PUMP AND MOTOR EFFICIENCY TEST
(FOR ALL ELECTRIC PUMPS USE FORM DBB-019 (A))
COLORADO GROUND WATER COMMISSION Room 818 Centennial Building, 1313 Sherman Street Denver, CO 80203 NOTE: This form can only be used for wells located within a Designated Ground Water Basin.
This test is to determine the overall efficiency of the well (wire to water efficiency). All values, including pressure and input horsepower, must be measured on site. Note that well tests are performed several ways to obtain a variety of information. Providing a copy of this form to whoever does the test may help to insure that the correct procedure is followed. The test must be conducted by a certified well tester as determined by the State of Colorado. Provide a simple diagram of your irrigation system if you are now combining more than one type of irrigation (flood and sprinkler) or more than one sprinkler from the well. Locate existing meters, valves and pressure gauges. Include a brief explanation of your operating procedure. An example of a diagram is on the back of this form. Tests for the "expanded irrigated acres" application should be conducted late in the irrigation season, during August through October, when the ground water table is typically lower. Additional tests may be submitted at the applicant's option. The test shall determine a stabilized production rate and drawdown. This test must be conducted with the system under full operating conditions. If the well drives a sprinkler, the sprinkler must be connected and operating. A copy of the report of the person performing the test must be provided. At the least, such a report must include the following information: Well Permit No.____________________Well Location:___________________________________________________ Date Tested:___________________. Test performed by__________________________________________________ Company name __________________________________________________________________________________ Company address________________________________________________________________________________ Phone number________________________________________ Water Level While Pumping Feet _______ _______ _______ _______
Static Water Level _______ _______ _______ _______
Yield Under Operating Conditions GPM _______ _______ _______ _______
Pressure PSI _______ _______ _______ _______
Other* Head _______ _______ _______ _______
Total Head in Feet _______ _______ _______ _______
Measured Input Horsepower _______ _______ _______ _______
Efficiency Water HP/ Input HP _______ _______ _______ _______
(* "Other Head" is the difference in elevation plus any friction loss in feet between the point where the water level in the well is measured and the point where the pressure is measured.) Comments:______________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________
Example of an irrigation system diagram:
Valve Well
To ditch
To sprinkler Meter Pressure Gage