Free Exhibit List - District Court of Federal Claims - federal


File Size: 110.0 kB
Pages: 39
Date: September 1, 2006
File Format: PDF
State: federal
Category: District
Author: unknown
Word Count: 10,497 Words, 65,547 Characters
Page Size: Letter (8 1/2" x 11")
URL

https://www.findforms.com/pdf_files/cofc/13048/256-2.pdf

Download Exhibit List - District Court of Federal Claims ( 110.0 kB)


Preview Exhibit List - District Court of Federal Claims
Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 1 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Description August 1, 2005, Support Binder A - Damages August 1, 2005, Support Binder A - Summary August 1, 2005, Support Binder A - Would-Have-Been Costs August 1, 2005, Support Binder A - Actual Costs August 1, 2005, Support Binder A - Escalation/Discounting August 1, 2005, Support Binder B - Fuel Management August 1, 2005, Support Binder B - Fuel Management - Actual Scenario August 1, 2005, Support Binder B - Fuel Management - Would-Have-Been Scenario August 1, 2005, Support Binder B - Discharges And Acceptances (ERI) August 1, 2005, Support Binder B - Dry Cask Loading Plan August 1, 2005, Support Binder B - Xcel Energy Annual Nuclear Waste Management Report August 1, 2005, Support Binder B - Multi-Purpose Canister System Evaluation August 1, 2005, Support Binder B - Preliminary Design Report Executive Summary August 1, 2005, Support Binder B - Other Fuel Management Support Documents August 1, 2005, Support Binder C - Cost Of Capital August 1, 2005, Support Binder C - Cost Of Capital - Actual Returns August 1, 2005, Support Binder C - Cost Of Capital - Electric Jurisdictional Annual Reports August 1, 2005, Support Binder D - Escalation August 1, 2005, Support Binder D - Consumer Price Index (CPI) August 1, 2005, Support Binder D - Handy-Whitman Cost Trends Of Electric Utility Construction August 1, 2005, Support Binder D - Excerpts From Decommissioning Funding Status Reports August 1, 2005, Support Binder E - Prairie Island ISFSI Cost Estimates August 1, 2005, Support Binder E - Cask Procurement August 1, 2005, Support Binder E - Casks 18-20 August 1, 2005, Support Binder E - Casks 21-24 August 1, 2005, Support Binder E - Casks 25-29 August 1, 2005, Support Binder E - Procurement Proposals August 1, 2005, Support Binder E - Cask Loading Costs August 1, 2005, Support Binder E - ISFSI Operations And Maintenance August 1, 2005, Support Binder E - TN40 Transportability August 1, 2005, Support Binder E - TN40 H August 1, 2005, Support Binder E - Transnuclear Contracts
Page 1 of 39

Begin Bates KRGNSP14524 KRGNSP14528 KRGNSP14537 KRGNSP14548 KRGNSP14603 KRGNSP13683 KRGNSP13687 KRGNSP13700 KRGNSP13714 KRGNSP13728 KRGNSP13738 KRGNSP13752 KRGNSP13906 KRGNSP13925 KRGNSP09300 KRGNSP09304 KRGNSP09308 KRGNSP09144 KRGNSP09148 KRGNSP09157 KRGNSP09228 KRGNSP11439 KRGNSP11443 KRGNSP11445 KRGNSP11461 KRGNSP11490 KRGNSP11502 KRGNSP11585 KRGNSP11827 KRGNSP11837 KRGNSP11879 KRGNSP11927

End Bates KRGNSP14527 KRGNSP14536 KRGNSP14547 KRGNSP14602 KRGNSP14605 KRGNSP13686 KRGNSP13699 KRGNSP13713 KRGNSP13727 KRGNSP13737 KRGNSP13751 KRGNSP13905 KRGNSP13924 KRGNSP13951 KRGNSP09303 KRGNSP09307 KRGNSP09391 KRGNSP09147 KRGNSP09156 KRGNSP09227 KRGNSP09234 KRGNSP11442 KRGNSP11444 KRGNSP11460 KRGNSP11489 KRGNSP11501 KRGNSP11584 KRGNSP11826 KRGNSP11836 KRGNSP11878 KRGNSP11926 KRGNSP11962

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 2 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 Description August 1, 2005, Support Binder F - Monticello ISFSI Cost Estimates August 1, 2005, Support Binder F - ISFSI Licensing, Engineering And Construction August 1, 2005, Support Binder F - Cask Procurement Costs August 1, 2005, Support Binder F - Cask Loading Costs August 1, 2005, Support Binder F - ISFSI Operations And Maintenance August 1, 2005, Support Binder F - ISFSI Baseline Schedule And Supporting Documents August 1, 2005, Support Binder F - Auxiliary Building Crane Upgrade August 1, 2005, Support Binder G - Past Actual Costs (Summaries) August 1, 2005, Support Binder G - Past Actual Cost Summaries August 1, 2005, Support Binder G - Accounting Report Column Descriptions August 1, 2005, Support Binder G - LFMS Accounting System (NSP 1988-2000) August 1, 2005, Support Binder G - JD Edwards Accounting System (NSP 2001 - 2004) August 1, 2005, Support Binder G - SAP Accounting System (NMC Accounting System) August 1, 2005, Support Binder G - Labor Distribution System Column Descriptions August 1, 2005, Support Binder G - Description Of Overhead Charges August 1, 2005, Support Binder H - Would-Have-Been Costs August 1, 2005, Support Binder H - Rerack August 1, 2005, Support Binder H - Monticello Cask Loading August 1, 2005, Support Binder H - Prairie Island Cask Loading August 1, 2005, Support Binder H - Rail Spur Upgrade August 1, 2005, Support Binder I - Historical Financial Information (10K's) August 1, 2005, Support Binder J - Historical Financial Information (FERC Form 1's) August 1, 2005, Support Binder K - Standard Contracts August 1, 2005, Support Binder K - Prairie Island Standard Contract August 1, 2005, Support Binder K - Monticello Standard Contract August 1, 2005, Support Binder K - Morris Standard Contract August 1, 2005, Support Binder L - Prairie Island Certificate Of Need August 1, 2005, Support Binder L - Application For Certificate-Of-Need For Prairie Island (W/ Appendices) August 1, 2005, Support Binder L - Order Granting Limited Certificate Of Need August 1, 2005, Support Binder M - Monticello Past Costs August 1, 2005, Support Binder M - Accounting Report August 1, 2005, Support Binder M - Invoices
Page 2 of 39

Begin Bates KRGNSP13317 KRGNSP13321 KRGNSP13341 KRGNSP13483 KRGNSP13520 KRGNSP13528 KRGNSP13650 KRGNSP12854 KRGNSP12858 KRGNSP12884 KRGNSP12857 KRGNSP13025 KRGNSP13031 KRGNSP13033 KRGNSP13035 KRGNSP11042 KRGNSP11046 KRGNSP11112 KRGNSP11114 KRGNSP11116 KRGNSP02695 KRGNSP08162 KRGNSP07967 KRGNSP07970 KRGNSP08034 KRGNSP08098 KRGNSP03736 KRGNSP03740 KRGNSP04103 KRGNSP08773 KRGNSP08777 KRGNSP08779

End Bates KRGNSP13320 KRGNSP13340 KRGNSP13482 KRGNSP13519 KRGNSP13527 KRGNSP13649 KRGNSP13682 KRGNSP12857 KRGNSP12883 KRGNSP12884 KRGNSP13024 KRGNSP13030 KRGNSP13032 KRGNSP13034 KRGNSP13036 KRGNSP11045 KRGNSP11111 KRGNSP11113 KRGNSP11115 KRGNSP11121 KRGNSP02812 KRGNSP08391 KRGNSP07969 KRGNSP08033 KRGNSP08097 KRGNSP08161 KRGNSP03739 KRGNSP04102 KRGNSP04138 KRGNSP08776 KRGNSP08778 KRGNSP09143

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 3 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 65 65a 66 67 68 68a 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 84a 85 86 87 88 89 90 91 92 93 Description August 1, 2005, Support Binder N - Purchase Orders August 1, 2005, Support Binder O - Purchase Orders August 1, 2005, Support Binder P - Prairie Island ISFSI Licensing, Engineering And Construction August 1, 2005, Support Binder P - Accounting Report August 1, 2005, Support Binder P - Invoices August 1, 2005, Support Binder Q - Invoices August 1, 2005, Support Binder Q - Purchase Orders August 1, 2005, Support Binder Q - Other August 1, 2005, Support Binder R - Prairie Island ISFSI Licensing, Engineering And Construction August 1, 2005, Support Binder R - Summary 73.49.88-19 August 1, 2005, Support Binder R - Accounting Reports 73.49.88-19 August 1, 2005, Support Binder R - Invoices 73.49.88-19 August 1, 2005, Support Binder R - Purchase Orders 73.49.88-19 August 1, 2005, Support Binder R - Other 73.49.88-19 August 1, 2005, Support Binder R - Summary 74.27.79-19 August 1, 2005, Support Binder R - Accounting Reports 74.27.79-19 August 1, 2005, Support Binder R - Invoices 74.27.79-19 August 1, 2005, Support Binder R - Purchase Orders 74.27.79-19 August 1, 2005, Support Binder R - Other 74.27.79-19 August 1, 2005, Support Binder S - Prairie Island Dry Storage Casks 1-7 August 1, 2005, Support Binder S - Accounting Reports August 1, 2005, Support Binder S - Invoices August 1, 2005, Support Binder T - Invoices August 1, 2005, Support Binder U - Purchase Orders August 1, 2005, Support Binder U - Other August 1, 2005, Support Binder V - Prairie Island Dry Storage Casks August 1, 2005, Support Binder V - Accounting Reports August 1, 2005, Support Binder V - Invoices August 1, 2005, Support Binder V - Purchase Orders August 1, 2005, Support Binder V - Other August 1, 2005, Support Binder W - Prairie Island Dry Storage Casks 13-17 August 1, 2005, Support Binder W - Accounting Reports
Page 3 of 39

Begin Bates KRGNSP06309 KRGNSP06696 KRGNSP05415 KRGNSP05421 KRGNSP05529 KRGNSP08392 KRGNSP08543 KRGNSP08771 KRGNSP02813 KRGNSP02815 KRGNSP02819 KRGNSP02850 KRGNSP03029 KRGNSP03039 KRGNSP03042 KRGNSP03046 KRGNSP03072 KRGNSP03128 KRGNSP03137 KRGNSP01429 KRGNSP01434 KRGNSP01504 KRGNSP01832 KRGNSP07529 KRGNSP07961 KRGNSP00769 KRGNSP00774 KRGNSP00814 KRGNSP01206 KRGNSP01341 KRGNSP04771 KRGNSP04775

End Bates KRGNSP06693 KRGNSP06973 KRGNSP05420 KRGNSP05527 KRGNSP05801 KRGNSP08542 KRGNSP08770 KRGNSP08772 KRGNSP02814 KRGNSP02818 KRGNSP02849 KRGNSP03028 KRGNSP03038 KRGNSP03041 KRGNSP03045 KRGNSP03071 KRGNSP03127 KRGNSP03136 KRGNSP03138 KRGNSP01433 KRGNSP01502 KRGNSP01830 KRGNSP02203 KRGNSP07960 KRGNSP07966 KRGNSP00773 KRGNSP00813 KRGNSP01205 KRGNSP01340 KRGNSP01342 KRGNSP04774 KRGNSP04793

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 4 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 94 94a 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 Description August 1, 2005, Support Binder W - Invoices August 1, 2005, Support Binder X - Invoices August 1, 2005, Support Binder X - Purchase Orders August 1, 2005, Support Binder X - Other August 1, 2005, Support Binder Y - Prairie Island Dry Storage Casks 18-20 August 1, 2005, Support Binder Y - Accounting Report August 1, 2005, Support Binder Y - Invoices August 1, 2005, Support Binder Y - Purchase Orders August 1, 2005, Support Binder Z - Prairie Island Auxiliary Building Crane Upgrade August 1, 2005, Support Binder Z - Accounting Reports August 1, 2005, Support Binder Z - Invoices August 1, 2005, Support Binder Z - Purchase Orders August 1, 2005, Support Binder Z - Other August 1, 2005, Support Binder AA - Prairie Island Fiber Optic Installation August 1, 2005, Support Binder AA - Accounting Reports August 1, 2005, Support Binder AA - Invoices August 1, 2005, Support Binder AA - Purchase Orders August 1, 2005, Support Binder AA - Other August 1, 2005, Support Binder AB - Prairie Island Alternate Storage Site Investigation, Selection, Review And Permits August 1, 2005, Support Binder AB - Accounting Reports August 1, 2005, Support Binder AB - Invoices August 1, 2005, Support Binder AB - Purchase Orders August 1, 2005, Support Binder AB - Other August 1, 2005, Support Binder AC - Prairie Island Alternate Storage Site Investigation, Selection, Review And Permits August 1, 2005, Support Binder AC - Accounting Reports August 1, 2005, Support Binder AC - Invoices August 1, 2005, Support Binder AC - Purchase Orders August 1, 2005, Support Binder AC - Other August 1, 2005, Support Binder AD - Prairie Island NRC Fees August 1, 2005, Support Binder AD - Accounting Reports
Page 4 of 39

Begin Bates KRGNSP04794 KRGNSP05049 KRGNSP05303 KRGNSP05413 KRGNSP06974 KRGNSP06978 KRGNSP06980 KRGNSP07478 KRGNSP00002 KRGNSP00007 KRGNSP00073 KRGNSP00207 KRGNSP00368 KRGNSP01367 KRGNSP01372 KRGNSP01375 KRGNSP01379 KRGNSP01383 KRGNSP02221 KRGNSP02226 KRGNSP02253 KRGNSP02567 KRGNSP02692 KRGNSP00564 KRGNSP00569 KRGNSP00584 KRGNSP00743 KRGNSP00766 KRGNSP05803 KRGNSP05807

End Bates KRGNSP05048 KRGNSP05302 KRGNSP05412 KRGNSP05414 KRGNSP06977 KRGNSP06979 KRGNSP07477 KRGNSP07528 KRGNSP00006 KRGNSP00072 KRGNSP00206 KRGNSP00367 KRGNSP00370 KRGNSP01371 KRGNSP01374 KRGNSP01378 KRGNSP01382 KRGNSP01384 KRGNSP02225 KRGNSP02252 KRGNSP02566 KRGNSP02691 KRGNSP02693 KRGNSP00568 KRGNSP00583 KRGNSP00742 KRGNSP00765 KRGNSP00767 KRGNSP05806 KRGNSP05880

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 5 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 123 124 125 126 127 127a 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 Description August 1, 2005, Support Binder AD - Invoices August 1, 2005, Support Binder AD - Other August 1, 2005, Support Binder AF- Prairie Island Renewable Development Fund August 1, 2005, Support Binder AF - Accounting Reports August 1, 2005, Support Binder AF - Invoices August 1, 2005, Support Binder AG - Invoices August 1, 2005, Support Binder AH - Contracts August 1, 2005, Support Binder AH - Other August 1, 2005, Support Binder AI - Prairie Island Private Fuel Storage August 1, 2005, Support Binder AI - Accounting Reports August 1, 2005, Support Binder AI - Invoices August 1, 2005, Support Binder AJ - Prairie Island Private Fuel Storage August 1, 2005, Support Binder AJ - Accounting Reports August 1, 2005, Support Binder AJ - Invoices August 1, 2005, Support Binder AJ - Time Sheets August 1, 2005, Support Binder AJ - Employee Expense Reports August 1, 2005, Support Binder AK - Training Videos For Dry Cask Storage August 1, 2005, Support Binder AK - Accounting Report August 1, 2005, Support Binder AK - Invoices August 1, 2005, Support Binder AL - Other Support Documents August 1, 2005, Support Binder AL - Findings Of Fact, Conclusions And Order (MN EQ Board) August 1, 2005, Support Binder AL - Rerack Information And History August 1, 2005, Support Binder AL - Spent Nuclear Fuel Strategic Plans August 1, 2005, Support Binder AL - Spent Fuel Pool Capacity August 1, 2005, Support Binder AL - Spent Fuel Management Alternatives Available To NSP August 1, 2005, Support Binder AL - Application For Renewed Operating License August 1, 2005, Support Binder AL - License Renewal Application Filed For Monticello Nuclear Plant August 1, 2005, Support Binder AL - An Examination Of Alternatives: Project Is Most Reasonable And Prudent Alternative August 1, 2005, Support Binder AL - Goodhue County ISFSI August 1, 2005, Support Binder AL - Correspondence Between DOE And NSP August 1, 2005, Support Binder AM - DOE Documents
Page 5 of 39

Begin Bates KRGNSP05881 KRGNSP05995 KRGNSP10539 KRGNSP10543 KRGNSP10548 KRGNSP09392 KRGNSP09837 KRGNSP10537 KRGNSP00372 KRGNSP00375 KRGNSP00408 KRGNSP04139 KRGNSP04143 KRGNSP04305 KRGNSP04379 KRGNSP04419 KRGNSP02205 KRGNSP02208 KRGNSP02214 KRGNSP13037 KRGNSP13041 KRGNSP13063 KRGNSP13069 KRGNSP13098 KRGNSP13103 KRGNSP13115 KRGNSP13132 KRGNSP13135 KRGNSP13159 KRGNSP13302 KRGNSP03139

End Bates KRGNSP05994 KRGNSP05999 KRGNSP10542 KRGNSP10547 KRGNSP11041 KRGNSP09836 KRGNSP10536 KRGNSP10538 KRGNSP00374 KRGNSP00407 KRGNSP00562 KRGNSP04142 KRGNSP04304 KRGNSP04378 KRGNSP04418 KRGNSP04430 KRGNSP02207 KRGNSP02213 KRGNSP02219 KRGNSP13040 KRGNSP13062 KRGNSP13068 KRGNSP13097 KRGNSP13102 KRGNSP13114 KRGNSP13131 KRGNSP13134 KRGNSP13158 KRGNSP13301 KRGNSP13316 KRGNSP03143

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 6 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 Description August 1, 2005, Support Binder AM - Report On Financing The Disposal Of Commercial Spent Nuclear Fuel And Processed High-Level Radioactive Waste August 1, 2005, Support Binder AM - Civilian Radioactive Waste Management Program Mission Plan, Volume I (Draft) August 1, 2005, Support Binder AM - Proceedings Of The 1983 Civilian Radioactive Waste Management Information Meeting August 1, 2005, Support Binder AM - Draft 1988 Mission Plan Amendment August 1, 2005, Support Binder AM - Annual Capacity Report 1988 August 1, 2005, Support Binder AM - Report To Congress On Reassessment Of The Civilian Radioactive Waste Management Program August 1, 2005, Support Binder AM - Spent Nuclear Fuel Discharges From U.S. Reactors, (1994) August 1, 2005, Support Binder AM - Office Of Civilian Radioactive Waste Management Curriculum: Unit 1 August 1, 2005, Support Binder AM - Analysis Of The Total System Life Cycle Cost Of The Civilian Radioactive Waste Management Program (12/98) August 1, 2005, Support Binder AM - Analysis Of The Total System Life Cycle Cost Of The Civilian Radioactive Waste Management Program (5/01) August 1, 2005, Support Binder AM - Acceptance Priority Ranking & Annual Capacity Report (7/04) August 1, 2005, Support Binder AM - Civilian Radioactive Waste Management System Requirements Document, Revision 6 August 1, 2005, Support Binder AM - Summary - Statement Of Theodore J. Garrish, Deputy Director, Office Of Civilian Radioactive Waste Management August 1, 2005, Support Binder AP - TN-40 Transport License August 1, 2005, Support Binder AP - Accounting Reports August 1, 2005, Support Binder AP - Invoices August 1, 2005, Support Binder AP - Purchase Orders August 1, 2005, Support Binder AQ - Monticello Certificate Of Need August 1, 2005, Support Binder AR - Publicly Available Information August 1, 2005, Support Binder AR - 1 August 1, 2005, Support Binder AR - 2 August 1, 2005, Support Binder AR - 3 August 1, 2005, Support Binder AR - 4 August 1, 2005, Support Binder AR - 5
Page 6 of 39

Begin Bates KRGNSP03144 KRGNSP03174 KRGNSP03293 KRGNSP03302 KRGNSP03359 KRGNSP03385 KRGNSP03417 KRGNSP03422 KRGNSP03433 KRGNSP03516 KRGNSP03595 KRGNSP03677 KRGNSP03720 KRGNSP01344 KRGNSP01347 KRGNSP01349 KRGNSP01358 KRGNSP06000 KRGNSP04431 KRGNSP04436 KRGNSP04540 KRGNSP04566 KRGNSP04569 KRGNSP04571

End Bates KRGNSP03173 KRGNSP03292 KRGNSP03301 KRGNSP03358 KRGNSP03384 KRGNSP03416 KRGNSP03421 KRGNSP03432 KRGNSP03515 KRGNSP03594 KRGNSP03676 KRGNSP03719 KRGNSP03735 KRGNSP01346 KRGNSP01348 KRGNSP01357 KRGNSP01365 KRGNSP06308 KRGNSP04435 KRGNSP04539 KRGNSP04565 KRGNSP04568 KRGNSP04570 KRGNSP04574

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 7 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 Description August 1, 2005, Support Binder AR - 6 August 1, 2005, Support Binder AR - 7 August 1, 2005, Support Binder AR - 8 August 1, 2005, Support Binder AR - 9 August 1, 2005, Support Binder AR - 10 August 1, 2005, Support Binder AR - 11 August 1, 2005, Support Binder AR - 12 August 1, 2005, Support Binder AS - Prairie Island ISFSI - Tribal Community Settlement Agreement August 1, 2005, Support Binder AS - Accounting Report August 1, 2005, Support Binder AS - Invoices August 1, 2005, Support Binder AS - Other August 1, 2005, Support Binder AT - Morris Costs August 1, 2005, Support Binder AT - Accounting Report August 1, 2005, Support Binder AT - Invoices August 1, 2005, Support Binder AT - Morris Contract And Settlement August 1, 2005, Support Binder AU - Strategist Inputs - Biomass Contracts August 1, 2005, Support Binder AU - St. Paul Cogeneration August 1, 2005, Support Binder AU - NGPP August 1, 2005, Support Binder AU - Fibrominn August 1, 2005, Support Binder AU - Biomass Power Mandate August 1, 2005, Support Binder AX - Future Renewable Development Fund Costs August 1, 2005, Support Binder AX - Other August 1, 2005, Support Binder AY - Biomass Power Costs - Past Costs Errata - Revised Damages (6/19/06) June 19, 2005, Support Binder RA - Damages Model - Amended June 19, 2005, Support Binder RA - Summary June 19, 2005, Support Binder RA - Would-Have-Been Costs June 19, 2005, Support Binder RA - Actual Costs June 19, 2005, Support Binder RA - Escalation/Discounting Max Delong Deposition Transcript: (4/14/06) Exhibit Not Used Jim Milkovich Deposition Transcript: (7/31/06)
Page 7 of 39

Begin Bates KRGNSP04575 KRGNSP04744 KRGNSP04752 KRGNSP04757 KRGNSP04759 KRGNSP04765 KRGNSP04768 KRGNSP01386 KRGNSP01388 KRGNSP01390 KRGNSP01393 KRGNSP09235 KRGNSP09239 KRGNSP09241 KRGNSP09248 KRGNSP11963 KRGNSP11984 KRGNSP12170 KRGNSP12291 KRGNSP12423 KRGNSP11354 KRGNSP11381 KRGNSP12435 N/A N/A N/A N/A N/A N/A N/A N/A N/A

End Bates KRGNSP04743 KRGNSP04751 KRGNSP04756 KRGNSP04758 KRGNSP04764 KRGNSP04767 KRGNSP04770 KRGNSP01387 KRGNSP01389 KRGNSP01392 KRGNSP01427 KRGNSP09238 KRGNSP09240 KRGNSP09243 KRGNSP09299 KRGNSP11963 KRGNSP12166 KRGNSP12279 KRGNSP12392 KRGNSP12434 KRGNSP11380 KRGNSP11438 KRGNSP12579 N/A N/A N/A N/A N/A N/A N/A N/A N/A

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 8 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 Description Exhibit Not Used Exhibit Not Used Mike Sellman Deposition Transcript: (3/15/06) Mike Schwartz Deposition Transcript: (7/18/06) Ed Watzl Deposition Transcript: (6/15/06) Exhibit Not Used Dr. Jonathan A. Neuberger Deposition Transcript: (8/28/06) John D. Leonard, Jr. Deposition Transcript: (8/30/06) R. Larry Johnson Deposition Transcript: (8/29/06) Dr. Jonathan A. Neuberger Deposition And Trial Transcript: Southern Nuclear Dr. Jonathan A. Neuberger Deposition And Trial Transcript: Indiana Michigan PI TN-40 Dry Cask Training Videos Decommissioning Cost Study For The Prairie Island Nuclear Generating Plant (3/90) Decommissioning Cost Study For The Prairie Island Nuclear Generating Plant (5/93) Decommissioning Cost Study For The Monticello Nuclear Generating Plant (5/93) Decommissioning Cost Study For The Monticello Nuclear Generating Plant (2/90) Decommissioning Cost Estimate For The Monticello Nuclear Generating Plant Decommissioning Cost Estimate For The Prairie Island Nuclear Generating Station Units 1 And 2 Decommissioning Cost Study For The Monticello Nuclear Generating Plant Decommissioning Cost Study For The Prairie Island Nuclear Generating Plant Nuclear Decommissioning And Depreciation Decommissioning Studies Application For Resource Plan Approval (1996 - 2012) Order Approving NSP'S 1995 Resource Plan As Modified Application For Resource Plan Approval 1994 - 2008 Order Approving NSP'S 1993 Resource Plan As Modified Application For Resource Plan Approval (1998-2012) Application For Resource Plan Approval (1992 - 2006) Petition Of Approval Of 1991 Resource Plan Application For Resource Plan Approval (2002) Application For Resource Plan Approval (2004) Letter From UNWMG To Christopher Jedrey (4/28/87)
Page 8 of 39

Begin Bates N/A N/A N/A N/A N/A N/A N/A N/A N/A TBD TBD NSP-0069758 NSP-0002313 NSP-0002383 NSP-0002464 NSP-0002530 NSP-0002586 NSP-0002677 NSP-0002783 NSP-0002868 NSP-0001464 NSP-0001838 NSP-0003615 NSP-0004213 NSP-0004236 NSP-0004885 NSP-0004913 NSP-0005387 NSP-0005843 N/A N/A CTR-006-0247

End Bates N/A N/A N/A N/A N/A N/A N/A N/A N/A TBD TBD NSP-0069764 NSP-0002382 NSP-0002463 NSP-0002529 NSP-0002585 NSP-0002676 NSP-0002782 NSP-0002867 NSP-0002966 NSP-0001469 NSP-0001842 NSP-0004212 NSP-0004235 NSP-0004884 NSP-0004912 NSP-0005386 NSP-0005842 NSP-0005863 N/A N/A CTR-006-0260

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 9 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 257 258 259 260 261 262 263 Description Letter From Eileen Supko To Michael Alissi (10/13/92) Exhibit Not Used 2002 Resource Plan Information Requests and Responses 2004 Resource Plan Information Requests and Responses Contract Between Department Of Justice And ABZ For Expert Services Brewer Report In PG&E (Excerpt) 2000 Resource Plan Information Requests and Responses 1998 Resource Plan Information Requests and Responses Newspaper Article: Tribe Says It Has Say On Nuclear Plant Newspaper Article: Statewide Survey Finds Most Minnesota Believe Xcel Energy And State Should Honor Nuclear Waste Promise... Newspaper Article: Prairie Island Power Struggle Newspaper Article: Senators Visit Tribe And Tour Nuclear Plant March 1995 Apr/ACR Excerpt 1987 Annual Capacity Report (DOE/RW-0146) Draft 1989 Annual Capacity Report 1990 Annual Capacity Report (DOE/RW-0294P) 1991 Annual Capacity Report (DOE/RW-0331P) 1992 Annual Capacity Report (DOE/RW-0412) Draft 1994 Acceptance Priority Ranking And Annual Capacity Report Final Draft ­ "Preliminary Analysis Of The Total System Life Cycle Cost Of The Commercial High-Level Radioactive Waste Disposal Program" By Roy F. Weston, Inc. Analysis Of The Total System Life Cycle Cost Of The Civilian Radioactive Waste Management Program (DOE/RW0236) Preliminary Estimates Of The Total-System Cost For The Restructured Program: An Addendum To The May 1989 Analysis Of The Total-System Life Cycle Cost For The Civilian Radioactive Waste Management Program (DOE/RW0295P) Analysis Of The Total System Life Cycle Cost Of The Civilian Radioactive Waste Management Program (DOE/RW0479) Analysis Of The Total System Life Cycle Cost Of The Civilian Radioactive Waste Management Program ­ (DOE/RW0510) (12-98) Total System Life Cycle Cost For Site Recommendation Letter Report
Page 9 of 39

Begin Bates ERINSP-02787 N/A NSP-0083526 NSP-0083658 SXM0280001 PXE0050001 NSP-0083769 NSP-0085176 NSP-0026032 NSP-0026134 NSP-0026130 NSP-0026110 HQR-029-0676 HQR-001-2705 EDB-001-0468 HQR-001-2487 HQR-001-2357 CTR-003-0558 EDB-001-0136 PNL-020-1491 PNL-107-1706 PNL-107-1603

End Bates ERINSP-02798 N/A NSP-0083657 NSP-0083768 SXM0280008 PXE0050036 NSP-0085175 NSP-0085460 NSP-0026033 NSP-0026134 NSP-0026133 NSP-0026111 HQR-029-0685 HQR-001-2792 EDB-001-0487 HQR-001-2609 HQR-001-2419 CTR-003-0602 EDB-001-0150 PNL-020-1657 PNL-107-1900 PNL-107-1705

264 265 266

HQR-025-5075 HQR-036-0006 CTR-158-2614

HQR-025-5139 HQR-036-0086 CTR-158-2628

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 10 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 Description Report On Financing The Disposal Of Commercial Spent Nuclear Fuel And Processed High-Level Radioactive Waste (DOE/S-0020/1) FY 1984 Program Guidance For Nuclear Waste Fund (NWF) Evaluations With J. White Cover Letter Nuclear Waste Fund Fee Adequacy: An Assessment. Second Annual Report (Second Report Of Series) Nuclear Waste Fund Fee Adequacy: An Assessment (DOE/RW-0020) (Third Report Of Series) Nuclear Waste Fund Fee Adequacy: An Assessment (DOE/RW-0020) 1986 Annual Review Of The Adequacy Of The 1.0 Mill Per Kwh Waste Disposal Fee Nuclear Waste Fund Fee Adequacy: An Assessment (DOE/RW-0291P) Nuclear Waste Fund Fee Adequacy: An Assessment (DOE/RW-0534) Draft ­ Civilian Radioactive Waste Management Program Mission Plan, Volume 1. Overview And Current Program Plans Mission Plan From The Civilian Radioactive Waste Management Program. Volumes I And Ii Of Ii Volumes. Overview And Current Program Plans ­ (DOE/RW-0005 Draft Reprinted July 1984) (4/84) Mission Plan For The Civilian Radioactive Waste Management Program ­ Volume 1 ­ Parts I & Ii (DOE/RW-0005) Draft Mission Plan Amendment With Comments On The Draft Amendment And Responses To The Comments (DOE/RW-0128) Draft 1988 Mission Plan Amendment (DOE/RW-0187) Civilian Radioactive Waste Management Program Plan ­ Volume 1 ­ Program Overview Memorandum From R. Morgan To NWPA Project Office Personnel Re: Implementation Of Nuclear Waste Policy Act Of 1982 Letter From J. Kearney To R. Morgan Re: Standard Contract For Disposal Of Spent Nuclear Fuel And/Or High Level Radioactive Waste Letter From R. Morgan To J. Kearney Re: Comments On Standard Contract Memorandum From R. Williamson To R. Morgan Et Al. Re: Mission Plan Strategy Overview Letter From R. Morgan To R. Stanford Enclosing First Volume Of Mission Plan Proceedings Of The 1983 Civilian Radioactive Waste Management Information Meeting: December 12-15, 1983 Program Overview [Conf-831217] Letter From T. Garrish To The Honorable J. Bennett Johnston Re: Answers To Questions Regarding Implementation Of NWPA General Accounting Office, Nuclear Waste: Operation Of Monitored Retrievable Storage Facility Is Unlikely By 1998 (Gao/Rced-91-194) ACR Issues Status Report
Page 10 of 39

Begin Bates PNL-020-2513 PNL-021-0233 PNL-021-1190 HQR-042-1222 HQR-042-1235 PNL-107-2117 IDF-002-2292 N/A SN045167[D] N/A HQR-003-1088 Y-PA-142069 N/A SN174276 EDB-003-0855 YDK023709 ZAB-001-1462 PNL-173-1282 SN045165 [D] SN069588 [D] N/A N/A HQR-003-0314

End Bates PNL-020-2569 PNL-021-0268 PNL-021-1198 HQR-042-1234 HQR-042-1251 PNL-107-2223 IDF-002-2317 N/A SN0454285 N/A HQR-003-1620 Y-PA-142138 N/A SN174362 EDB-003-0856 YDK023716 ZAB-001-1462 PNL-173-1288 SN045166 SN070015 N/A N/A HQR-003-0315

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 11 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 Description Notice Of Inquiry On Waste Acceptance Issues (59 Fed. Reg. 27007) Memorandum From R. Milner Re TSLCC Assumptions Package Attached: 1995 TSLCC Assumptions Package Civilian Radioactive Waste Management System, Waste Acceptance Requirements Document, Revision 1 Dcn01 (DOE/RW-0351) (5/95) Civilian Radioactive Waste Management System, Waste Acceptance Requirements Document, Revision 4 (DOE/RW0351) Spent Fuel Storage Requirements ­ The Need For Away-From-Reactor Storage (DOE/Ne-0002) Spent Fuel Storage Requirements ­ An Update Of DOE/Ne-0002 (DOE/Sr-0007) DOE Memo From R. Milner To L. Barrett Re: Proposed Assumptions And Close List For 1988 TSLCC Public Law 97-425, Nuclear Waste Policy Act Of 1983 (1/7/83) Public Law 100-203, Title V, Nuclear Waste Policy Amendments Act Of 1987 (12/22/87) Report On Financing The Disposal Of Commercial Spent Nuclear Fuel And Processed High-Level Radioactive Waste, DOE/S-0020/1 (7/83) Memo From J.F. Fletcher To R. J. Hall, Memo, Revised Waste Acceptance Schedule From Draft Mission Plan, Battelle Pacific Northwest Laboratories (1/24/84) Analysis Of The Total System Life Cycle Cost For The Civilian Radioactive Waste Management Program, DOE/RW0024 (4/85) Analysis Of Total System Life Cycle Cost Of The Commercial High-Level Radioactive Waste Disposal Program, DOE/RW-0047 (4/86) Draft Mission Plan Amendment, DOE/RW-0128 Draft (1/87) Mission Plan Amendment, DOE/RW-0128 (6/87) Pacific Northwest Laboratory, R. L. Engel, 1987 Annual Review Of The Adequacy Of The 1.0 Mill Per Kwh Waste Disposal Fee, Prepared For The U.S. Department Of Energy Under Contract De-Ac06-76Rlo 1830, Pnl-6288 (7/87) Analysis Of The Total Life Cycle Cost For The Civilian Radioactive Waste Management Program, DOE/RW-0047 (6/87) Exhibit Not Used Annual Capacity Report, DOE/RW-0191(1988) Final Version Dry Cask Storage Study, DOE/RW-0220 (2/89) Exhibit Not Used Mission Plan Amendment For The Civilian Radioactive Waste Management Program, RW-1 Review Draft (2/24/92) Exhibit Not Used
Page 11 of 39

Begin Bates N/A HQR-057-1493 N/A N/A Y-PA-100827 PNL-168-4293 PNL-102-0359 N/A N/A N/A N/A N/A N/A N/A N/A N/A

End Bates N/A HQR-057-1524 N/A N/A Y-PA-100842 PNL-168-4348 PNL-102-0377 N/A N/A N/A N/A N/A N/A N/A N/A N/A

306 307 308 309 310 311 312

N/A N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A N/A

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 12 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 Description Civilian Radioactive Waste Management System Throughput Rate Analysis Prepared By Systems Analysis For DOE (8/17/93) Acceptance Priority Ranking And Annual Capacity Report, Dow/RW-0457 (3/95) Acquisition Of Waste Acceptance And Transportation Services For The Office Of Civilian Radioactive Waste Management, Draft RFP Number De-Rp01-98RW00320 (9/98) Exhibit Not Used 1999 Design Basis Waste Input Report For Commercial Spent Nuclear Fuel, December 1999, Prepared For DOE By TRW Environmental Safety Systems, Inc. DOE, RW-859 Data (12/31//98) DOE, RW-859 Data (12/31/02) NRC Information Digest, 2002 Edition, Nureg-1350, Volume 14 (6/02) NRC Information Digest, 2004-2005 Edition, Nureg-1350, Volume 16 (2/05) U.S. Nuclear Power Plant Capacity Factors Through 2003 U.S. Nuclear Power Plant Power Updates Through 2004 Viability Assessment Of A Repository At Yucca Mountain, Preliminary Design Concept For The Repository And Waste Package, DOE/RW-0508, Volume 2 (12/98) Exhibit Not Used Operational Waste Stream Assumption For TSLCC Estimates Prepared For DOE By TRW (9/00) Waste Acceptance System Requirements Document, Revision 4, DOE/RW-0351 (1/02) Exhibit Not Used Exhibit Not Used Bechtel SAIC Company, LLC, Calculation Method For The Projection Of Future Spent Nuclear Fuel Discharges, TDRWAT-NU-000002 Rev 1 (2/02) B. McLeod And T. Pollog, Methodology For The Projection Of Spent Nuclear Fuel Discharges Exhibit Not Used December 2004 Letter From D. Zabransky Regarding Delivery Commitment Schedule Process July 2004 Instructions For Completing Delivery Commitment Schedule Form Lake Barrett Deposition Transcripts: 4/22/02; 4/23/02), (4/26/02), (5/8/02), (5/10/02), (5/14/02). Alan Brownstein Deposition Transcripts: (4/9/02); (4/10/02); (4/11/02); (5/23/02); (6/14/02). Michael Lawrence Deposition Transcripts: (5/20/02); (5/21/02). Ronald Milner Deposition Transcripts: (5/1/02), (5/2/02); (5/3/03); (5/7/02). Robert Morgan Deposition Transcripts: (3/21/02); (3/22/02); (6/25/02).
Page 12 of 39

Begin Bates N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

End Bates N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 13 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 Description Thomas Pollog Deposition Transcripts: (2/19/02); (4/11/02); (4/12/02); (5/14/02); (5/15/02); (5/16/02); (5/22/02); (12/17/03); (2/24/04); (2/25/05). David Zabransky Deposition Transcripts: (2/10/99); (4/17/02); (4/18/02); (4/19/02); (4/26/02); (6/5/02); (6/6/02); (1/28/04); (1/29/04); (2/26/04); (2/27/04); (5/4/04); (4/12/05); (10/20/05);(10/21/05); (11/1/05); (6/1/06). Christopher Kouts Deposition Transcripts: (6/4/99); (1/3/04); (2/19/04); (4/11/05). Trial Transcript, Indiana Michigan Power Co. V. United States, No. 98-486C (Hodges, J.) Trial Transcript, Yankee Atomic Electric Company Et Al. V. United States, No. 98-126C Et Al. (Merow, J.) Trial Transcript, SACRamento Municipal Utility District V. United States, No. 98-488C (Braden, J.) Trial Transcript, Tennessee Valley Authority V. United States, No. 01-249C (Lettow, J.) Trial Transcript, Southern Nuclear Operating Company Et Al. V. United States, No. 98-614C (Merow, J.) Trial Transcript, Pacific Gas And Electric Company V. United States, No. 04-0074C (Hewitt, J.) Exhibit Not Used Exhibit Not Used NSP Outage Est 2005-05-20.xls M.R. Shay, "How Much Fuel Should DOE. Commit To Accept," (11/19/84) Informal Note From K. Klein To J. Mcelvey, R. Bauer, R. Gale, And W. Bennett Re Waste Acceptance Schedule (8/7/84) L.L. Clark And S.M. Short, Preferred Repository Receipt Rates Based On Waste Management System Costs, Risk And Logistics Impacts Prepared For DOE By Pacific Northwest Laboratory (12/86) Lawrence Livermore National Laboratory, Spent Fuel Receipt Scenarios Study, Yucca Mountain Project (7/90) TRW Environmental Safety Systems, Inc., Throughput Rate Study (3/25/93) Flour Daniel, Inc., Throughput Rate Study Memo From R. Stein To T. Isaacs Re Review Of Predecisional Draft, Nuclear Waste Negotiator (Nwn) Support Information Book (4/19/90) Jeff Williams, Monitored Retrievable Storage Systems Studies, Summary Report And Additional Analyses, I'm Spent Fuel Seminar VII (1/90) Newspaper Article: Repairs Are Lesser-Known Cost, Risk Of Prairie Island Plant Newspaper Article: Prairie Island Tentative Agreement With Xcel Newspaper Article: Tribe, Xcel Agree On Waste Fuel Storage Newspaper Article: Prairie Island, Xcel Reach Tentative Pact On Nuclear Waste Storage Newspaper Article: Tribe Deal With Xcel Seen As Big Step Toward Passage Newspaper Article: Editorial Mixed Signals On Tribe Vote
Page 13 of 39

Begin Bates N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 20035 4222 ERINSP-02148 ERINSP-02126 NSP-0026049 NSP-0081640 NSP-0081638 NSP-0026037 NSP-0026036 NSP-0025988

End Bates N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 20035 4231 ERINSP-02159 ERINSP-02147 NSP-0026051 NSP-0081641 NSP-0081639 NSP-0026038 NSP-0026036 NSP-0025991

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 14 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 366 367 368 369 370 371 372 373 374 375 376 377 Description Newspaper Article: Pawlenty Details His Energy Policy Newspaper Article: Scott Wilensky: Xcel Is Already One Of The Nation's Leaders In Clean Energy Newspaper Article: House Passes Prairie Island Bill Newspaper Article: Nuclear-Waste Bill Clears Senate Minnesota Public Utilities Commission Filing: Certificate Of Need For ISFSI Construction - NSP Request For Reconsideration Of Minnesota Public Utilities Commission Order Modifying Proposed Radiation Monitoring Plan Minnesota Public Utilities Commission Filing: Petition For Approval Of Biomass Phase I Power Purchase Agreement Comments From Attorney General NSP Annual Nuclear Waste Management Report 1998 NSP 1999 Review Of Nuclear Plant Decommissioning - Capital Asset Accounting Exhibit Not Used Conceptual Design For A Waste-Management System That Uses Multipurpose Canisters - DOE Report Waste Management '94 - Tucson, Arizona - The First Multipurpose Spent Fuel Container Reviewed By The U.S. NRC Letter: Charlie Bomberger To David Zabransky (DOE - Waste Acceptance) Re: Holdout On New Annual Capacity Review And NSP'S Intention To Not Submit Any Further Delivery Commitment Schedules Until Further Notice (10/2/02) Letter: Charlie Bomberger To David Zabransky (DOE - Waste Acceptance) Re: Acceptance Priority Ranking And Annual Capacity Review (9/30/04) Letter: Alan Hanson (Transnuclear) To Jon Kapitz Re: Transnuclear Urges NSP To Consider TN-40 Casks (6/2/94) Minnesotans For An Energy Efficient Economy Data Request Minnesotans For An Energy Efficient Economy's And Minnesota Center For Environmental Advocacy's Reply In Support Of Its Motion To Compel Discovery - Certificate Of Need For ISFSI At Monticello Administrative Law Judge Fourth Prehearing Order In The Matter Of Certificate Of Need For ISFSI At Monticello Certificate Of Need Application - Working Papers Data Request 059 - Monitored Retrievable Storage Probability By 1998 Docket No. E002/Cn-91-19 Request No. 608 Response Docket No. E002/Cn-91-19 Request No. 706 Response Docket No. E002/Cn-91-19 Request No. 707 Response Westinghouse Fuel Consolidation Program Evaluation Certificate Of Need Application W/ Appendices - Monticello ISFSI
Page 14 of 39

Begin Bates NSP-0025996 NSP-0025974 NSP-0025929 NSP-0025932 NSP-0041892 NSP-0052012 NSP-0001506 NSP-0006651 N/A NSP-0039598 NSP-0039612 NSP-0025719

End Bates NSP-0025997 NSP-0025974 NSP-0025929 NSP-0025934 NSP-0041894 NSP-0057042 NSP-0001520 NSP-0006777 N/A NSP-0039611 NSP-0039629 NSP-0025719

378 379 380 381 382 383 384 385 386 387 388 389

NSP-0025728 NSP-0039630 NSP-0053614 NSP-0054054 NSP-0054071 NSP-0039962 NSP-0059393 NSP-0003154 NSP-0003159 NSP-0003161 NSP-0072349 NSP-0052163

NSP-0025729 NSP-0039631 NSP-0053615 NSP-0054070 NSP-0054075 NSP-0040023 NSP-0059397 NSP-0003155 NSP-0003160 NSP-0003162 NSP-0072570 NSP-0052495

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 15 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 Description Supplement To Certificate Of Need Application - Monticello ISFSI Attachment To Minnesotans For An Energy Efficient Economy Data Request - Allocation Rights Mark McKeown's Testimony - Re: Certificate Of Need - Monticello ISFSI Full Core Offload Analysis NMC And Transnuclear Revision Regarding Spent Fuel Dry Storage System In Monticello Data Request 14 - Re: Projected Costs For The Replacement Of Canisters Containing Spent Fuel In The Event Of Corrosion Institute For Local Self-Reliance (ISLR) Comments On Completeness Of Monticello ISFSI Certificate Of Need Application Data Requests 13 And 14 Regarding Monticello ISFSI Certificate Of Need Spent Nuclear Fuel Strategic Plan Updates Prairie Island Spent Fuel Storage Technology Evaluation Report Prairie Island Dry Spent Fuel Storage System Evaluation And Recommendation Information Submittal In Connection With Order Granting Limited Certificate Of Need For Nuclear Waste Storage Facility At Prairie Island Prairie Island Certificate Of Need Filing And Order Prairie Island Certificate Of Need Filing And Order Cont. Elizabeth Engelking's Testimony - Re: Certificate Of Need - Monticello ISFSI Exhibit Not Used Data Request 33 - Docket E002/Cn-05-123 Data Request 11 - Docket E002/Cn-05-123 Distributed Generation As An Alternative To The Monticello Generating Station (8/5/05) Minnesota State Regulated Industries And Energy Committee Meeting Minutes NSP Biomass Generation Resource Request For Proposal Draft Approval Request For 50 Mw Of Biomass Generation Submittal Approval Request For 50 Mw Of Biomass Generation Meeting (11/2/95) Approval Request For 50 Mw Of Biomass Generation Meeting (2/1/96) Approval Request For 50 Mw Of Biomass Generation Meeting (5/16/96) Approval Request For 50 Mw Of Biomass Generation Meeting (8/22/96) Approval Request For 50 Mw Of Biomass Generation Meeting (1/30/97) Letter: Audrey Zibelman (NSP Energy Resource Planning) To Burl Haar (Minnesota Public Utilities Commission Exec) Re: Proposal For 50 Mw Of Biomass Power (1/22/96)
Page 15 of 39

Begin Bates NSP-0052696 NSP-0053610 NSP-0053966 NSP-0043497 NSP-0069085 NSP-0045953 NSP-0052539 NSP-0053439 NSP-0001617 NSP-0036987 NSP-0003035 NSP-0040912 NSP-0070163 NSP-0070202 NSP-0053949 N/A NSP-0046148 NSP-0045337 NSP-0045340 NSP-0055370 NSP-0051071 NSP-0051077 NSP-0050986 NSP-0050844 NSP-0050642 NSP-0050586 NSP-0048347 NSP-0050856

End Bates NSP-0053081 NSP-0053610 NSP-0053980 NSP-0043497 NSP-0069143 NSP-0045955 NSP-0052548 NSP-0053440 NSP-0001642 NSP-0037089 NSP-0003067 NSP-0040930 NSP-0070198 NSP-0070546 NSP-0053965 N/A NSP-0046150 NSP-0045339 NSP-0045386 NSP-0055378 NSP-0051076 NSP-0051093 NSP-0050988 NSP-0050855 NSP-0050661 NSP-0050590 NSP-0048357 NSP-0050858

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 16 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 Description Manitoba Hydro Bid (9/99) NSP Filing Application For Certificate Of Need Revision Docket E002/Cn-91-19 (6/10/91) NSP Filing Application For Certificate Of Need Volume 2 Of 2 (Environmental Impact Statement) Docket E002/Cn-9119 (4/91) Prairie Island Certificate Of Need Supplemental Information Docket E002/Cn-91-19 (6/91) Letter: John Closs To Distribution Re: Spent Fuel Delivery Commitment Schedule (10/26/92) Letter: M. Detmer To Hugo Simens Re: Standard Contract U.S. Department Of Energy Instructions For Completing The Delivery Commitment Schedule Letter: Charles Bomberger To Zabransky Re: Contract Number De-Cr01-83-Ne444000 (12/16/05) Spent Nuclear Fuel Management Meeting (9/13/95) Letter: Eileen Supko (ERI) To Jon Kapitz Re: Projection Of Spent Nuclear Fuel Acceptance Rates For NSP (12/1/98) Acceptance Priority Ranking Annual Capacity Report From DOE (3/95) General Comments And Instructions- Utility Information Provided To The DOE (1993) Spent Fuel Storage Pool Inventory Transmittal Manifest- Submittal Of Monticello Monthly Operating Report For (11/94) Internal Correspondence: D.G. Wegener To Terry Silverberg Re: Status Of Monticello FCS Fuel (12/7/84) Prairie Island And Monticello Correspondence And Project Descriptions Department Of Public Service Utility Information Request No. 112 (8/21/91) Feasibility Study For Wet Storage Capacity Expansion In Prairie Island Units One And Two Letter: J.N. Vance (Impel Corporation) To Max Delong Re: Feasibility Study For A Wet Basin Fuel Storage Facility (12/1/83) NSP Monticello And Prairie Island Nuclear Generating Plant Dry Storage Spent Fuel (9/21/84) Dry Cask Alternatives Study (11/95) Dry Cask Evaluation (Internal Correspondence To Distribution From J. Kapitz Regarding Dry Spent Fuel Storage Vendor Evaluations: (5/19/89). Business Plan (12/20/94) Private Fuel Storage LLC Spent Fuel Storage Project Projected Operating Profit (Loss) And Projected Cash FlowBusiness Plan Letter: Dianne Nielson (Eq) To Teryl Hunsaker Re: Proposed High Level Nuclear Waste Storage Facility Opportunity To Make Statements (6/16/00) Private Fuel Storage- Finding Real Solutions For Centralized Spent Fuel Storage By Scott Northard
Page 16 of 39

Begin Bates NSP-0069204 NSP-0063732 NSP-0062967 NSP-0070547 NSP-0043853 NSP-0043854 NSP-0043856 NSP-0025622 NSP-0043938 NSP-0001662 NSP-0043865 NSP-0044726 NSP-0044837 NSP-0043539 NSP-0068889 N/A NSP-0060395 NSP-0069355 NSP-0040024 NSP-0073881 NSP-0028036 NSP-0034765 NSP-0010493 NSP-0003166 NSP-0014659 NSP-0012717

End Bates NSP-0069354 NSP-0063810 NSP-0063731 NSP-0070732 NSP-0043853 NSP-0043854 NSP-0043864 NSP-0025623 NSP-0043946 NSP-0001685 NSP-0043934 NSP-0044738 NSP-0044850 NSP-0043549 NSP-0068895 N/A NSP-0060408 NSP-0069489 NSP-0040108 NSP-0074010 NSP-0028094 NSP-0034767 NSP-0010622 NSP-0003273 NSP-0014668 NSP-0012723

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 17 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 Description NSP General Computation Sheet With Handwritten Notes - Status Of Spent Fuel Storage As Of 12/31/88 NSP General Computation Sheet With Handwritten Notes - Things To Do (5/13) NSP General Computation Sheet With Handwritten Notes - DOE Meeting (5/27/99) NSP General Computation Sheet With Handwritten Notes - Table Title-ISFSI NSP General Computation Sheet With Handwritten Notes - Conclusion NSP General Computation Sheet With Handwritten Notes - DOE Meeting (5/7/98) NSP General Computation Sheet With Handwritten Notes - Sign In List (5/6/99) NSP General Computation Sheet With Handwritten Notes - Contacts NSP General Computation Sheet With Handwritten Notes - Attendance (5/17/99) Private Fuel Storage Presentation Exhibit Not Used Outline Of A Budget For The Rest Of Step 4 By J. Parkyn (09/13/98) Dairyland Power Fax To John Donnell From John Pauley (10/12/99) Expense To Maintain A Private Fuel Storage Startup Date In November 2003 Private Fuel Storage, Budget Step 4 Letter: Scott Northard To William Nelson (PFS) Re: Making An Appointment To Meet (2/28/00) Annual Nuclear Waste Management Report (Cover) Annual Nuclear Waste Management Report (Actual Report) Internal Correspondence: Jon Kapitz To Laura McCarten Re: Potential To Regain Spent Fuel Pool Space To Support 5/95 Outage (8/20/93) Letter: David Sparby To Burl Haar (Minnesota Public Utilities Commission) Re: Information Submittal - Order Granting Limited Certificate Of Need For Nuclear Waste Storage Facility At The Prairie Island (8/10/94) Letter: David Sparby To Burl Haar (Minnesota Public Utilities Commission) Re: Information Submittal - Order Granting Limited Certificate Of Need For Nuclear Waste Storage Facility At The Prairie Island (8/10/95) Internal Correspondence To Distribution From John Closs Regarding Annual Spent Fuel Report To Minnesota Public Utilities Commission (6/27/96) Letter: Jim Alders To Burl Haar (Minnesota Public Utilities Commission) Re: Information Submittal - Order Granting Limited Certificate Of Need For Nuclear Waste Storage Facility At The Prairie Island (8/9/96) Letter: Jim Alders To Burl Haar (Minnesota Public Utilities Commission) Re: Information Submittal - Order Granting Limited Certificate Of Need For Nuclear Waste Storage Facility At The Prairie Island (8/11/97) Letter: Northern American Water Office To Burl Haar Re: Comment And Petition Of The North American Water Office (8/21/98)
Page 17 of 39

Begin Bates NSP-0012552 NSP-0012508 NSP-0012509 NSP-0012510 NSP-0012511 NSP-0012505 NSP-0012503 NSP-0012485 NSP-0012455 NSP-0013403 N/A NSP-0014249 NSP-0014755 NSP-0014608 NSP-0014679 NSP-0013490 NSP-0040567 NSP-0040854 NSP-0040872 NSP-0040809 NSP-0040791 NSP-0040775 NSP-0040823 NSP-0040758 NSP-0040698

End Bates NSP-0012552 NSP-0012508 NSP-0012509 NSP-0012510 NSP-0012511 NSP-0012507 NSP-0012504 NSP-0012487 NSP-0012456 NSP-0013423 N/A NSP-0014253 NSP-0014758 NSP-0014608 NSP-0014745 NSP-0013491 NSP-0040870 NSP-0040877 NSP-0040822 NSP-0040808 NSP-0040790 NSP- 0040836 NSP-0040774 NSP-0040757

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 18 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 Description Letter: Jim Alders To Burl Haar (Minnesota Public Utilities Commission) Re: Information Submittal - Order Granting Limited Certificate Of Need For Nuclear Waste Storage Facility At The Prairie Island (8/10/98) Letter: Jim Alders To Burl Haar (Minnesota Public Utilities Commission) Re: Information Submittal - Order Granting Limited Certificate Of Need For Nuclear Waste Storage Facility At The Prairie Island (8/11/99) Letter: James Alders To Burl Haar - Re: Info Submittal In Connection With Limited Certificate Of Need For Nuclear Waste Storage Facility At Prairie Island (8/11/00) Letter: James Alders To Burl Haar - Re: Info Submittal In Connection With Limited Certificate Of Need For Nuclear Waste Storage Facility At Prairie Island (8/12/02) Letter: James Alders To Burl Haar - Re: Info Submittal In Connection With Limited Certificate Of Need For Nuclear Waste Storage Facility At Prairie Island (8/12/03) Letter: James Alders To Sharon Reguson (Mn Dept. Of Commerce) - Re: Response To Doc Data Request #1 (8/25/03) Letter: James Alders To Burl Haar - Re: Annual Nuclear Waste Management Report Submitted In Compliance W/ Limited Certificate Of Need For Storage At Prairie Island (8/11/04) Letter: James Alders To Burl Haar - Re: Annual Nuclear Waste Management Report Submitted In Compliance W/ Limited Certificate Of Need For Storage At Prairie Island (8/15/05) Scott Northard Deposition Errata (4/24/06) David Peterson Errata (5/17/06) Exhibit Not Used Workpapers For Expert Report Of R. Larry Johnson (7/11/06) Exhibit Not Used Workpapers For Expert Witness Report Of John D. Leonard, Jr (7/11/06) Exhibit Not Used 1994 Legislative Mn State Conference Committee Transcripts (4/29/94) Form RW-859 For Monticello (List Of All Fuel In Pool) Form RW-859 For Prairie Island 1 (List Of All Fuel In Pool) Form RW-859 For Prairie Island 2 (List Of All Fuel In Pool) Civilian Radioactive Waste Management System Requirements Document (CRD) DOE/RW-0406, 9/04 Dry Cask Alternatives Study November 1995 Revision 1: With Attachments And Figures Set Of Delivery Commitment Schedules And Letters From DOE To NSP (1993 - 1998) Letter; James Watkins To Allen Keesler (5/27/92) Letter; Jim Howard To James Watkins (9/18/91)
Page 18 of 39

Begin Bates NSP-0040685 NSP-0040669 NSP-0040645 NSP-0040626 NSP-0040606 NSP-0040602 NSP-0040585 NSP-0040568 N/A N/A N/A NXS005 0001 N/A NXS001 0001 N/A N/A NSP-0068913 NSP-0068980 NSP-0069053 N/A NSP-0001400 N/A HQR-008-0088 HQR-036-1193

End Bates NSP-0040697 NSP-0040684 NSP-0040668 NSP-0040644 NSP-0040625 NSP-0040605 NSP-0040601 NSP-0040584 N/A N/A N/A NXS005 0335 N/A NXS001 0178 N/A N/A NSP-0068979 NSP-0069052 NSP-0069083 N/A NSP-0001446 N/A HQR-008-0089 HQR-036-1194

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 19 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 Description Letter; John Tuck To James Howard (11/15/91) Department Of Energy Memorandum (11/19/91) Department Of Energy Memorandum (10/09/91) Letter; Jim Howard To James Watkins (4/15/92) NSP News Release; NSP Reacts To DOE Commitment (6/1/92) Letter; Krista Sanda (Minnesota Department Of Public Service) To James Watkins (9/30/91) Petition To The Department Of Energy Of The United States, Submitted By Krista Sanda (9/30/91) Letter; John Bartlett To Krista Sanda (10/25/91) Letter; John Bartlett To Krista Sanda (2/14/92) Letter; Krista Sanda To John Bartlett (2/26/92) Letter; John Bartlett To Krista Sanda (3/10/92) Letter; Allen Keesler Jr. To James Watkins (4/13/92) Letter; James Watkins To James Howard (5/29/92) Letter; Kris Sanda To James Watkins (8/19/92) Department Of Energy Memorandum (10/2/92) Letter; Hugo Pomrehn To Kris Sanda (11/4/92) Letter; Linda Stuntz To Krista Sanda (9/23/92) NSP Responses To Government Audit Requests Prairie Island Feasibility Study To Evaluate The Holtec Storage System Use At Prairie Island Engineering Economic Study For Prairie Island Dry Storage Of Spent Nuclear Fuel Evaluation Of ISFSI Bidders - Prairie Island Prairie Island Dry Storage Of Spent Nuclear Fuel Engineering Economy Study Delivery Commitment Schedules (1993-2005) Delivery Commitment Schedules (1993 & 1995) Mescalero Fuel Storage LLC Org Chart Annual Capacity Report (12/90) PFS Financial Analysis (12/20/94) Letter: NEI Re: Standard Contract Task Force (10/18/96) Procedural History Of Cask Suspension Letter: Transnuclear To NSP Re: Notification Of Work On Casks Up To Suspension (6/9/93) Letter: Dennis Ahlers (Mn Asst Atty General) To NSP Re: Request From State For NSP To Immediately Cease Cask Fabrication(7/21/93)
Page 19 of 39

Begin Bates HQR-008-0094 HQR-008-0095 HQR-008-0096 HQR-008-0086 NSP-0057429 CTR-001-2584 CTR-001-2469 HQR-043-0681 HQR-039-1435 CTR-003-1081 CTR-003-1080 HQR-036-1185 HQR-008-0083 HQR-043-0428 HQR-043-0626 HQR-043-0628 HQR-043-0668 NSPAUD00001 NSP-0029996 NSP-0040109 NSP-0034768 NSP-0034814 NSP-0025620 NSP-0025702 NSP-0010079 NSP-0002142 NSP-0010630 NSP-0037121 NSP-0040414 NSP-0034202 NSP-0034244

End Bates HQR-008-0094 HQR-008-0095 HQR-008-0096 HQR-008-0087 NSP-0057430 CTR-001-2584 CTR-001-2476 HQR-043-0681 HQR-039-1436 CTR-003-1081 CTR-003-1080 HQR-036-1186 HQR-008-0085 HQR-043-0429 HQR-043-0627 HQR-043-0629 HQR-043-0673 NSPAUD01567 NSP-0030239 NSP-0040119 NSP-0034779 NSP-0034824 NSP-0025675 NSP-0025718 NSP-0010080 NSP-0002160 NSP-0010652 NSP-0037127 NSP-0040415 NSP-0034206 NSP-0034244

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 20 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 524 525 526 527 528 529 530 531 532 533 Description Letter: NSP To Transnuclear Re: Notification Of Suspension Of Entire Project (8/4/93) Letter: Transnuclear To Jon Kapitz (8/31/93) Re: Suspension Options Letter: NSP To Transnuclear Re: NSP Authorizes Transnuclear To Resume Fabrication On First Two Casks Only (5/23/94) Letter: NSP To Transnuclear Re: Requests Fabrication Begin On Three Additional Casks [3-5] (6/3/94) Spreadsheet Outlining TN-40 Suspension Costs Letter: NSP To Transnuclear Re: NSP Requests To Begin Fabrication On Final Two Casks [6-7] (7/12//94) EEI Draft Memorandum In Support Of Petition For Rulemaking Re Standard Contract (3/18/85) Letter From EEI To Robert Morgan (3/7/83) Exhibit Not Used Letter From Con Edison To Christopher Jedrey (4/26/85) Begin Bates NSP-0034305 NSP-0034292 NSP-0034266 End Bates NSP-0034305 NSP-0034293 NSP-0034266

NSP-0034265 NSP-0034265 NSP-0034321 NSP-0034321 NSP-0034254 NSP-0034254 SMUD-0014889 SMUD-0014914 ADM002.0270 ADM002.0357 N/A N/A ST ST SERI DOE 1 SERI DOE 1 RFP 39 SUPPL 5- RFP 39 SUPPL 51 2 SERI DOE 1 SERI DOE 1 RFP 39 SUPPL 5- RFP 39 SUPPL 53 4 N/A N/A N/A N/A N/A N/A IMP0200001 IMP0200034 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
ST ST

534

Letter From Roger W. Gale To Henri M. Gueron (7/8/95)

535 536 537 538 539 540 541 542 543 544 545 546 547 548 549

Exhibit Not Used Exhibit Not Used Exhibit Not Used April 2000 Utility At-Reactor Spent Fuel Storage Costs For The Private Fuel Storage Facility Cost-Benefit Analysis, Revision 2 Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used
Page 20 of 39

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 21 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 Description Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Exhibit Not Used Statement Of Edward F. Sproat Iii, Before The Subcommittee On Energy And Air Quality, Committee On Energy And Commerce, U.S. House Of Representatives (7/19/06) EEI Letter To Robert Morgan Regarding Standard Contract For Disposal Of Spent Nuclear Fuel And/Or High Level Radioactive Waste-10 CFR Part 961 (3/7/83) NSP Letter To Stone And Webster From Patrick Charais Regarding An Invite (10/5/89) NSP News Economic Development At NSP (2/90) Plaintiff's Objections And Responses To Defendant's First Set Of Interrogatories And Request For Production (10/9/01) Exhibit Not Used Draft Mission Plan Amendment (9/91) ERI Letter To Jon Kapitz From Eileen Supko Regarding Request For Information From NSP (11/11/98) ERI Fax Cover To Jon Kapitz From Eileen Supko Regarding Historical Discharges (11/30/98) NSP Docs Received From Jon Kapitz- Projection Of Spent Nuclear Fuel Acceptance Rates For NSP (12/1/98) Internal Correspondence To Mark McKeown From Jon Kapitz Regarding Revised DOE Fuel Acceptance Rates (2/6/99) Moss And Barnett Cover Letter Regarding Prairie Island ISFSI Certificate Of Need (With Excerpt: 8/30/91) Begin Bates N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A HQR-052-0323 NSP-0024298 NSP-0027292 N/A N/A HQR-003-0798 NSP-0001836 NSP-0001835 NSP-0001661 NSP-0001556 NSP-0240038 End Bates N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A HQR-052-0400 NSP-0024320 NSP-0027315 N/A N/A HQR-003-1012 NSP-0001837 NSP-0001835 NSP-0001685 NSP-0001590 NSP-0240105

Page 21 of 39

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 22 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 Description Begin Bates End Bates NSP-0290447 NSP-0250406 NSP-0024425 N/A N/A N/A N/A NSP-0038316 NSP-0001734 NSP-0001868 NSP-0001794 N/A N/A NSP-0001867 NSP-0030677 NSP-0001433 NSP-0073880 NSP-0034198 NSP-0071958 NSP-0072002 NSP-0072033 NSP-0038390 NSP-0061054 NSP-0061144 NSP-0061553 NSP0061564.01 NSP-0061661 NSP-0061729 NSP-0061737

Letter: Michael Connelly To Richard Lancaster (10/9/92) Re: Application For A Certificate Of Need For Construction NSP-0290422 Of An ISFSI Minnesota Public Utilities Commission Docket No. E-002/Cn-91-19 Rebuttal Testimony - Ms. Laura McCarten (10/30/91) NSP-0250375 Licensing Report For Prairie Island- Spent Fuel Cask Drop Evaluation (1984) NSP-0024373 NRC Certificate Of Compliance For Radioactive Material Packages (7/2/03) N/A Cover Letter To Thomas Thompson From William Brach Regarding Certificate Of Compliance No. 9010 For The Model N/A No. Nli-1/2 Package (3/29/01) NRC Certificate Of Compliance For Radioactive Material Packages Issued To Transnuclear Inc. (5/16/01) N/A NRC Certificate Of Compliance Issued To Duratek (4/4/05) N/A Internal Correspondence To Scott Northard From Jon Kapitz Regarding Next Cask Order NSP-0038305 Letter To Distribution From John Closs With Attached Documents (10/26/92) NSP-0001724 Letter To Doug Antony From John Closs (8/27/93) NSP-0001868 DOE Appendix C NSP-0001794 Letter To David Austin From Beth Tomasoni With Appendix C Enclosed (12/6/93) N/A Letter To E.L. Watzl From Beth Tomasoni (3/13/97) N/A NSP'S Delivery Commitment Schedule Summary NSP-0001862 Letter To John Closs From David Dawson (5/5/95) NSP-0030676 Letter To Senator Novak From Laura McCarten Concerning Rerack Options NSP-0001431 Evaluation Of Accidental Load Drop Of Tn-40 Cask Into The Spent Fuel Pool No. 1 NSP-0073863 Overview Of Cask Options And Pool Capacities Around 1993 NSP-0034182 Structural Evaluation Of Spent Fuel Storage Rack For Consolidated Fuel At The Prairie Island Nuclear Generating Plant NSP-0071922 Structural Evaluation Of The Spent Fuel Storage Structure For Consolidated Fuel At Prairie Island Nuclear Generating PlantNSP-0071959 Structural Analysis Of Prairie Island Spent Fuel Pool Structure For Consolidated Fuel NSP-0072003 Unusable Cells In Pi Pool (6/9/93) NSP-0038388 Data Requests 6-21 NSP To Department Of Public Service (1991) NSP-0060968 Data Requests 1-3 NSP To Prairie Island Coalition (1991) NSP-0061055 Data Requests 1-11 From Prairie Island Coalition To NSP (1991) NSP-0061145 Public Utilities Commission Data Request - Status Of Cask Activity, Availability, And Feasibility Of Dual-Purposes NSP-0061554 Casks (4/99) Time Magazine "Nuclear Power - Do We Have A Choice?" (4/29/91) NSP-0061565 Electrical World "Special Report - Nuclear Power" (7/20/94) NSP-0061662 Northern States Power's Four Principles Regarding Nuclear Waste Storage (3/92) NSP-0061735
Page 22 of 39

Case 1:98-cv-00484-JPW

Document 256-2

Filed 09/01/2006

Page 23 of 39

Northern States Power Company v. United States , No. 98-484C Spent Nuclear Fuel Damages List Of Exhibits Exhibit 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 Description Energy And Nuclear Power-An Overview (5/91) Energy And Nuclear Power-An Overview (5/91) Budget Would Include Both Capital And Operating Goals Case #1 - Desirable Results - Confidential (6/23/92) Possible Cooperative Actions-Dept Of Public Services And NSP And NSP Responses To Administrative Law Judge Minnesota Society Of Professional Engineers Support Of The Certificate Of Need Article - "Perspective On Public Opinion" (4/92) Article In Radioactive Exchange - "DOE Denies Legal Obligation To Take Spent Fuel In 1998" (6/15/92) Minnesota "Certificate Of Need" Process (6/11/92) Article - Bartlett: Yucca In Jeopardy : Area May Get Nuke Waste Before 2000 (5/7/92) Prairie Island Certificate Of Need: Rate Increases Since 1970 (5/27/92) 1992 Timeline Prairie Island Activities Mn League Of Women Voters Position On Administrative Law Judge Recommendations (5/15/92) Prairie Island Plant Information Response Of Krista L. Sanda Along With Possible Cooperative Actions (1992) Annual Revenue Requirements For Prairie Island Plant Shutdown (12/4/91) Letter To Dave Sparby From Carl Lehmann - Costs Of Prairie Island Shutdown/Stretch-Out (4/23/92) Waste Disposal Reference Sheet Schedule Of Significant Events Prairie Island Spent Fuel Storage Facility State Tariff Processes Documents PowerPoint Presentation Of A Meeting About High Level Waste (3/13/92) A Strategy For Nuclear Power 1992 Action Plan Nuclear Waste Fund Fee Adequacy: An Assessment (11/90) Assignment Of Road Right Of Way Attachment A - 1 Draft Mission Plan Amendment (1/87) Commercial And Industrial Demand - Side Management Potential Volume 1 : Executive Summary (4/90) Northern States Power Company C&I Demand-Side Management Potential Study Cost And Savings Algorithms And Setup Values Xencap Measure Cost Study For Northern States Power Company Northern States Power Company Minnesota Demand - Side Potentials Study Volume 1 : Project Summary Maps Of Prairie Island Prairie Island Certificate Of Need: Rate Increases Since 1970 (8/10/91)
Page 23 of 39

Begin Bates NSP-0061738 NSP-0061763 NSP-0061793 NSP-0061794 NSP-0061797 NSP-0061800 NSP-0061816 NSP-0061821 NSP-0061826 NSP-0061834 NSP-0061835 NSP-0061837 NSP-0061849 NSP-0061854 NSP-0061858 NSP-0061882 NSP-0061893 NSP-0061894 NSP-0061895 NSP-0061897 NSP-0061910 NSP-0061921 NSP-0061956 NSP-0061981 NSP-0061988 NSP-0062048 NSP-0062099 NSP-0062296 NSP-0062341 NSP-0062422 NSP-0062429

End Bates NSP-0061762 NSP-0061792 NSP-0061793 NSP-0061796 NSP-0061799 NSP-0061802 NSP-0061820 NSP-0061825 NSP-0061827