1993 3/12/1993

Letter from Flamenbaum (NUS) to WISC00040621 Anundson (WE) re: Project Drawing and Specification Package PBNP ISFSI Security Project Letter to Dorr from Porter re PBNP ISFSI Docket no. 6630-CE-197 Letter from Parker (WE) to Jenkins (PSCW) re: PBNP ISFSI Docket no. 6630-CE-197 Letter from Parker (WE) to Jenkins (PSCW) re: ISFSI WISC00014725 WISC00054806

0290 0291

WISC00014726 WISC00054811

No Objection No Objection

3/16/1993 3/17/1993

0292

WISC00129830

WISC00129836

No Objection

3/17/1993

Confidential Work Product. Do Not Reproduce.

Page 32 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 33 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0293 Letter from Isaacs and Blanchard (DOE) WISC00124284 to Barrett (OCRWM), attaching A Proposed Alternative Strategy for the Department of Energy's Civilian Radioactive Waste Management System, prepared by the Task Force on an Alternative Program Strategy, March 31, 1993 0294 Letter from Zabransky (WE) to PSCW re: Independent Spent Fuel Storage Installation - PSCW File No. 6630-CE-197 Citizens Utility Board letter to Radioactive Waste Review Board Letter from Conlon (NUS) to Anundson (WE) re: Scope and Cost for Drawing and Specification Revisions U.S. DOE, OCRWM, 1992 Annual Capacity Report, Revision 1, May 1993 Zabransky (WE) presentation, Update on Multi-Purpose Canister (Universal Container) Systems Utility Perspective Letter from Barrett (DOE) to Cantlon (Nuclear Waste Technical Review Board) re: attached DOE response to Nuclear Waste Technical Review Board's recommendations Withdrawn Letter to Dums from Martin re WE WISC00000849 responses to Citizens Utility Board's 4th data request WISC00000849 WISC00040626 Bates - End WISC00124317 Government Objections No Objection

Doc Date 3/31/1993

WISC00040706

No Objection

4/5/1993

0295 0296

WISC00028267 WISC00040788

WISC00028272 WISC00040792

Authentication, Foundation, Hearsay, Relevance Authentication, Foundation, Hearsay, Relevance No Objection Authentication, Foundation, Relevance No Objection

4/13/1993 4/21/1993

0297 0298

PA102592 HQR0641971

PA102629 HQR0641978

5/1/1993 5/3/1993

0299

HQR0361109

HQR0361114

5/13/1993

0300 0301

Authentication, Foundation, Hearsay, Relevance No Objection 6/18/1993

Confidential Work Product. Do Not Reproduce.

Page 33 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 34 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0302 Withdrawn 0303 0304 0305 0306 Tomasoni (DOE) letter to Link (WE) voiding DCS No. 04-5401-4425 -01 Memo from Anundson (WE) to Maxfield re: Dry Fuel Storage Project Milestones Letter to DOE Contracting Officer from Link (WE) transmitting revised DCS Questions from Representative Hastert re: High Level Waste - Q&A prepared by Alan Brownstein Wisconsin Electric, MSA Permanent Transactions - Control Report Bates - Begin WISC0303-0001 WISC00040793 WISC00000875 HQR0101635 Bates - End WISC0303-0001 WISC00040796 WISC00000876 HQR0101636 Government Objections No Objection No Objection No Objection No Objection Authentication, Foundation, Relevance, Hearsay No Objection No Objection

Doc Date 7/2/1993 7/8/1993 7/16/1993 7/29/1993

0307 0308 0309 0310

WISC00008462

WISC00008492 WISC00124319

8/15/1993 9/2/1993 9/22/1993 9/24/1993

Letter from Barrett (OCRWM) to Shetler WISC00124318 (SMUD) re: DOE acceptance of SNF Tomasoni (DOE) letter to Link (WE) approving revised DCS Letter from Boeshaar (WE) to Hagman (PSCW) re: Point Beach Steam Generator/ISFSl Docket 6630-CE-197, attaching forecast WE memo re: spent fuel pool inventory Letter from Barrett (OCRWM) to Dicks (U.S. House of Representatives) re: DOE acceptance of SNF Memo from Kohrt (WE) re: 24 Feed Feasibility Team Meeting Minutes October 5, 1993 Withdrawn

HQO.19931005.00 HQO.19931005.0 No Objection 10.00001 010.00005 WISC00012161 WISC00012162 No Objection

0311 0312

WISC00020841 WISC00124320

WISC00021014 WISC00124321

No Objection No Objection

9/30/1993 10/4/1993

0313

WISC00061058

WISC00061059

No Objection

10/11/1993

0314

No Objection

Confidential Work Product. Do Not Reproduce.

Page 34 of 115

Case 1:00-cv-00697-JFM

Document 338-2

Filed 08/31/2007

Page 35 of 115
8/31/2007 4:15 PM

Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0315 "DOE Management Strategy and Plan for the Interim Storage of Spent Fuel," presentation by Lake Barrett (DOE) before the Nuclear Waste Technical Review Board Engineered Barrier System, Transportation and Systems Joint Panel Meeting 0316 Bates - Begin HQR0601810 Bates - End HQR0601826 Government Objections Authentication, Foundation, Relevance

Doc Date 11/1/1993

Letter from Parker (WE) to Hagman WISC00012150 (PSCW) re: Point Beach Nuclear Plant Independent Spent Fuel Storage Installation Project Economic Analyses Undepreciated Balance Draft Public Service Commission staff economic analysis, re: cost effective operation of the Point Beach Nuclear Plant WISC00129837

WISC00012152

No Objection

11/4/1993

0317

WISC00129849

No Objection

11/19/1993

0318

The Transportation Operations Project HQV19940228002 HQV1994022800 No Objection Office, Point Beach Nuclear Station 1 21 Units 1 and 2, Wisconsin Electric Power .00001 .00033 Company: Site and Facility Waste Transportation Services Planning Document Memorandum from Dreyfus (DOE) to Sec. of Energy re: Information: Policy Issues Regarding the Civilian Radioactive