Case 1:98-cv-00720-GWM
Document 449-10
Filed 12/07/2007
Page 1 of 1
Exhibit F Mill Inefficiency Costs On the Brann Contract
Production MBF (LT) from Brann Contract During Suspension *
1,141.88 1,141.88
Mill
Direct Manufacturing Cost Before Suspension **
63.98 42.63
Direct Manufacturing Cost During Suspension **
67.75 51.06
Difference
Increased Cost
Winslow Sawmill Winslow Planer
3.77 8.43
$
4,304.89 9,626.05 13,930.94
$ * Production from harvest of 913.5 MBF (LS) on Brann Contract during the Suspension Period ** Manufacturing Costs as specified in PX 131 Exhibit 15
F
Page 1 of 1