Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 1 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0001 Wisconsin Electric Power Company Facility Operating License. Docket No. 50-266: Point Beach Nuclear Plant Unit No. 1 0002 Wisconsin Electric Power Company Facility Operating License. Docket No. 50-301: Point Beach Nuclear Plant Unit No. 2 Bates - Begin KRGWE002102 Bates - End KRGWE002106 Government Objections No Objection
Doc Date 10/5/1970
KRGWE002107
KRGWE002111
No Objection
3/8/1973
0003
Statement of President Jimmy Carter on 00081 Nuclear Power Policy (13 Weekly WE Opp to MSJ Comp. Pres. Doc. 502) Appx Bechtel Power Corp. report re: PBNP Units 1 and 2, Evaluation of the Spent Fuel Pool to Accommodate the Proposed 2360 KIPS Load, Revision 1 WISC00064409
00086 No Objection WE Opp to MSJ Appx WISC00064415 No Objection
4/7/1977
0004
1/16/1978
0005
Letter from McNeer (WE) to Case WISC00025249 (NRC) requesting modification to facility operating license Letter from Grimes (NRC) to All Power Reactor Licensees attaching "Review and Acceptance of Spent Fuel Pool Storage and Handling Applications " Point Beach north pool spent fuel racks calculated weights and pool loadings, revised 10/12/78 Wisconsin Electric Power Company Point Beach Nuclear Plant Unit Nos. 1 and 2 Spent Fuel Storage Expansion Nuclear Material Transaction Report WISC00128740
WISC00025362
No Objection
3/21/1978
0006
WISC00128763
No Objection
4/14/1978
0007
WISC00050814
WISC00050821
No Objection
8/7/1978
0008
WISC00025246
WISC00025362
No Objection
9/29/1978
0009
WISC00059905
WISC00059913
Authentication, Foundation, Relevance
1978; 1985
Confidential Work Product. Do Not Reproduce.
Page 1 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 2 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0010 Letter from Grimes (NRC) to All Power Reactor Licensees attaching modifications to "Review and Acceptance of Spent Fuel Pool Storage and Handling Applications" 0011 Bates - Begin WISC00128764 Bates - End WISC00128767 Government Objections No Objection
Doc Date 1/18/1979
Letter from Schwencer (NRC) to WISC00040332 Burstein (WE) transmitting amendments no. 35 and 41 to Facility Operating License Spent Fuel Storage Requirements - The Y-PA-100827 Need for Away-From-Reactor Storage (DOE/NE-0002) Kurtz (WE) memo to Reed re: WISC00051685 comments to SMP #345, Phase 8 North Pool Rack Installation Letter from Linder (Wachter Associates) WISC00051676 to Dill (WE) re: Point Beach North Pool Installation Report & Notes Spent Fuel Storage - Facts Booklet (DOE/NE - 0005) PA-164418
WISC00040399
No Objection
4/4/1979
0012
Y-PA-100842
No Objection
1/1/1980
0013
WISC00051692
No Objection
1/2/1980
0014
WISC00051684
No Objection
1/7/1980
0015 0016
PA-164483 PA202906
No Objection No Objection
4/1/1980 5/1/1980
DOE, Final Environmental Impact PA202506 Statement, U.S. Spent Fuel Policy (May, 1980) Spent Fuel Storage Requirements - An Update of DOE/NE-0002 (DOE/SR-0007) Memo from Shimon (WE) to Lawler (WE) re: Data For FERC Rate Case ER-81-517 H.R. Rep. No. 97-491 (1982) PNL1684293
0017
PNL1684348
No Objection
03/01/1981
0018
KRGWE002113
KRGWE002114
No Objection
9/1/1981
0019
00087 WE Opp to MSJ Appx
00127 No Objection WE Opp to MSJ Appx
1982
Confidential Work Product. Do Not Reproduce.
Page 2 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 3 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0020 H.R. Rep. No. 97-785 (1982) Bates - Begin 00135 WE Opp to MSJ Appx PNL-168-4349 Bates - End Government Objections 00186 No Objection WE Opp to MSJ Appx PNL-168-4436 No Objection
Doc Date 1982
0021
Spent Fuel Storage Requirements - An Update of DOE/SR-0007 (DOE/RL-82-1) Letter from Burstein (WE) to Rollins (GNS) re: Spent Fuel Transportation and Storage Casks Memo from Fay (WE) to Zach re: Nuclear Power Department Call List EEI's Unsolicited Comments on Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Jan. 25,1983) Memorandum from Morgan (DOE) to NWPA Project Office Personnel re: Implementation of the Nuclear Waste Policy Act of 1982 Proposed Standard Contract for Disposal of Spent Nuclear Fuel and/or High Level Radioactive Waste Letter from Rauch (DOE) to Fay (WE) re: request for administrative information to facilitate signing of contract Letter from Beckham (Georgia Power) to Morgan (DOE) re: Contract for Disposal of Spent Nuclear Fuel and/or High Level Radioactive Waste
6/1/1982
0022
WISC00099272
WISC00099276
No Objection
11/30/1982
0023 0024
WISC00060049 SN048683
WISC00060058 SN048724
No Objection No Objection
01/13/1983 1/25/1983
0025
EDB0030855
EDB0030856
No Objection
1/28/1983
0026
WISC00125498
WISC00125512
No Objection
2/4/1983
0027
COF0030631
COF0030632
No Objection
02/14/1983
0028
PA 189442
PA 189449
No Objection
3/4/1983
Confidential Work Product. Do Not Reproduce.
Page 3 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 4 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0029 Letter from Clayton (Alabama Power) to SN048729 Morgan (DOE) re: Contract for Disposal of Spent Nuclear Fuel and/or High Level Radioactive Waste 0030 Letter from Kearney (Edison Electric Institute) to Morgan (DOE) re: Standard Contract for Disposal of Spent Nuclear Fuel and/or High Level Radioactive Waste (10 CFR Part 961) Letter from Williams (TVA) to Atkinson (DOE) re: draft standard contract Letter from Dean (TVA) to Morgan (DOE) enclosing TVA's comments concerning proposed procedures and proposed draft standard contract ADM002.0270 Bates - End SN048737 Government Objections No Objection
Doc Date 3/4/1983
ADM002.0329
No Objection
3/7/1983
0031 0032
COF0022293 TVA000013
COF0022294 TVA000041
No Objection No Objection
3/7/1983 3/7/1983
0033
Letter from Trosten (LeBoeuf, Lamb) to HQZ19881109013 Morgan (DOE) re: comments on 3 proposed standard contract on behalf of the Electric Utility Companies' Nuclear Transportation Group Letter from Fay (WE) to Atkinson (DOE) WISC00044964 re: Spent Fuel Disposal Contract Point Beach Nuclear Plant Standard Contract for Disposal of Spent HQR0420950 Nuclear Fuel and/or High Level Radioactive Waste, 48 Fed. Reg. 16590 (April 18, 1983) Statement of Robert L. Morgan, Project Director, Nuclear Waste Policy Act Project Office, Department of Energy, Before the Subcommittee on Energy Research and Development, United States Senate EDB-002-0463
HQZ1988110901 33
No Objection
3/7/1983
0034
WISC00044965
No Objection
3/9/1983
0035
HQR0420969
No Objection
04/18/1983
0036
EDB-002-0480
No Objection
5/2/1983
Confidential Work Product. Do Not Reproduce.
Page 4 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 5 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0037 Letter from Kearney (Edison Electric Institute) to Morgan (DOE) re: Standard Contract for Disposal of Spent Nuclear Fuel and/or High Level Radioactive Waste 0038 Letter from Burstein (WE) to Keefe (DOE) re: Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste Bates - Begin ZAB0011344 Bates - End ZAB0011346 Government Objections No Objection
Doc Date 5/20/1983
COF0030625
COF0030626
Incomplete copy
6/3/1983
0039 0040
Letter from Anttonen (DOE) to Stahlkopf HQX.19890512. (EPRI) 0035 Letter from Britt (WE) to Keefe (DOE) re: Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste Standard Contract -- Contract for disposal of spent nuclear fuel, contract no. DE-CR01-83NE44425, between DOE and WE Letter from Robert Morgan (DOE) to Kearney (Edison Electric Institute) Letter from Kraven (TVA) to Keefe (DOE) enclosing signed copies of standard contract (not attached) Letter from Morgan (DOE) to Chilk (NRC) re: storage capacity KRGEW002117
HQX19890512. 0035.00006 KRGEW002117
No Objection No Objection
6/6/1983 6/15/1983
0041
KRGWE002118
KRGWE002199
No Objection
6/16/1983
0042 0043
ZAB0011462 COF0211081
ZAB0011462 COF0211082
No Objection Authentication, Foundation, Relevance No Objection No Objection
6/17/1983 6/24/1983
0044 0045
PD00000001
PD00000004 WISC0003518
6/29/1983 7/1/1983
U.S. DOE, Report on Financing the WISC0003463 Disposal of Commercial Spent Nuclear Fuel and Processed High-Level Radioactive Waste, DOE/S-0020/1, July 1983
Confidential Work Product. Do Not Reproduce.
Page 5 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 6 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0046 Letter from Fay (WE) to DOE re: COF0030926 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 0047 Memorandum from Richard H. PNL1731282 Williamson, NWPA Project Office, to Robert Morgan, Director, NWPA Project Office, et al re: Mission Plan Strategy Overview Letter from Fay (WE) to DOE re: Annex COF0231342 B and Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 Remarks by Morgan (DOE) before the International Atomic Energy Agency, Vienna, Austria (Oct. 12, 1983) EDB0031642 Bates - End COF0030926 Government Objections No Objection
Doc Date 7/29/1983
PNL1731288
No Objection
9/15/1983
0048
COF0231347
No Objection
9/27/1983
0049
EDB0031650
No Objection
10/12/1983
0050
FY 1984 Program Guidance for Nuclear PNL0210233 Waste Fund (NWF) Evaluations (Dec. 2, 1983) Letter from Morgan (DOE) to Stanford (Edison Electric Institute) re: working draft of Mission Plan U.S. DOE, OCRWM, Civilian Radioactive Waste Management Program Mission Plan, Volume 1, Overview and Current Program Plans, Draft, December 20, 1983 Letter from Anttonen (DOE) to Bauer (DOE) re: MRS SN045165
PNL0210268
No Objection
12/2/1983
0051
SN045166
No Objection
12/20/1983
0052
CTR0421065
CTR0421191
No Objection
12/20/1983
0053
HQZ.19870615. 3986
HQZ.19870615. 3986.00004
No Objection
12/30/1983
Confidential Work Product. Do Not Reproduce.
Page 6 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 7 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0054 Memo from Burstein (WE) to Peer Reviewers, Monitored Retrievable Storage Program transmitting copy of letter to Craig (DOE) 0055 Memo from Fletcher (Battelle Pacific Northwest Laboratories) to Hall re: Revised Waste Acceptance Schedule from Draft Mission Plan Bates - Begin CTR0421693 Bates - End CTR0421696 Government Objections No Objection
Doc Date 1/9/1984
PNL0230176
PNL0230196
Relevance, Hearsay, Authenticity, Foundation
1/24/1984
0056
Letter from Fay (WE) to DOE re: COF0030923 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 Proceedings of the 1983 Civilian Radioactive Waste Management Information Meeting (Dec. 12-15, 1983) KRGWE000953
COF0030923
No Objection
1/27/1984
0057
KRGWE000961
Incomplete
2/14/1984
0058
Statement of Michael J. Lawrence (DOE PNL1730225 OCRWM) before the Subcommittee on Energy Conservation and Power, House Committee on Energy and Commerce (Feb. 22, 1984) U.S. DOE OCRWM, Mission Plan for the Civilian Radioactive Waste Management Program, Overview and Current Program Plans, Volumes I and II, DOE/RW-0005 DRAFT, reprinted July 1984 WISC00125652
PNL1730264
No Objection
2/22/1984
0059
WISC001252675
No Objection
4/1/1984
0060
Letter from Fay (WE) to DOE re: COF0030922 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2
COF0030922
No Objection
4/24/1984
Confidential Work Product. Do Not Reproduce.
Page 7 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 8 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0061 Letter from (DOE) to the Honorable J. PA105469 Bennett Johnson, U.S. Senate re: Implementation of Nuclear Waste Policy Act of 1982 0062 0063 0064 0065 Withdrawn Yancey, "Nuclear Waste," Associated Press Petersen and Early, "Waste-Disposal Advances," The Washington Post Letter from Sen. J. Bennett Johnston to Donald Paul Hodel, Sec. of Energy re: concern with nuclear waste program U.S. DOE, Nuclear Waste Fund Fee Adequacy: An Assessment (July 1984) SN044976 ZAB0011329 PA-105467 SN044976 ZAB0011329 PA-105468 Bates - End PA105470 Government Objections No Objection
Doc Date 5/30/1984
No Objection No Objection Relevance, Hearsay, Authenticity, Foundation 6/13/1984 6/15/1984
Relevance, Authenticity, Foundation 6/21/1984
0066 0067
HQR0421212
HQR0421220 YMP0011998
No Objection No Objection
7/1/1984 7/6/1984
Letter from Fay (WE) to Head (DOE) re: YMP0011997 Comments on Draft Mission Plan Civilian Radioactive Waste Management Program Letter from Lawrence (DOE) to B. Rusche (Director, Office of Civilian Radioactive Waste Management) re: Comments on the Draft Mission Plan 01087 WE Opp to MSJ Appx
0068
01090 Relevance, Hearsay Authenticity WE Opp to MSJ - (only regarding contractor Appx documents and marginalia) COF0030920 No Objection
7/23/1984
0069
Letter from Fay (WE) to DOE re: COF0030920 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 DOE, 1984 Annual Review of the 1.0 Mill per kWh Waste Disposal Fee (PNL-5241), prepared by Pacific Northwest Laboratory, Sept. 1984 PNL0290003
7/26/1984
0070
PNL0290080
Relevance, Hearsay, Authenticity (regarding contractor created doc)
9/1/1984
Confidential Work Product. Do Not Reproduce.
Page 8 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 9 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0071 Letter from Hodel (Secretary of Energy) to the Honorable J. Bennett Johnston, U.S. Senate re: disposal of spent nuclear fuel 0072 0073 Transportation Business Plan: Strategy Options Document, DOE/RW-0007 Bates - Begin HQR0430204 Bates - End HQR0430205 Government Objections No Objection
Doc Date 9/7/1984
PA178614
YPA178643 COF0231375
No Objection No Objection
10/1/1984 10/10/1984
Letter from Fay (WE) to DOE re: COF0231375 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 Memo from Zabransky (WE) to Burstein WISC00059915 (WE) re: Review of Draft GAO Report DOE Implementation of NWPA Letter from Fay (WE) to DOE re: COF0030916 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 DOE, Nuclear Waste Fund Fee Adequacy: An Assessment, Feb. 1985 RW-859 - PB2 with transmittal letter Letter from Hall (Utility Nuclear Waste Management Group) to Sharma (DOE) re: visit to DOE Letter from Burstein (WE) to Rusche (DOE) transmitting copy of letter to Schutt re: Monitored Retrievable Storage Withdrawn HQR0421221 MOV.19970714. 0058.00001 NNA.19870418. 003 HQP.19870601. 9493.00302
0074
WISC00059919
No Objection
11/9/1984
0075
COF0030916
No Objection
1/24/1985
0076 0077 0078
HQR0421234 MOV.19970714. 0058.0077 NNA.19870418. 023 HQP.19870601. 9493.00305
No Objection No Objection Relevance, Hearsay
2/1/1985 2/12/1985 3/1/1985
0079
Incomplete
3/1/1985
0080
No Objection
Confidential Work Product. Do Not Reproduce.
Page 9 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 10 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0081 Comments by Sol Burstein, A Utility Perspective on DOE's Implementation of the NWPA 0082 0083 Withdrawn U.S. DOE, The Need for and Feasibility of Monitored Retrievable Storage - A Preliminary Analysis, Apr. 1985 U.S. DOE, OCRWM, Analysis of the Total System Life Cycle Cost for the Civilian Radioactive Waste Management Program, DOE/RW-0024, Apr. 1985 HQR0361385 HQR0361457 Bates - Begin CTR0421800 Bates - End CTR0421812 Government Objections No Objection
Doc Date 3/14/1985
No Objection No Objection 4/1/1985
0084
PA176450
PA176675
No Objection
4/1/1985
0085
Letter from Fay (WE) to Gibbard (DOE) HQR0390848 re: Transmittal of Additional Information, Nuclear Fuel Data Form (EIA Form RW-859) Point Beach Nuclear Plant, Units 1 and 2 Letter from Fay (WE) to Jedry (DOE) re: COF0030906 Request for Relief from Spent Fuel Disposal Fee, Point Beach Nuclear Plant U.S. DOE, OCRWM, Mission Plan for the Civilian Radioactive Waste Management Program, DOE/RW-0005, June 1985 Excerpts from Mission Plan For The Civilian Radioactive Waste Management Program, Vol. 1 Withdrawn PA140163
HQR0390849
Relevance
4/22/1985
0086
COF0030907
Relevance
5/8/1985
0087
PA141779
No Objection
6/1/1985
0088
KRGWE002608
KRGWE002652
No Objection
6/1/1985
0089
No Objection
Confidential Work Product. Do Not Reproduce.
Page 10 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 11 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0090 Letter from Fay (WE) to DOE re: COF0030880 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 0091 Letter from Fay (WE) to DOE re: COF0030878 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 U.S. DOE, OCRWM, The Need for and Feasibility of Monitored Retrievable Storage -- A Preliminary Analysis HQR0364193 Bates - End COF0030883 Government Objections No Objection
Doc Date 6/26/1985
COF0030878
No Objection
7/22/1985
0092
HQR0364252
No Objection
8/1/1985
0093
Letter from Fay (WE) to DOE re: COF0030871 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 U.S. DOE, OCRWM, Transportation Business Plan, DOE/RW-0046 HQR0370258
COF0030871
No Objection
10/10/1985
0094 0095
HQR0370311 COF0231329
No Objection No Objection
1/1/1986 1/23/1986
Letter from Fay (WE) to DOE re: COF0231329 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 U.S. DOE, OCRWM, Nuclear Waste Fund Fee Adequacy: An Assessment, March 1986 Letter from Fay (WE) to DOE re: Transmittal of EIA Nuclear Fuel Data Forms (RW-859) Point Beach Nuclear Plant, Units 1 and 2 HQR0421235
0096
HQR0421251
No Objection
3/1/1986
0097
WISC00060015
WISC00060015
No Objection
3/5/1986
Confidential Work Product. Do Not Reproduce.
Page 11 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 12 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0098 Nuclear Fuel Data Form, RW-859 for Point Beach 1 and 2 with transmittal letter 0099 U.S. DOE, OCRWM, Analysis of Total System Life Cycle Cost of the Commercial High-Level Radioactive Waste Disposal Program, Vol. I, DOE/RW-0047, April 1986 Bates - Begin WISC00060016 Bates - End WISC00060046 Government Objections No Objection
Doc Date 3/6/1986
01201 WE Opp to MSJ Appx
01232 No Objection WE Opp to MSJ Appx
4/1/1986
0100
Letter from Fay (WE) to DOE re: COF0231328 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 1986 Annual Review of the Adequacy of PNL1072117 the 1.0 mill per kWh Waste Disposal Fee Memo from A. Brownstein (DOE) to File HQR-008-0178 re: discussion with Steve Kraft (UMNWG) on June 26, 1989 of April 28, 1987 letter re: interpretation of standard contract and handwritten notes confirming July 07, 1987 discussion with S. Kraft Letter from Fay (WE) to Jedrey (DOE) re: Transmittal of Certified Historical Data, Point Beach Nuclear Plant, Units 1 and 2 COF0231318
COF0231328
No Objection
4/21/1986
0101
PNL1072223
Authentication, Foundation, Hearsay, Relevance No Objection
5/1/1986
0102
HQR-008-0178
6/29/1986
0103
COF0231321
No Objection
7/21/1986
0104
Letter from Fay (WE) to DOE re: COF0231322 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units I and 2
COF0231327
No Objection
7/25/1986
Confidential Work Product. Do Not Reproduce.
Page 12 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 13 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0105 U.S. DOE, Idaho Operations Office, WISC00124100 Request for Proposal (RFP) No. DE-RP07-861D12625 for Development of From-Reactor Casks, To Prospective Offerors, July 31, 1986 0106 S. Hearing Rpt. No. 100-230, pt. 2 (1987) S. Rep. No. 100-152 (1987) 01214 WE Opp to MSJ Appx 00223 WE Opp to MSJ Appx 00260 WE Opp to MSJ Appx Bates - End WISC00124101 Government Objections No Objection
Doc Date 7/31/1986
01222 No Objection WE Opp to MSJ Appx 002259 No Objection WE Opp to MSJ Appx 00290 No Objection WE Opp to MSJ Appx HQR0255200 No Objection
1987
0107
1987
0108
H.R. Rep. No. 100-425, pt. 1 (1987)
1987
0109
U.S. DOE, OCRWM, Draft Mission Plan HQR0255140 Amendment, DOE/RW-0128, January, 1987 Withdrawn Letter from Fay (WE) to DOE re: COF0030845 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 Letter to WE from EDE Inc. re: Storage Tanks Nuclear Fuel Data Form RW-859 for Point Beach 1 with transmittal letter Nuclear Fuel Data Form RW-859 for Point Beach 2 with transmittal letter WISC00129787 HQR3640041 HQR3640057
1/1/1987
0110 0111
No Objection COF0030845 No Objection 1/19/1987
0112 0113 0114
WISC00129788 HQR3640056 HQR3640070
Authentication, Foundation, Hearsay, Relevance No Objection No Objection
1/27/1987 2/9/1987 2/9/1987
Confidential Work Product. Do Not Reproduce.
Page 13 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 14 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0115 U.S. DOE, OCRWM, Monitored Retrievable Storage Submission to Congress, Volume I: The Proposal, March 1987 0116 Statement of Sol Burstein, Vice Chairman, Wisconsin Electric Power Co., on Behalf of Edison Electric Institute, American Nuclear Energy Council, Utility Nuclear Waste Management Group, Electric Utility Companies' Nuclear Transportation Group, Atomic Indus Meeting Notes of The Utility Nuclear Waste Management Group High-Level Waste/Spent Fuel Storage Working Group Letter from Kearney (Edison Electric Institute) to Rusche (OCRWM) re: Draft Mission Plan Amendment Withdrawn Letter from Fay (WE) to DOE re: COF0030838 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 U.S. DOE, OCRWM, Preliminary Analysis of Total System Life Cycle Cost of the Civilian High-Level Radioactive Waste Disposal Program, Final Draft, April 27, 1984 PNL0201491 COF0030838 Bates - Begin PA171880 Bates - End PA171922 Government Objections No Objection
Doc Date 3/1/1987
EDB0030434
EDB0030442
No Objection
3/19/1987
0117
SN000228
SN000235
No Objection
3/25/1987
0118
PA142473
PA142480
No Objection
4/3/1987
0119 0120
No Objection No Objection 4/16/1987
0121
PNL0201657
Authentication, Foundation, Hearsay, Relevance
4/27/1987
0122
Letter from Kraft (Utility Nuclear Waste HQR0080179 Management Group) to Jedrey (DOE) re: ruling interpreting Standard Contract
HQR0080192
No Objection
4/28/1987
Confidential Work Product. Do Not Reproduce.
Page 14 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 15 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0123 U.S. DOE, OCRWM, Annual Capacity Report, June 1987 0124 Bates - Begin HQR0012705 Bates - End HQR0012792 HQR0032142 Government Objections No objection No Objection
Doc Date 6/1/1987 6/1/1987
U.S. DOE, OCRWM, OCRWM Mission HQR0031621 Plan Amendment, DOE/RW-0128, June 1987 U.S. DOE, OCRWM, Nuclear Waste Fund Fee Adequacy: An Assessment, June 1987 U.S. DOE, OCRWM, Analysis of the Total Life Cycle Cost for the Civilian Radioactive Waste Management Program, Vol. II, DOE/RW-0047, June 1987 U.S. DOE, OCRWM, Analysis of the Total System Life Cycle Cost for the Civilian Radioactive Waste Management Program, Vol. I, DOE/RW-0047, June 1987 U.S. DOE, OCRWM Annual Capacity Report, June 1987 HQR0421252
0125
HQR0421268
No Objection
6/1/1987
0126
PA176850
PA176998
No Objection
6/1/1987
0127
PA176705
PA176849
No Objection
6/1/1987
0128 0129
PA103152
PA103171 PA142137
No Objection No Objection
6/1/1987 6/1/1987
U.S. DOE, OCRWM Mission Plan PA142069 Amendment with Comments on the Draft Amendment and Responses to the Comments, June 1987 Letter from Fay (WE) to Jedrey (DOE) re: Revision to Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 COF0030815
0130
COF0030835
No Objection
6/11/1987
Confidential Work Product. Do Not Reproduce.
Page 15 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 16 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0131 U.S. DOE, OCRWM, 1987 Annual Review of the Adequacy of the 1.0 mill per kWh Waste Disposal Fee, PNL-6288, Prepared by Pacific Northwest Laboratory, July 1987 0132 Memo from Burstein (WE) to Britt (WE) and McNeer (WE) re: Nuclear Waste Fund Appropriations Post Hearing Questions and Answers Relating to the July 16, 1987 Hearing Before the Senate Sub-Committee on Energy and Natural Resources - United States Senate (Witness: Ben Rusche), 07/16/87 Testimony of Sol Burstein, Vice Chairman Wisconsin Electric Power Company, on behalf of Edison Electric Institute American Nuclear Energy Council, etc. on the Nuclear Waste Program and Proposed Legislation before the Committee on Energy and Natural Resour Memo from Milner (DOE) to Barrett re: Proposed Assumptions and Case List for 1988 TSLCC with attachments WE memo re: spent fuel pool inventory Bates - Begin PNL1071901 Bates - End PNL1072003 Government Objections Authentication, Foundation, Hearsay, Relevance
Doc Date 7/1/1987
WISC00000584
WISC00000584
No Objection
7/6/1987
0133
HQR0100804
HQR0100853
No Objection
7/16/1987
0134
MOV.19990212. 0040.00001
MOV.19920212. 0040.00008
No Objection
7/17/1987
0135
PNL1020359
PNL1020377
No Objection
9/9/1987
0136 0137
WISC00020172
WISC00020295 PNL0460255
No Objection No Objection
9/11/1987 10/2/1987
Letter from Jedrey (DOE) to Kraft (Utility PNL0460251 Nuclear Waste Management Group) re: request for clarification of Standard Contract Wisconsin Electric Revised Budget Status Report WISC00060964
0138
WISC00060964
No Objection
12/30/1987
Confidential Work Product. Do Not Reproduce.
Page 16 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 17 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0139 Letter from Fay (WE) to DOE re: COF0030810 Standard Remittance Advice for Nuclear Waste Fund Disposal Services, Contract DE-CR01-83NE44425 Point Beach Nuclear Plant, Units 1 and 2 0140 Memo from Samuel Rousso (DOE) re: Assumptions for 1988 TSLCC with attached revised assumptions Nuclear Fuel Data Form RW-859 for Point Beach 1 with transmittal letter Nuclear Fuel Data Form RW-859 for Point Beach 2 with transmittal letter Letter from Kraft (Utility Nuclear Waste Management Group (DOE) to Rousso (DOE) re: review of Nuclear Waste Fund Fee Adequacy: An Assessment Annual Report of the Nuclear Transportation Group, 1988-1989 Program Memo from Bratcher (WE) to Fay, Boucher, Boston, and Britt re: RD&D Project Authorization - Spent Fuel Storage Letter from Fay (WE) to Lambert (Electric Power Research Institute) re: Project Proposal - Spent Fuel Storage Demonstration Project Letter from Rousso (DOE) to Kraft (Utility Nuclear Waste Management Group) re: disposal fee adequacy Withdrawn PNL1080507 Bates - End COF0030810 Government Objections No Objection
Doc Date 1/21/1988
PNL1080529
No Objection
1/28/1988
0141 0142 0143
HQR3640071 HQR3640100 HQX8804070008
HQR3640099 HQR3640126
No Objection No Objection
2/8/1988 2/8/1988 4/5/1988
HQX8804070008 No Objection
0144
HQX.19880711. 0115 WISC00061014
HQX.19880711. 0115.00012 WISC00061026
No Objection
5/1/1998
0145
No Objection
5/6/1988
0146
WISC00061027
WISC00061029
No Objection
5/12/1988
0147
HQO8805230013
HQO8805230013 No Objection
5/23/1988
0148
No Objection
Confidential Work Product. Do Not Reproduce.
Page 17 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 18 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0149 U.S. DOE, OCRWM, Annual Capacity Report, DOE/RW-0191, 1988 0150 0151 0152 U.S. DOE, Draft 1988 Mission Plan Amendment Withdrawn Appendix C, EPRI RP3073-I, General WISC00060697 Services Agreement between Wisconsin Electric Power Company and Pacific Sierra Nuclear Associates Memo from Mroczka (Northeast Nuclear WISC01530001 Energy Co.) to NRC re: Millstone Nuclear Power Station, Unit No. 1 Proposed Change to Technical Specifications Spent Fuel Pool Capacity Expansion with attachments WE memo re: spent fuel pool inventory U.S. DOE Document Route Slip re: WE Over/Under-Payment of One-Time Fee WISC00020297 COF0231271 WISC00060709 Bates - Begin PA102885 HQR0255201 Bates - End PA102975 HQR0255309 Government Objections No Objection No Objection No Objection No Objection
Doc Date 6/1/1988 6/1/1988
6/24/1988
0153
WISC01530212
A/F, Hearsay
6/24/1988
0154 0155 0156
WISC00020348 COF0231271 WISC00001218
No Objection No Objection No Objection
8/8/1988 8/21/1988 8/26/1988
Letter from Fay to Kay (DOE) re: 1988 WISC00001217 Draft Mission Plan Amendment (53 Fed. Reg. 22482) Letter from Kearney (Edison Electric Institute) to Kay (DOE) re: 1988 Draft Mission Plan Amendment Letter from Bruce E. Hunt, Manager, Nuclear Fuel, Southern Company Services, Inc., to Robert Woytko, Contracting Officer, Department of Energy re: impact draft mission plan HQR0061154
0157
HQR0061156
No Objection
8/29/1988
0158
HQR0080228
HQR0080231
Authentication, Foundation, Hearsay, Relevance
9/23/1988
Confidential Work Product. Do Not Reproduce.
Page 18 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 19 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0159 Letter from Bruce E. Hunt, Manager, Nuclear Fuel, Southern Company Services, Inc., to Charles Head, Department of Energy re: comments on use of dry cask storage 0160 0161 Letter from Forsberg (DOE) Letter from Pennington (Transnuclear) to Zabransky (WE) re: TN 24 Site Specific and Handling Information Bates - Begin PNL1721935 Bates - End PNL1721938 Government Objections Authentication, Foundation, Hearsay, Relevance
Doc Date 10/26/1988
HQX.881228. 0005 WISC00033239
HQX.19881228. 0005.00032 WISC00033239
No Objection No Objection
12/16/1988 1/19/1989
0162
Letter from Lee (NAC) to Zabransky WISC00034377 (WE) re: Topical Safety Analysis Report (TSAR) for the NAC Storage/Transport (S/T) Cask Nuclear Fuel Data Form RW-859 for Point Beach 1 and 2 with transmittal letter Letter from Blackmon (Duke Engineering) to Zabransky (WE) re: Oconee Nuclear Station Independent Spent Fuel Storage Installation Licensing Documents CC-89-032 File: MTS-2026 Letter from Anderson (General Nuclear Systems, Inc.) to Zabransky (WE) re: CASTOR X/28-33 Letter from Berryman (Virginia Power) to Stein (DOE) re: program to develop dual purpose storage/transport casks U.S. DOE, Amendment of Solicitation/Modification of Contract for Contract No. DE-CRO1-83NE44425 HQR3640239
WISC00034377
No Objection
1/26/1989
0163
HQR3640295
No Objection
2/3/1989
0164
WISC00033315
WISC00033316
No Objection
2/7/1989
0165
WISC00033317
WISC00033317
No Objection
2/8/1989
0166
WISC00124202
WISC00124204
No Objection
2/27/1989
0167
COF0030667
COF0030672
No Objection
3/24/1989
Confidential Work Product. Do Not Reproduce.
Page 19 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 20 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0168 DOE/TWG Meeting Report 0169 U.S. DOE, OCRWM, Analysis of the Total System Life Cycle Cost for the Civilian Radioactive Waste Management Program, DOE/RW-0236, May 1989 Wisconsin Electric, Project Requisition Summary, Budget Item 840330, Additional Spent Fuel Storage Bates - Begin MOL.19970929. 0051 PA177145 Bates - End MOL.19970929. 0051.00038 PA177334
Government Objections Doc Date Authentication, Foundation, Hearsay 4/25/1989 No Objection 5/1/1989
0170
KRGWE002225
KRGWE002226
No Objection
5/3/1989
0171
Memo from Fay (WE) to Britt and WISC00000457 McNeer re: Work Order Requisition Design, Licensing, Construction and Operation of an Independent Spent Fuel Storage Installation (ISFSI) Point Beach Nuclear Plant Memo from Nunez (Pacific Sierra Nuclear Associates) to distribution re: Revised Meeting Minutes, Ventilated Storage Cask (VSC) Demonstration Project Technical Management Committee Meeting, April 13, 1989 DOE OCRWM, MRS System Study Summary Report, June 1989 The DOE Position on the MRS Facility Draft 1989 Annual Capacity Report Withdrawn WISC00032032
WISC00000465
No Objection
5/3/1989
0172
WISC00032041
No Objection
5/15/1989
0173 0174 0175 0176
HQR0061736 HQR0370409 EDB0010468
HQR0061885 HQR0370440 EDB0010487
No Objection No Objection
6/1/1989 6/1/1989
Authentication, Foundation, Hearsay 6/1/1989 No Objection
Confidential Work Product. Do Not Reproduce.
Page 20 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 21 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0177 Letter from Nunez (Pacific Sierra Nuclear) to Creer (PNL) re: Review/Approval of Revised PSN Technical Project Plan for PSN/DOE Concrete Cask Cooperative Agreement with enclosure 0178 Statement by Shimon (WE) at Transportation Coordination Group Meeting WE memo re: spent fuel pool inventory Letter from Kraft (Edison Electric Institute) to Stein (DOE) re: dual purpose cask development program Bates - Begin WISC00032042 Bates - End WISC00032060 Government Objections Authentication, Foundation, Hearsay, Relevance
Doc Date 6/23/1989
MOV.19961031. 0086 WISC00020357 WISC00124205
MOV.19961031. 0086.00007 WISC00020457 WISC00124212
No Objection
07/25-26 1989 8/4/1989 9/20/1989
0179 0180
No Objection Authentication, Foundation, Hearsay, Relevance Authentication, Foundation
0181
Monitored Retrievable Storage HQR0363992 Commission, Nuclear Waste: Is There a Need for Federal Interim Storage? Report of the Monitored Retrievable Storage Commission, Nov. 1, 1989 Withdrawn U.S. DOE, Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program, DOE/H W-0247, November 1989 Letter from Boyle (NRC) to Mroczka (Connecticut Yankee) re: Issuance of Amendment (TAC No. 68157) with enclosures YMP0020183
HQR0364185
11/1/1989
0182 0183
No Objection YMP0020212 No Objection 11/1/1989
0184
WISC0184-0001
WISC0184-0025
No Objection
11/27/1989
0185
Letter from Kouts (DOE) with minutes of MOV.19961021. the Transportation Coordination Group 0039 meeting in Chicago
MOV.19961021. 0039.00073
No Objection
11/29/1989
Confidential Work Product. Do Not Reproduce.
Page 21 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 22 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0186 DOE MRS System Studies, Summary Report and Additional Analyses, INMM Spent Fuel Seminar VII 0187 0188 0189 0190 Nuclear Fuel Data Form RW-859 for Point Beach 1 with transmittal letter Nuclear Fuel Data Form RW-859 for Point Beach 2 with transmittal letter Transportation Coordination Group Meeting Minutes U.S. DOE, OCRWM, Waste Management System Description Document, DOE/RW-0270P, March 1990 Statement by Shimon (WE) at Western Interstate Energy Board High-Level Waste Committee Meeting Letter from Massey (Pacific Sierra Nuclear) to Collantes (DOE) re: Notice of DOE-ID's Default on Contract DE-FC06-88RLl1394 Massey letter to DOE Memo from Stein to Isaacs re: Review of Predecisional Draft, Nuclear Waste Negotiator (NWN) Support Information Book Letter from Rueter (DOE) to Fay (WE) re: non-issuance of ACR for 1989 Commercial Spent Fuel Management and Concrete Cask Testing Programs Monthly Progress Report Bates - Begin ERINSP02126 WISC00131072 HQR3640348 HQR3640375 MOL.19971023. 0003 PNL0261631 Bates - End ERINSP02147 WISC00131072 HQR3640374 HQR3640401 MOLl9971023. 0003.00015 PNL0261675 Government Objections No Objection
Doc Date 1/1/1990
No Objection No Objection No Objection No Objection
1/26/1990 1/26/1990 2/21/1990 3/1/1990
0191
MOL.19980529. 0009 WISC00034671
MOL.19980529. 0009.00011 WISC00034671
No Objection
3/6/1990
0192
Authentication, Foundation, Hearsay, Relevance
4/3/1990
0193 0194
WISC00034672 ERINSP02148 WISC00131072
WISC00034672 ERINSP02159 WISC0131072
Authentication, Foundation, Hearsay, Relevance
4/4/1990
Authentication, Foundation, Hearsay 4/19/1990
0195 0196
COF0030798 WISC00032439
COF0030798 WISC00032489
No Objection Authentication, Foundation, Hearsay, Relevance
4/27/1990 05/1990
Confidential Work Product. Do Not Reproduce.
Page 22 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 23 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0197 Facility Interface Capability Assessment HQR0442620 (FICA) Project, Cask-Handling Assessment Point Beach Units 1 and 2 0198 Letter from Carr (Pacific Sierra Nuclear) WISC00040419 to Zabransky (WE) re: Calculation of Fuel Temperature Limits for the VSC-24 Contract No. 170564 between WE and Sierra Nuclear Corporation for ISFSI work WISC00009444 Bates - End HQR0442631
Government Objections Doc Date Authentication, Foundation, Hearsay 5/1/1990
WISC00040436
No Objection
5/10/1990
0199
WISC00009451
No Objection
7/25/1990
0200
Letter from Parker (WE) to Jenkins WISC00028159 (Public Service Commission of Wisconsin) re: PBNP ISFSI Environmental Assessment by the NRC Letter from Kouts (DOE) with Minutes of MOV.19961021. the Transportation Coordination Group 0044 Meeting Withdrawn WE memo re: spent fuel pool inventory Letter from Schwartz (ERI) to Shimon (WE), et al. transmitting DOE justification for preliminary cask design selection U.S. DOE, OCRWM, Comment Response Document for the Secretary of Energy's "Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program," Nov. 1990 U.S. DOE, OCRWM, Nuclear Waste Fund Fee Adequacy: An Assessment, DOE/RW-0291P WISC00020459 WISC00040252
WISC00028159
No Objection
8/27/1990
0201
MOV.19961021. 0044.00025
No Objection
9/19/1990
0202 0203 0204
No Objection WISC00020565 WISC00040275 Relevance, Hearsay 10/16/1990 10/19/1990
0205
HQR0362077
HQR0362188
No Objection
11/1/1990
0206
IDF0022292
IDF0022317
No Objection
11/1/1990
Confidential Work Product. Do Not Reproduce.
Page 23 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 24 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0207 Letter from Schwartz (ERI) to Shimon (WE), et al. transmitting comments on transportation cask preliminary design reports 0208 Midwestern High-Level Radioactive Waste Committee Summary of Proceedings Statement of Shimon (WE) to Nuclear Waste Technical Review Board Letter from Chechilnitsky (Sierra Nuclear) to Zabransky (WE) transmitting design and fabrication specification and review and evaluation documents U.S. DOE, OCRWM, Annual Capacity Report, DOE/RW-0294P, December 1990 Withdrawn U.S. DOE, OCRWM, Preliminary PNL1071603 estimates of the total-system cost for the restructured program: an addendum to the May 1989 analysis of the total system life cycle cost for civilian radioactive waste management program, DOE/RW-0295P, December 1990 U.S. DOE OCRWM, Annual Capacity Report, December 1990 PA102761 PNL1071705 Bates - Begin WISC00129789 Bates - End WISC00129824
Government Objections Doc Date Relevance, Hearsay, Authentication, 11/8/1990 Foundation
HQO.19991119. 0012 HQX.19910125. 0008 WISC00040447
HQO.19991119. 0012.00011 HQX.19910125. 0008.00009 WISC00040472
Relevance, Hearsay, Authentication, 11/15/1990 Foundation Relevance, Hearsay, Authenticity and Foundation 11/19/1990
0209 0210
Relevance, Hearsay, Authentication, 11/26/1990 Foundation
0211
HQR0020576
HQR0020699
No Objection
12/1/1990
0212 0213
No Objection No Objection 12/1/1990
0214
PA102884
No Objection
12/1/1990
Confidential Work Product. Do Not Reproduce.
Page 24 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 25 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0215 Pacific Northwest Laboratory under PNL0412110 DOE Contract No. DE-AC06-76RLO 1830, "Determination of Cost Effective Waste Management System Receipt Rates," presented at Second Annual High-Level Radioactive Waste Management conference, January 1991 0216 U.S. House of Representative Report WISC00124198 101-536, Conference Report for Energy and Water Development Appropriations Bill, 1991 Midwestern High-Level Radioactive Waste Transportation Primer (Draft) Nuclear Fuel Data Form RW-859 for Point Beach 2 with transmittal letter Nuclear Fuel Data Form RW-859 for Point Beach 1 with transmittal letter HQX.19910313. 0012 HQR03640431 HQR3640402 Bates - End PNL0412119 Government Objections Relevance, Hearsay, Authenticity
Doc Date 1/1/1991
WISC00124201
No Objection
1/1/1991
0217 0218 0219 0220
HQX.19910313. 0012.00104 HQR03640450 HQR3640430 WISC00060686
Relevance, Hearsay, Authenticity No Objection No Objection No Objection
2/1/1991 2/14/1991 2/14/1991 4/23/1991
Memo from Zabransky (WE) to Goetsch WISC00060672 re: transmitting executed General Service Agreement with Sierra Nuclear Corporation Letter to Fay from DOE re The Standard WISC00059938 Contract for Disposal of Spent Nuclear Fuel and / or High - Level Radioactive Waste Memo to Boston from Lipke re: DOE Acceptance Priority Ranking Memo from McDuffie to Langstaff Re: Recommended DOE Positions on 18 Contract Implementation Issues WISC00000210 NET0010715
0221
WISC00059973
No Objection
5/15/1991
0222 0223
WISC00000210 NET0010725
No Objection Relevance, Hearsay, Authenticity
5/31/1991 6/28/1991
Confidential Work Product. Do Not Reproduce.
Page 25 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 26 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0224 Letter from Fay (WE) to Reuter (DOE) re: Review of Draft Acceptance Priority Ranking 0225 0226 0227 Spent Fuel Storage / Transport / Disposal Containers Canisters in the Spent Fuel Pit Isaacs (DOE) letter, forwarding discussion notes from the Third Strategic Principles Workshop, which was held in Denver, Colorado, on April 3-4, 1991 Letter from Willington J. Lee (SNC) to D. Zabransky (WE) re: Proposal to Develop a Preliminary Cask Design for the Transportation of Multi-Element Sealed Containers (SNC-ATL-91-045) General Accounting Office, Nuclear Waste: Operation of Monitored Retrievable Storage Facility is Unlikely by 1998, Sept. 1991 Martin Marietta Energy Systems, lnc., Site and Facility Waste Transportation Services Planning Document, Point Beach Nuclear Plant Unit 1, Wisconsin Electric Power Company, Draft, Revision 0 Memo from Zabransky (WE) re: Draft Environmental Screening Report Independent Spent Fuel Storage Installation Point Beach Nuclear Plant with attachment Bates - Begin WISC00060048 Bates - End WISC00060048 Government Objections No Objection
Doc Date 7/8/1991
WISC00023045 WISC00023083 WISC00028342
WISC00023049 WISC00023083 WISC00028398
Relevance, Hearsay, Authentication, 7/8/1991 Foundation No Objection No Objection 7/17/1991 8/1/1991
0228
WISC00129825
WISC0129829
No Objection
8/7/1991
0229
WISC00003080
WISC00003134
No Objection
9/1/1991
0230
HQX19910918. 0011.00001
HQX19910918. 0011.00059
Hearsay, Authentication, Foundation 9/1/1991
0231
WISC00055844
WISC00055915
No Objection
9/4/1991
Confidential Work Product. Do Not Reproduce.
Page 26 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 27 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0232 Memo from Anundson (WE) re: Boraflex Surveillance Program, attachments 0233 Bates - Begin WISC00040883 Bates - End WISC00040977 Government Objections No Objection
Doc Date 10/14/1991
Memo from Nickels (WE) re: Annual WISC00020355 Inventory of Fuel Assemblies and Other WISC0 Devices, attachments Memo to Maxfield from Bronk re Annual WISC00020567 Inventory of Fuel Assemblies and Other Devices w/attachments Withdrawn Letter from Porter (WE) to Reynolds (PSCW) re: application for authority to construct and place in utility operation an ISFSI at Point Beach U.S. DOE, OCRWM, Annual Capacity Report, DOE-RW-0331P, December 1991 U.S. DOE, OCRWM, 1991 Acceptance Priority Ranking, Dec. 1991 Withdrawn Nuclear Power Department Project Administrator's Manual ACR Issues Status Report, Dec. 31, 1991 Nuclear Fuel Data Form RW-859 for Point Beach 1 with transmittal letter Nuclear Fuel Data Form RW-859 for Point Beach 2 with transmittal letter Withdrawn WISC00054812 HQR0030314 HQR3640460 HQR3640533 WISC00014727
WISC00020355 WISC0 WISC00020691
No Objection
10/17/1991
0234
No Objection
10/17/1991
0235 0236
No Objection WISC00014825 No Objection 11/15/1991
0237
HQR0040354
HQR0040417
No Objection
12/1/1991
0238 0239 0240 0241 0242 0243 0244
HQR0040426
HQR0040461
No Objection Incomplete
12/1/1991
WISC00054917 HQR0030315 HQR3640532 HQR3640565
No Objection Hearsay, Authenticity, Foundation No Objection No Objection
12/26/1991 12/31/1991 2/14/1992 2/14/1992
Confidential Work Product. Do Not Reproduce.
Page 27 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 28 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0245 Letter from Porter (WE) to Dums (Citizens Utility Board) re: PBNP ISFSI Docket No. 6630-CE-197 CUB Data Request #1 0246 Letter from M. Detmer, Contracting Officer, Department of Energy, to R.G. Cocherell, Manager, Nuclear Fuel Services, Southern Nuclear Operating Company re: DCSs with attachment of DCS instruction Letter from Detmer (DOE) to Fay (WE) re: Standard Contract for Disposal of Spent Nuclear Fuel Letter to Anundson from SNC re Cost and Schedule Estimate for Clean-Up of the Point Beach 1/2 Spent Fuel Pool "Performance Testing and Analyses of the VSC-17 Ventilated Concrete Cask, Final Report," prepared for Wisconsin Electric and DOE, May 1992 Memo from Palmer (WE) to Zach re: PBNP Spent Fuel Storage Facility w/attachments Letter from Porter (WE) to Dums (Citizens Utility Board) re: PBNP ISFSI Docket No. 6630-CE-197 CUB Data Request #2 Withdrawn Letter from Weydert (WE) to Creighton WISC000040982 (Westinghouse Electric) re: Spent Fuel Pool Inventory Point Beach Unit 1 Cycle 21 Plans for Fuel Assembly Reinsertion WISC000041008 Bates - Begin WISC00000924 Bates - End WISC00000980 Government Objections No Objection
Doc Date 2/28/1992
HQR0012066 HQR0012045
HQR0012067 HQR0012051
Relevance
3/4/1992
0247
HQR0012168
HQR0012169
No Objection
3/4/1992
0248
WISC00040978
WISC00040981
Relevance, Hearsay, Authentication, 3/24/1992 Foundation Hearsay, Authentication, Foundation 5/1/1992
0249
HQR3730426
HQR3730594
0250
WISC00033407
WISC00033415
No Objection
5/6/1992
0251
WISC00003431
WISC00003438
No Objection
5/21/1992
0252 0253
No Objection No Objection 5/27/1992
Confidential Work Product. Do Not Reproduce.
Page 28 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 29 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0254 Memo from Link re Spent Fuel Dry Storage Point Beach Nuclear Plant 0255 Letter from Massey (Sierra Nuclear) to Zabransky (WE) re: WE-SNC Licensing Agreement PSCW Notice Point Beach Nuclear Plant Modification Request 92-120 Bates - Begin WISC00056027 WISC00040326 Bates - End WISC00056028 WISC00040327 Government Objections No Objection No Objection
Doc Date 5/29/1992 7/1/1992
0256 0257 0258 0259
WISC00011131 WISC00085906
WISC00011134 WISC00087026 WISC00056030 WISC00125881
No Objection No Objection No Objection No Objection
7/16/1992 7/20/1992 8/20/1992 9/21/1992
Link (WE) memo re: Construction of Dry WISC00056029 Storage Facility Letter to DOE Contracting Officer from Link (WE) attaching Delivery Commitment Schedules (DCS) for ten spent nuclear fuel deliveries to DOE beginning in 1998 WE memo re: spent fuel pool inventory Letter to Jenkins (PSCW) from Porter (WE) re: application for authority to replace the Unit 2 steam generators at the Point Beach Nuclear Plant WISC00125871
0260 0261
WISC00020693 WISC00014672
WISC00020839 WISC00014687
No Objection No Objection
9/28/1992 9/30/1992
0262
Supko (ERI) letter to Alissi (Edison ERINSP-01398 Electric) transmitting Spent Fuel WISC00131072 Acceptance Rates and its Affect [sic] on Utility Spent Fuel Storage and Decommissioning Costs, prepared by ERI, ERI-0439 DRAFT, October 1992 Massey (Sierra Nuclear) letter to Zabransky (WE) with attached invoice WISC00043124
ERINSP-011461 WISC00131072
Hearsay, Authentication, Foundation 10/6/1992
0263 0264
WISC00043134 WISC00011159
No Objection No Objection
10/9/1992 10/13/1992
Email from Zabransky (WE) to Link WISC00011159 (forwarded to Yakich and Knitter) re: Dry Cask EIS Meeting
Confidential Work Product. Do Not Reproduce.
Page 29 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 30 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0265 Sierra Nuclear Corp. invoice for receipt of equipment at Point Beach 0266 Letter from Martin (Quarles & Brady) to Dorr (PSCW) re: Citizens Utility Board Intervenor Compensation Request Contract For Delivery of The Ventilated Storage Cask to the Point Beach Nuclear Plant Between Sierra Nuclear Corporation and Wisconsin Electric Power Company Bates - Begin WISC00008830 WISC00011088 Bates - End WISC00008830 WISC00011090 Government Objections No Objection No Objection
Doc Date 10/22/1992 10/26/1992
0267
WISC00043090
WISC00043100
No Objection
11/9/1992
0268
Memo from Zabransky (WE) to Boston WISC00040518 re: Comment Letters on Proposed Rulemaking VSC-24 Ventilated Storage Cask Letter from Parker (WE) to Jenkins WISC00010676 (PSCW) re: Point Beach Nuclear Plant Independent Fuel Storage Installation PSCW File No. 6630-CE-197 Letter to VSC owners group members WISC00043140 from Lee re Ventilated Storage Cask Owners Group Meeting, October 26 and 27, 1992 w/attachments Letter from Parker (WE) to Hagman WISC00012137 (PSCW) re: Point Beach Nuclear Plant Independent Spent Fuel Storage Facility Project Information for Economic Analyses PSCW No. 6630-CE-197, with enclosure Letter to Link (WE) from Strand (DOE Contracting Officer) HQR3690001
WISC00040553
No Objection
11/11/1992
0269
WISC00010694
No Objection
11/19/1992
0270
WISC00043199
No Objection
11/19/1992
0271
WISC00012144
No Objection
11/20/1992
0272
HQR3690002
No Objection
12/1992
Confidential Work Product. Do Not Reproduce.
Page 30 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 31 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0273 Edison Electric Institute, Utility Nuclear WISC00124249 Waste and Transportation Program, Universal Container System Concept Paper, prepared for the Universal Container System Task Force, prepared by Energy Resources International, Inc., December 1992 0274 Letter from Blythe (Citizens' Utility Board) to Dorr (PSCW) re: Application for Construction Approval of a New Spent Fuel Storage Facility at the Point Beach Nuclear Plant WISC00010697 Bates - End WISC00124283 Government Objections No Objection
Doc Date 12/1/1992
WISC00010724
Relevance
12/6/1992
0275
Letter from Parker (WE) to Jenkins WISC00010668 (PSCW) re: Point Beach Nuclear Plant Independent Fuel Storage Installation PSCW File No. 6630-CE-197 Letter from Watkins (Sec. of Energy) to Johnston, Chairman, Committee on Energy and Natural Resources, U.S. Senate, December 17,1992 WISC00124245
WISC00010671
No Objection
12/17/1992
0276
WISC00124248
No Objection
12/17/1992
0277 0278
Letter to Dums from Martin re WE ISFSI DX 123 (Bronk) docket no. 6630-CE-197 w/attachments Energy Information Administration, Spent Nuclear Fuel Dischargers from US Reactors, 1993 WISC00126711 WISC00126751
No Objection No Objection
1/18/1993 2/1/1993
0279
Letter to Strand (DOE Contracting WISC00000713 Officer) from Link (WE) attaching nine Delivery Commitment Schedules (DCS) Letter from Link (WE) to DOE re: WISC00098938 transmittal of EIA nuclear fuel data form (RW-859) PBNP 1 & 2
WISC00000722
No Objection
2/1/1993
0280
WISC00099056
No Objection
2/3/1993
Confidential Work Product. Do Not Reproduce.
Page 31 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 32 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0281 Nuclear Fuel Data Form RW-859 for Point Beach 1 and 2 0282 0283 0284 Letter to Singh from Martin re Docket No. 6630-CE-197 Bates - Begin HQR3640566 WISC00003415 Bates - End HQR3640682 WISC00003430 HQR0643904 HQR0381926 Government Objections No Objection No Objection No Objection No Objection
Doc Date 2/5/1993 2/18/1993 2/23/1993 3/1/1993
Memo from Milner (DOE) to Kouts re: HQR0643900 Back-up Material for New RW Initiatives U.S. DOE, OCRWM, 1992 Annual HQR0381918 Capacity Report, DOE/RW-0412, March 1993 1995 Acceptance Priority Ranking and Annual Capacity Report Memo from Zabransky (WE) to Link re: Preliminary projection of spent fuel acceptance rate PBNP w/attachment PA102522 WISC00055958
0285 0286
PA102591 WISC00055959
No Objection No Objection
3/1/1993 3/8/1993
0287 0288 0289
Letter to Singh from Martin re WE ISFSI WISC00011065 docket no. 6630-CE-197 w/attachments Tomasoni (DOE) letter to Link (WE) WISC00000910
WISC00011073 WISC00000919 WISC00040624
No Objection No Objection No Objection
3/10/1993 3/10/1993 3/12/1993
Letter from Flamenbaum (NUS) to WISC00040621 Anundson (WE) re: Project Drawing and Specification Package PBNP ISFSI Security Project Letter to Dorr from Porter re PBNP ISFSI Docket no. 6630-CE-197 Letter from Parker (WE) to Jenkins (PSCW) re: PBNP ISFSI Docket no. 6630-CE-197 Letter from Parker (WE) to Jenkins (PSCW) re: ISFSI WISC00014725 WISC00054806
0290 0291
WISC00014726 WISC00054811
No Objection No Objection
3/16/1993 3/17/1993
0292
WISC00129830
WISC00129836
No Objection
3/17/1993
Confidential Work Product. Do Not Reproduce.
Page 32 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 33 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0293 Letter from Isaacs and Blanchard (DOE) WISC00124284 to Barrett (OCRWM), attaching A Proposed Alternative Strategy for the Department of Energy's Civilian Radioactive Waste Management System, prepared by the Task Force on an Alternative Program Strategy, March 31, 1993 0294 Letter from Zabransky (WE) to PSCW re: Independent Spent Fuel Storage Installation - PSCW File No. 6630-CE-197 Citizens Utility Board letter to Radioactive Waste Review Board Letter from Conlon (NUS) to Anundson (WE) re: Scope and Cost for Drawing and Specification Revisions U.S. DOE, OCRWM, 1992 Annual Capacity Report, Revision 1, May 1993 Zabransky (WE) presentation, Update on Multi-Purpose Canister (Universal Container) Systems Utility Perspective Letter from Barrett (DOE) to Cantlon (Nuclear Waste Technical Review Board) re: attached DOE response to Nuclear Waste Technical Review Board's recommendations Withdrawn Letter to Dums from Martin re WE WISC00000849 responses to Citizens Utility Board's 4th data request WISC00000849 WISC00040626 Bates - End WISC00124317 Government Objections No Objection
Doc Date 3/31/1993
WISC00040706
No Objection
4/5/1993
0295 0296
WISC00028267 WISC00040788
WISC00028272 WISC00040792
Authentication, Foundation, Hearsay, Relevance Authentication, Foundation, Hearsay, Relevance No Objection Authentication, Foundation, Relevance No Objection
4/13/1993 4/21/1993
0297 0298
PA102592 HQR0641971
PA102629 HQR0641978
5/1/1993 5/3/1993
0299
HQR0361109
HQR0361114
5/13/1993
0300 0301
Authentication, Foundation, Hearsay, Relevance No Objection 6/18/1993
Confidential Work Product. Do Not Reproduce.
Page 33 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 34 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0302 Withdrawn 0303 0304 0305 0306 Tomasoni (DOE) letter to Link (WE) voiding DCS No. 04-5401-4425 -01 Memo from Anundson (WE) to Maxfield re: Dry Fuel Storage Project Milestones Letter to DOE Contracting Officer from Link (WE) transmitting revised DCS Questions from Representative Hastert re: High Level Waste - Q&A prepared by Alan Brownstein Wisconsin Electric, MSA Permanent Transactions - Control Report Bates - Begin WISC0303-0001 WISC00040793 WISC00000875 HQR0101635 Bates - End WISC0303-0001 WISC00040796 WISC00000876 HQR0101636 Government Objections No Objection No Objection No Objection No Objection Authentication, Foundation, Relevance, Hearsay No Objection No Objection
Doc Date 7/2/1993 7/8/1993 7/16/1993 7/29/1993
0307 0308 0309 0310
WISC00008462
WISC00008492 WISC00124319
8/15/1993 9/2/1993 9/22/1993 9/24/1993
Letter from Barrett (OCRWM) to Shetler WISC00124318 (SMUD) re: DOE acceptance of SNF Tomasoni (DOE) letter to Link (WE) approving revised DCS Letter from Boeshaar (WE) to Hagman (PSCW) re: Point Beach Steam Generator/ISFSl Docket 6630-CE-197, attaching forecast WE memo re: spent fuel pool inventory Letter from Barrett (OCRWM) to Dicks (U.S. House of Representatives) re: DOE acceptance of SNF Memo from Kohrt (WE) re: 24 Feed Feasibility Team Meeting Minutes October 5, 1993 Withdrawn
HQO.19931005.00 HQO.19931005.0 No Objection 10.00001 010.00005 WISC00012161 WISC00012162 No Objection
0311 0312
WISC00020841 WISC00124320
WISC00021014 WISC00124321
No Objection No Objection
9/30/1993 10/4/1993
0313
WISC00061058
WISC00061059
No Objection
10/11/1993
0314
No Objection
Confidential Work Product. Do Not Reproduce.
Page 34 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 35 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0315 "DOE Management Strategy and Plan for the Interim Storage of Spent Fuel," presentation by Lake Barrett (DOE) before the Nuclear Waste Technical Review Board Engineered Barrier System, Transportation and Systems Joint Panel Meeting 0316 Bates - Begin HQR0601810 Bates - End HQR0601826 Government Objections Authentication, Foundation, Relevance
Doc Date 11/1/1993
Letter from Parker (WE) to Hagman WISC00012150 (PSCW) re: Point Beach Nuclear Plant Independent Spent Fuel Storage Installation Project Economic Analyses Undepreciated Balance Draft Public Service Commission staff economic analysis, re: cost effective operation of the Point Beach Nuclear Plant WISC00129837
WISC00012152
No Objection
11/4/1993
0317
WISC00129849
No Objection
11/19/1993
0318
The Transportation Operations Project HQV19940228002 HQV1994022800 No Objection Office, Point Beach Nuclear Station 1 21 Units 1 and 2, Wisconsin Electric Power .00001 .00033 Company: Site and Facility Waste Transportation Services Planning Document Memorandum from Dreyfus (DOE) to Sec. of Energy re: Information: Policy Issues Regarding the Civilian Radioactive Waste Management Program Note from Zabransky to Brownstein re: UWASTE MEETING Memo from Fieldhack(WE) re: Spent Fuel Pool Summary, attachment HQR0101604 HQR0101605 No Objection
12/1/1993
0319
12/6/1993
0320 0321
HQR0060562 WISC00041016
HQR0060562 WISC00041017
No Objection No Objection
12/9/1993 12/16/1993
Confidential Work Product. Do Not Reproduce.
Page 35 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 36 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name Bates - Begin 0322 Letter from Dreyfus (DOE) to Clark HQR0431095 (Florida Public Service Commission) re: responsibilities of the Department of Energy in implementing the radioactive waste management program 0323 "Nuclear Waste Technical Review HQR0644315 Board Full Board Meeting - Subject: Update on the Multipurpose Canister Concept," presentation by Milner (DOE) Wisconsin Electric Power Company, Nuclear Power Department 1994-1998 Business Plan Statement of Ronald A. Milner, Associate Director of Storage and Transportation, OCRWM, DOE, before the Minnesota State Legislature Committee on Jobs, Energy, and Community Development WISC00010062 Bates - End HQR0431096 Government Objections No Objection
Doc Date 12/23/1993
HQR0644349
Authentication, Foundation, Hearsay 1/11/1994
0324
WISC00010065
No Objection
1/14/1994
0325
HQR0361057
HQ-0361066
No Objection
1/27/1994
0326
State of Wisconsin, Draft Environmental WISC00003840 Impact Statement, Point Beach Nuclear Power Plant Projects Proposed by Wisconsin Electric Power Company Nuclear Fuel Data Form RW-859 for Point Beach 1 with transmittal letter Nuclear Fuel Data Form RW-859 for Point Beach 2 with transmittal letter Memorandum from O'Leary (Secretary of Energy) to Dreyfus (DOE) re: program guidance HQR3640683 HQR3640761 HQR0290592
WISC0004091
No Objection
2/1/1994
0327 0328 0329
HQR3640760 HQR3640803 HQR0290595
No Objection No Objection No Objection
2/10/1994 2/10/1994 2/18/1994
Confidential Work Product. Do Not Reproduce.
Page 36 of 115
Case 1:00-cv-00697-JFM
Document 338-2
Filed 08/31/2007
Page 37 of 115
8/31/2007 4:15 PM
Wisconsin Electric Power Company v. United States, No. 00-697C
Defendant's Objections to Plaintiff's Exhibits Wepco Pl... Full Name 0330 Presentation: "Interim Storage Options" - Briefing to Dan Dreyfus, presented on February 8, 1994; revised March 8, 1994